Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151H066 + (11:30:25, 11 December 2024)
- ML20151H068 + (11:30:25, 11 December 2024)
- ML20151H064 + (11:30:26, 11 December 2024)
- ML20151H059 + (11:30:27, 11 December 2024)
- BSEP-88-0732, Advises That Corrective Actions for Unit 1 in Response to IE Bulletin 85-003 Complete,Per 880718 Telcons.Analysis to Support Plant Mods for Removal of Resistors Will Be Completed on 880719 for Unit 1 & on 880720 for Unit 2 + (11:30:28, 11 December 2024)
- ML20151H055 + (11:30:28, 11 December 2024)
- ML20151H054 + (11:30:29, 11 December 2024)
- PNO-V-88-048, on 880717,unit Manually Tripped & Natural Cooldown Commenced as Result of Ground Fault in 12 Kv non- Vital Buses.Event Investigation Team Formed to Determine Location & Cause of Ground Fault + (11:30:29, 11 December 2024)
- ML20151H050 + (11:30:30, 11 December 2024)
- ML20151H047 + (11:30:31, 11 December 2024)
- ML20151H044 + (11:30:32, 11 December 2024)
- ML20151H043 + (11:30:32, 11 December 2024)
- ML20151H039 + (11:30:33, 11 December 2024)
- ML20151H037 + (11:30:34, 11 December 2024)
- ML20151H032 + (11:30:35, 11 December 2024)
- ML20151H034 + (11:30:35, 11 December 2024)
- ML20151H028 + (11:30:36, 11 December 2024)
- ML20151H023 + (11:30:37, 11 December 2024)
- ML20151H027 + (11:30:37, 11 December 2024)
- ML20151H022 + (11:30:38, 11 December 2024)
- ML20151H019 + (11:30:39, 11 December 2024)
- ML20151H020 + (11:30:39, 11 December 2024)
- ML20151H018 + (11:30:40, 11 December 2024)
- ML20151H017 + (11:30:41, 11 December 2024)
- 05000498/LER-1988-024, :on 880316,discovered That Resetting Safeguards Test Cabinet Master Reset Would Reset & Block Safety Injection Actuation on Train A,B or C.Caused by Design Error.Design Change Issued to Modify Circuitry + (11:30:42, 11 December 2024)
- ML20151H015 + (11:30:46, 11 December 2024)
- ST-HL-AE-2714, Responds to NRC Re Violations Noted in Insp Rept 50-498/88-33.Corrective Action:Memo Issued on 880514 Stressing Responsibilities of Personnel Re Need for Detailed Planning & Understanding of Actions to Be Performed + (11:30:47, 11 December 2024)
- ML20151H013 + (11:30:47, 11 December 2024)
- ML20151H011 + (11:30:48, 11 December 2024)
- ML20151H010 + (11:30:49, 11 December 2024)
- ML20151H008 + (11:30:49, 11 December 2024)
- ML20151H006 + (11:30:50, 11 December 2024)
- ML20151H002 + (11:30:51, 11 December 2024)
- ML20151H001 + (11:30:51, 11 December 2024)
- 05000373/LER-1988-002-09, :on 880316,Type B & C Total Leakage Exceeded 0.6 La During Leak Rate Testing.Cause Undetermined.Valves Repaired as Necessary + (11:30:53, 11 December 2024)
- IR 05000225/1988002 + (11:30:55, 11 December 2024)
- ML20151G995 + (11:30:56, 11 December 2024)
- ML20151G993 + (11:30:57, 11 December 2024)
- ML20151G989 + (11:30:57, 11 December 2024)
- ML20151G986 + (11:30:58, 11 December 2024)
- ML20151G982 + (11:30:59, 11 December 2024)
- ML20151G985 + (11:30:59, 11 December 2024)
- ML20151G979 + (11:31:00, 11 December 2024)
- ML20151G978 + (11:31:01, 11 December 2024)
- ML20151G976 + (11:31:01, 11 December 2024)
- 05000498/LER-1987-026, :on 871212,discovered That Degraded Undervoltage Coincident W/Safety Injection Not Tested.Caused by Personnel Misinterpretation of Trip Actuation Devise Operational Test Requirements + (11:31:03, 11 December 2024)
- U-601164, Monthly Operating Rept for Mar 1988 + (11:31:04, 11 December 2024)
- ML20151G973 + (11:31:04, 11 December 2024)
- IR 05000334/1988015 + (11:31:06, 11 December 2024)
- ML20151G965 + (11:31:10, 11 December 2024)
- ML20151G961 + (11:31:10, 11 December 2024)