ML20149E204
| ML20149E204 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/11/1988 |
| From: | Lieberman J NRC OFFICE OF ENFORCEMENT (OE) |
| To: | James O'Reilly GEORGIA POWER CO. |
| References | |
| EA-87-100, NUDOCS 8801130253 | |
| Download: ML20149E204 (2) | |
Text
,
W5 j/"
UNITED STATES yx
' 't NUCLEAR REGULATORY COMMISSION 3.1
,j WASHING TON, D. C. 20555 y%;
- %..".'../
JAN 111988 Docket No. 50-424 License No. NPF-68 EA 87-100 i
Georgia Power Company ATTN: l!r. James P. O'Reilly Senior Vice President Nuclear Operations Post Office Box 4545 Atlanta, Georgia 30302 Gentlemen:
This will acknowledge receipt of your letter dated October 31, 1987 and your check for $200,000 in full payment for the civil penalty proposed by the NRC in a letter dated September 4, 1987.
Your response addressed corrective actions for violations cited in our letters of September 4 and October 1, 1987.
These actions will be examined during future inspections.
The items noted in our October 1, 1987 letter are considered to be additional examples of physical barrier violaticrs cited in the Notice of Violation and Proposed Imposition of Civil Penalties issued in September.
Since your response covered corrective actions for these items as well as those identified earlier, rc additional response is necessary.
)
/
W hamesLieberman, Director Office of Enforcement cc:
P. D. Rice, Vice President Project Engineering C. W. Hayes, Vogtle Quality Assurance f!anager G. Buckhold, Jr., General Manager Nuclear Operations I
4 J
lll113025R osooo<3,
,/
geoj2 swC a
e PDR 4
cf j.id
=
JAN' 11 Ba8 Georgia Power Company Distribution PDR.
SECY JTaylor, DEDRO JNGrace, RII JLieberman, OE RRosano, OE LChandler, OGC FIngram, PA Enforcement Coordinators RI, RII,~RIII, RIV, RV EJordan, AEOD BHayes, 01 SConnelly, 0IA JPartlow, NRR OE File EA File DCS I
f OE' h no JL M 4rman 1/q/88 1/cf/88