Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20149F504 + (14:49:40, 11 December 2024)
- ML20149F503 + (14:49:41, 11 December 2024)
- ML20149F500 + (14:49:42, 11 December 2024)
- ML20149F502 + (14:49:42, 11 December 2024)
- ML20149F496 + (14:49:43, 11 December 2024)
- ML20149F495 + (14:49:44, 11 December 2024)
- ML20149F493 + (14:49:48, 11 December 2024)
- ML20149F491 + (14:49:49, 11 December 2024)
- ML20149F488 + (14:49:56, 11 December 2024)
- 05000416/LER-1988-003, :on 880109,line Break Instrumentation for RHR a High Differential Pressure (Dp) Alarmed.Caused by Change in Normal Indication Dp Between LPCS & RHR a Injection Lines. Analysis Being performed.W880208 Ltr + (14:49:58, 11 December 2024)
- ML20149F486 + (14:49:59, 11 December 2024)
- ML20149F484 + (14:50:00, 11 December 2024)
- ML20149F483 + (14:50:01, 11 December 2024)
- 05000336/LER-1986-010, :on 861006,inconsistency Noted Between Safety Analysis & Tech Specs.Caused by Inconsistency Between Safety Analysis & Tech Specs.Administrative Controls Installed + (14:50:02, 11 December 2024)
- 05000423/LER-1988-004, :on 880118,control Bldg Isolation Signal Occurred from Train B Control Bldg Ventilation Sys Supply Air Duct Chlorine Detector.Caused by Failed Chlorine Detector.Sensing Element Replaced + (14:50:05, 11 December 2024)
- ML20149F474 + (14:50:06, 11 December 2024)
- ML20149F470 + (14:50:09, 11 December 2024)
- ML20149F468 + (14:50:10, 11 December 2024)
- ML20149F466 + (14:50:11, 11 December 2024)
- ML20149F464 + (14:50:12, 11 December 2024)
- ML20149F459 + (14:50:13, 11 December 2024)
- ML20149F461 + (14:50:13, 11 December 2024)
- ML20149F458 + (14:50:14, 11 December 2024)
- B16536, Forwards Response to NRC Re Violations & Civil Penalties Noted in Insp Repts 50-245/97-03,50-336/97-03 & 50-423/97-03 on 970203-07.Corrective Actions:Number of Safeguards Repositories on Station Have Been Reduced + (14:50:15, 11 December 2024)
- IR 05000354/1987028 + (14:50:17, 11 December 2024)
- ML20149F454 + (14:50:18, 11 December 2024)
- ML20149F451 + (14:50:19, 11 December 2024)
- PY-CEI-NRR-0801, Application for Amend to License NPF-58,revising Tech Spec 4.3.8.2.c to Allow one-time Extension for Disassembly & Insp of Turbine Overspeed Protection Sys Valves Until First Refueling Outage Scheduled for First Quarter 1989.Fee Paid + (14:50:19, 11 December 2024)
- ML20149F450 + (14:50:20, 11 December 2024)
- ML20149F447 + (14:50:22, 11 December 2024)
- ML20149F448 + (14:50:22, 11 December 2024)
- ML20149F446 + (14:50:23, 11 December 2024)
- 05000341/LER-1988-005, :on 880111,reactor Pressure Exceeded 150 Psig W/O HPSI Sys or RCIC Sys in Standby Lineup.Caused by Personnel Error.Individual Disciplined,Per Company Policy & Mgt Discussed Event W/Shift Supervisors + (14:50:25, 11 December 2024)
- ML20149F441 + (14:50:26, 11 December 2024)
- ML20149F436 + (14:50:27, 11 December 2024)
- ML20149F437 + (14:50:27, 11 December 2024)
- ML20149F430 + (14:50:30, 11 December 2024)
- ML20149F431 + (14:50:30, 11 December 2024)
- ML20149F428 + (14:50:31, 11 December 2024)
- ML20149F427 + (14:50:32, 11 December 2024)
- ML20149F426 + (14:50:33, 11 December 2024)
- ML20149F425 + (14:50:33, 11 December 2024)
- B12813, Proposed Tech Specs Re Halon 1301 Sys & Fire Detection Equipment + (14:50:34, 11 December 2024)
- ML20149F422 + (14:50:35, 11 December 2024)
- ML20149F423 + (14:50:35, 11 December 2024)
- ML20149F421 + (14:50:36, 11 December 2024)
- ML20149F419 + (14:50:36, 11 December 2024)
- ML20149F417 + (14:50:37, 11 December 2024)
- ML20149F416 + (14:50:38, 11 December 2024)
- ML20149F415 + (14:50:38, 11 December 2024)
- ML20149F413 + (14:50:41, 11 December 2024)
- ML20149F408 + (14:50:43, 11 December 2024)