Forwards Insp Repts 50-352/97-03 & 50-353/97-03 on 970330-0527 & Notice of Violation
ML20149E121
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/11/1997
From: Swetland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20149E126 List:
References
50-352-97-03, 50-352-97-3, 50-353-97-03, 50-353-97-3, NUDOCS 9707180110
Download: ML20149E121 (3)


See also: IR 05000352/1997003

Text

{{#Wiki_filter:* ,. . ., July 11, 1997 Mr. D. M. Smith, President PECO Nuclear Nuclear Group Headquarters Correspondence Control Desk P. O. Box 195 Wayne, PA 19087-0195 SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-352/97-03, 50-353/97-03 AND NOTICE OF VIOLATION Dear Mr. Smith: From March 30,1997 through May 27,1997, the NRC completed an inspection at the Limerick Generating Station, Units 1 & 2. The enclosed report presents the results of that inspection. During the 8-week inspection period, the conduct of activities at Limerick 1 & 2 was generally characterized by safe and conservative operations. An inspection, conducted to review your investigation into the improper control of vital area and locked high radiation area keys, found that the investigation was thorough and complete and that appropriate compensatory measures were promptly implemented to mitigate any vulnerabilities until the potentially comp.omised locks could be changed. Based on the results of this inspection, the NRC hac determined that violations of NRC requirements occurred. The violations are cited in the enclosed Notice of Violation (NOV) and the circumstances surrounding them are described in detail in the subject inspection report. The first violation is of concern because several grand ma. ster keys were not properly controlled. Although it does not appear that the keys were misused, the potential was clearly present for several years. The second violation concerns an instance in September 1995, where a procedure was temporarily changed without a prior safety review, to avert a plant shutdown when primary water chemistry levels exceeded the procedural limits. Although the safety consequences were low for this instance, the NRC was concerned that the change was made using the wrong process, which bypassed the prior review required of an intent change to the procedure. The NRC has concluded that information regarding the reason for the violations, the corrective actions taken or planned to correct the violations and prevent recurrence is already adequately addressed in this inspection report, and in NRC Integrated Inspection Report 50-352/97-01, 50-353/97-01 for the radiological aspects of the key control issue. Therefore, you are not required to respond to this letter unless the description in the referenced reports does not accurately reflect your corrective actions or your position, in that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice. 3 Q7180110970711 l{{{llj}{\\\\{{{l)l {{{{{*{l{}l{l}}l'l{ ' g ADOCK 05000352 l

l PDR l l

. - _ , - _. . . -. . - . - - . - - . . - . . . . .. .- . - . - _ - . ' .', . ,. . l Mr. D. M. Smith 2 l l In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosures, and your response will be placed in the NRC Public Document Room (PDR). , , Sincerely, ORIGINAL SIGNED BY: Paul D. Swetland, Acting Chief Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-352,50-353 l License Nos: NPF-39, NPF-85 l l Enclosures: l 1. Notice of Violation 2. NRC Inspection Report 50-352/97-03, 50-353/97-03 cc w/encis: 1 G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing W. MacFarland, Vice President - Limerick Generating Station j J. L. Kantner, Manager, Experience Assessment Secretary, Nuclear Committee of the Board Commonwealth of Pennsylvania i 1 i i !' I !

_ . . _ . _ _ _ _ . . _ . ~ _. _ _ - . . - . ,__ . _ f (: .l '4 ..

,

.

  • .

. ~ Enclosure 1 3 Distribution w/encls: Region I Docket Room (with concurrences) '

l W. Axelson, DRA ! P. Swetland,' DRP K.' Gallagher, DRP D. Screnci, PAO , l NRC Resident inspector i. Nuclear Safety information Center (NSIC) l PUBLIC i L. _ Distribution w/encts: (Via E-Mail) l W. Dean, OEDO j. F. Rinaldi, NRR l J. Stolz, PDI-2, NRR i inspection Program Branch, NRR (IPAS) R. Correia, NRR F. Talbot, NRR . DOCDESK l i l ' i i ! i

! l i- l DOCUMENT NAME: G:\\ BRANCH 4\\lR970303. LIM i To ' receive e copy of this document, Indicate in the boa: 'C' = Copy [ijhout attachment / enclosure 'E' = Copy with attachment / enclosure 'N' = No copy f A ,[ j OFFICE Rl/DRPjff Rl/DRPj/fff l l g n [ NAME PERRYhVA h( SWETT M [ DATE 074/97 07 ( 97 . OFFICIAL RECORD COPY . 1 96d - . . . . }}