Proposed Tech Spec Page 3/4 3.97,allowing one-time Extension for Disassembly & Insp Interval of Turbine Overspeed Protection Sys Valves Until First Refueling Outage
ML20149F468
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/10/1988
From:
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
Shared Package
ML20149F457 List:
References
NUDOCS 8802170186
Download: ML20149F468 (1)


Text

.

~

s I

INSTRUMENTATION

(

SURVEILLANCE REQUIREMENTS (Continued)

b. At least once per 18 months by perfo'rmance of a CHANNEL CALIBRATION >

of the turbine overspeed protection instrumentation.

c. At least once per 40 months *by disassembling at least one of each of the above valves and performing a visual and surface inspection of all valve seats, disks and stems and verifying no unacceptable flaws or excessive corrosion. If unacceptable flaws or excessive corrosion are found, all other valves of that type shall be inspected.
  • The initial surveillance test interval is extended on a one time basis to the First refueling outage.

(

1 1 1

l

+

l l

l l

l l

-PERRY - UNIT 1 3/4 3-97 l