' g

~*

. ,*. x SSINS: 6835 Accession No.:

t 8107230046 IN 82-02 UNITED STATES NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 January 27, 1982 IE INFORMATION NOTICE NO. 82-02: WESTINGHOUSENBFDRELAYFAILbRE PROTECTION SYSTEMS AT CERTAIN NUCLEAR POWER PLANTS Discussion:

Westinghouse has notified the NRC of a higher-than-expected failure rate of Westinghouse type NBFD relay coils in reactor protection systems at certain power reactor plants. Investigation into the cause for failure revealed that, at high ambient temperature conditions, relay coils could fail due to the inductive voltage spike generated by the deerergization of the relay coil.

It was also determined that the relay coil failures have been confined to nonnally energized relays used in the reactor protection systems where high ambient temperature conditions exist due to heat generated by the normally energized relays.

To date, no failures of NBFD relay coils have been reported in safeguard cabinets where these relays are normally in a deenergized state and temperature conditions are normal.

After reviewing the NBFD relay problem, Westinghouse issued technical bulletin NSD-TB-81-14 on December 7, 1981 to Westinghouse-designed power plants using BFD or NBFD relays in the reactor protection and saieguard systems. An extract of this bulletin is attached for your information and appropriate use. The bulletin provides interim test methods for verifying the operability of normally deenergized and energized NBFD relay applications and reconinends i replacement of NBFD relays manufactured prior to January 1,1981. The bulletin 1 also provides relay coil numbers as well as data codes to facilitate affected licensees' replacement efforts if required.

q

'This information notice is provided as an early notification of a potentially significant matter. It is expected that recipients will review the information for applicability to their f acilities. No specific action or response is required at this time. If you have any questions regarding this matter, please

, contact the Regional Administrator of the appropriate ;;RC Regional Office.

Attachments:

1. Extract of Westinghouse technical bulletin NSD-TB-81-14, dated 12/7/81
2. Recently issued IE Information Notices f/0 7.2.360 d J h* ' .
  • ~

Attachment 1 IN 82-02 January 27, 1982 l Page 1 of 3 l l

EXTRACT OF WESTINGHOUSE TECHNICAL BULLETIN NSD-TB-81-14 Subject Number

, BFD (NBFD) RELAYS NSD-TB-81-14 System (s) Date REACTOR PROTECTION AND SAFEGUARDS SYSTEMS December 7,1981 Affected Plants 5.0.(s)

All those utilizing BFD or NBFD relays in the above systems. 385 References Sheet Of NSD-TB-79-5, 76-16, & 76-2. NRC IE BULLETIN 79-25 1 3 BACKGROUND This bulletin pertains to the modified Westinghouse BFD relays designated as NBFD with the style number 5072A49 (followed by the letter G and a two-digit number, depending on pole configuration) and with coil style number 1271C50G01.

The NBFD relay was first made available in December 1976. The purpose of this bulletin is to describe a Potential Substantial Safety Hazard attributable to the Westinghouse NBFD relay in certain applications.

Westinghouse has been notified of NBFD relay coil failures which have occurred in the reactor protection cabinets at certain sites. As a result, Westinghouse initiated an investigation to determine the failure mechanism involved. It was concluded that at high ambient temperature, relay coils could burn open due to an inductively induced voltage spike generated upon de-energization of the relay.

NBFD relay coil failures have been confined to the normally energized relays in the reactor protection rack where high ambient temperature conditions exist due to heat generated by the normally energized relays.

NBFD relays located in the safeguards cabinets are normally de-energized, and are energized to provide safeguards actuation. To date, no failures of NBFD relay coils have been reported in the safeguards cabinet. NBFD relays located in the safeguards cabinets are not subject to high temperature conditions due to the normally de-energized state. Also cyclic tests performed quarterly at the relay vendor show no abnormal coil failure.

Since an undetected open coil condition in the safeguards actuation circuitry (however remote) would prevent actuation of functions important to safety, it was reported by Westinghouse as a potential safety hazard for those plants which utilize these relays in the safeguards cabinet.

.g

-n P ,,, +

x Attachmen .

. IN 82-02 January 27, 1982 Page 2 of 3 EXTRACT OF WESTINGHOUSE TECHNICAL BULLETIN NSD-TB-81-14 (continued)

INTERIM RECOMMENDATIONS Westinghouse recommends the following interim measures for normally de-energized and nonnall'y energized N8FD relays.

(A) NORMALLY DE-ENERGIZED APPLICATIONS In normally de-energized applications, test for continuity of the relay

' coil and amend applicable test procedures to require a continuity test following every energized /de-energize cycle of the relay, including cycles required by periodic test procedures.

Westinghouse plants with provisions for-on-line test capability can utilize these ]rovisions to verify continuity of the NBFD relay coils. Those plants which do not] have on-line test capability should make use of portable test equipment to verify the continuity for each N8FD relay coil.

(a) Plants with on-line test capability:

Utilize established test procedures nonnally used during periodic on-line testing. These procedures which utilize the white test lamps provide indication of coil continuity.

(b) Plants without on-line test capability:

Utilize a volt-ohm meter to check resistance across the NBFD relay coil leads. If relays are connected in parallel, use the parallel resistance law to determine if any coil is open. If any parallel combination gives indication of an open coil, each individual coil must be checked to determine the failed coil.

(B) NORMALLY ENERGlZED APPLICATIONS Although open relay coils in normally energized applications result in the system (i.e. reactor trip) falling into a safe state tending to trip the reactor, Westinghouse reconnends the following: When the relay is energized (after a previous de-energization), visually verify that the armature has moved to the pulled-in position by observing the pushbuttons atop the contact assembly. The relay is energized if the pushbuttons protrude from the assembly by no more than 1/8 inch.**

    • NOTE: Manual depression of pushbuttons should result in no inward mo,emer..

of the armature of an energized relay and may be used if desired in lieu M ,

visual verification.

  • * * * *$**** a ---e +e me- eme e w w m w, ,. p ,,  %. . , _ , , . .,, .
    • e

n

,\

s. '

'6' .' Attachment 1 IN 82-02 January 27, 1982

' Page 3 of 3 EXTRACT OF WESTINGHOUSE TECHNICAL BULLETIN NSD-TB-81-14 (continued)

LONG TERM RECOMMENDATIONS Relays manufactured after January 1,1981 incorporate additiona'l (mylar) insulating material which has been confirmed by tests to resolve coil burnout by high voltage spikes generated when the relay coil current is interrupted.

It is recommended that the utility consider installing this improved coil during the next scheduled outage.

Relay coils with improved insulating material manufactured after January 1981 bear the style number 1271C50G01 and a date code, visible on the unmounted coil.

Those enils manufactured after October 28, 1981 bear the style number 1293C51G01 such that code date verification is unnecessary.

Contact your Westinghouse Nuclear Service Division representative...for additional information pertaining to replacement cofis.

To preclude excessive heating of the NBFD relay coil and degradation of coil in-sulation, Westinghouse reaffirms its recommendations for review of station battery charging procedures, such that the NBFD relay coils should not be l

subject to battery equalization voltages in excess of the coil rating. Caution should be exercised to ensure that charging voltage be limited to 140 VDC and that charging at 140 VDC be limited to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration if the previous r chargingperiod[ occurred]...lessthan30 days [previously].