Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B12767, Submits Comments on Draft SRP Section 3.6.3, Leak-Before- Break Evaluation Procedures, Per Amend to GDC 4 of 10CFR50, App A.Utils Endorse Comments by Nuclear Util Group on Equipment Qualification + (15:04:26, 11 December 2024)
- DCL-84-045, Submits Design & Const Status of Design Change Notice DCO-EE-446 Re Control Room Ventilation & Pressurization Sys. Design & Const Complete.Repair,Testing Activities & Resolution Scheduled to Be Completed by 840215 + (15:04:27, 11 December 2024)
- ML20149E215 + (15:04:27, 11 December 2024)
- ML20149E209 + (15:04:28, 11 December 2024)
- ML20149E205 + (15:04:29, 11 December 2024)
- ML20149E204 + (15:04:30, 11 December 2024)
- ML20149E203 + (15:04:30, 11 December 2024)
- ML20149E202 + (15:04:31, 11 December 2024)
- ML20149E199 + (15:04:32, 11 December 2024)
- ML20149E200 + (15:04:32, 11 December 2024)
- ML20149E194 + (15:04:34, 11 December 2024)
- ML20149E196 + (15:04:34, 11 December 2024)
- PY-CEI-NRR-0763, Responds to NRC Re Violations Noted in Insp Rept 50-440/87-16.Corrective Actions:Instruction PTI-N27-P0001 Revised to Require Each Feedwater Pump Controller to Be Placed in Manual Prior to Testing Associated Feedwater Pump + (15:04:35, 11 December 2024)
- ML20149E191 + (15:04:36, 11 December 2024)
- ML20149E190 + (15:04:36, 11 December 2024)
- ML20149E185 + (15:04:37, 11 December 2024)
- ML20149E187 + (15:04:37, 11 December 2024)
- ML20149E184 + (15:04:38, 11 December 2024)
- IR 05000395/1987035 + (15:04:39, 11 December 2024)
- ML20149E182 + (15:04:40, 11 December 2024)
- JAFP-97-0242, Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant + (15:04:41, 11 December 2024)
- DCL-84-022, Requests Errata to Encl Sser 21,Page 2-185,Allegation 82. Review of Sser 21 Indicated Some Factural Errors on Markup of Page 2-185 + (15:04:42, 11 December 2024)
- ML20149E174 + (15:04:43, 11 December 2024)
- ML20149E173 + (15:04:43, 11 December 2024)
- ML20149E172 + (15:04:44, 11 December 2024)
- ML20149E168 + (15:04:45, 11 December 2024)
- ML20149E166 + (15:04:46, 11 December 2024)
- ML20149E162 + (15:04:47, 11 December 2024)
- ML20149E159 + (15:04:49, 11 December 2024)
- ML20149E161 + (15:04:49, 11 December 2024)
- ML20149E157 + (15:04:51, 11 December 2024)
- ML20149E153 + (15:04:52, 11 December 2024)
- ML20149E154 + (15:04:52, 11 December 2024)
- ML20149E152 + (15:04:53, 11 December 2024)
- ML20149E149 + (15:04:54, 11 December 2024)
- ML20149E148 + (15:04:54, 11 December 2024)
- IR 05000352/1997003 + (15:05:01, 11 December 2024)
- ML20149E143 + (15:05:02, 11 December 2024)
- ML20149E142 + (15:05:03, 11 December 2024)
- ML20149E139 + (15:05:04, 11 December 2024)
- ML20149E141 + (15:05:04, 11 December 2024)
- ML20149E136 + (15:05:06, 11 December 2024)
- ML20149E134 + (15:05:07, 11 December 2024)
- ML20149E133 + (15:05:08, 11 December 2024)
- DCL-84-082, Forwards Util Response to Sser 21,Item 23 Re Qualification of Pullman Power Products QC Welding Inspectors + (15:05:09, 11 December 2024)
- ML20149E130 + (15:05:10, 11 December 2024)
- 05000265/LER-1992-005-02, :on 920125,initiation of a Train Standby Gas Treatment Sys Occurred.Caused by Failure of Bypass Switch Mounting Bracket Due to Vibrations.Remounted Bypass Switch Back in 902-10 Panel & Tightened & Checked Other Switches + (15:05:12, 11 December 2024)
- IR 05000498/1987059 + (15:05:13, 11 December 2024)
- ML20149E124 + (15:05:14, 11 December 2024)
- ML20149E121 + (15:05:15, 11 December 2024)
- ML20149E118 + (15:05:16, 11 December 2024)