ML20151G978

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1988
ML20151G978
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/31/1988
From: Mike Williams, Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
WM-88-0092, WM-88-92, NUDOCS 8804200204
Download: ML20151G978 (7)


Text

,_

.]

i*-

Attachment to WM 88-0092

~

~

April i3,1988 ll, s

L

.i s

WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF. CREEK GENERATING STATION ~

N0tfrHLY OPERATING REPORT MONTH:

March YEAR:

1988 Docket tio.:

50-482 Facility Operating License No.: NPF-42 j

Report No.

37 Prepared by:

Merlin G. Williams i

f I

l l

~

8804200204 880331

\\

\\

PDR ADOCK 05000482 R

DCD L'

. Attachtnent to WM 88-0092 April 13,1988 SUtf%RY The following report highlights the operating experience of Wolf Creek Generating Station for the month of March, 1988. 'Ihis report is being provided pursuant to Technical Specification 6.9.1.8.

I.

SUMGRY OF OPERATING EXPERIENCE

~ The Unit operated near 100 percent power throughout the month.

II.

t%JOR SAFETY RELATED ?%INTENANCE ACTIVITIES 1.

Replaced the jacket water heater temperature switch on one emergency diesel.

,i 2.

Replaced two circuit boards in the solid state protection system.

3.

Replaced a relay in the engineered safety features actuation system.

4.

Replaced a gear in a Limitorque Valve operator in the refueling water storage system.

Wolf Creek Generating Station Monthly Operating Report thrch 1988 Page 1 of 5

' Attachment'to WM 88-0092-

^

00

~

OPERATING DATA REPORT DOCKET NO.

50-482 WOLF CREEK GENERATING STATION WOLF CHEEK NUCLEAR OPERATING CORPORATION DATE 04-01-88 COMPLETED BY M. Williams TELEPHONE 316-364-8831 OPERATING STATUS

.l.

Reporting Perioi:

March, y 8 Gross Hours ir. Reporting Period: 744 2

Currently Authorized Powe7 : wel(!Ec) : 3411 Max. Depend. Capacity (tMe-Net): 1128 Design Electrical Rating (tMe-Net):

1170 3.

Power Level to Which Restricted (If Any) (Mwo-Net):

N/A 4.

Reasons for _estriction (If Any):

N/A This Month Yr to Date Cumulati"o

-5 Number of Hours Reactor was Critical 744.0 1,580.6 17,047.1 6.

Reactor Reser'te Shutdown Hours 0.0 89.5 339.8 _

7.

Hours Generator on Line 744.0 1,427.4 16,630J 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

9.. Gross Thermal Energy Generated (tM1) 2,526,972 4,75LJ04 54,126,458 10 Gross Electrical Energy Generated (tMI) 891,867 1,648,260 18,837,151
11. Net Electrical Energy Generated (Mi) 858,455 1,562,80,9_ 17,933,275

.12 Reactor Service Factor 100.0 72.4 75.5

13. Reactor Availability Factor 100.0 _

76.5 77.0

14. Unit Service Factor 100.0 65.4 73.6
15. Unit Availability Factor 100.0 65.4 73.6
16. Unit Capacity Factor (Using MDC) 102.3 63.4 70.4
17. Unit Capacity Factor (Using Design tMe) 98.6 61.2 67.9
18. Unit Forced Outage Rate 0.0 31.0 _

7.7

19. Shutdowns Scheduled Over Next 6 Months (Type, Date, arx1 Duration of each):

None.

20.

If Shut Dcran at End of Report Period, Estimated Date of Startup:

N/A Wolf Creek Generating Station Monthly Operating Report March 1988 Page 2 of 5 L

.' Attachment to WM 88-0092 g, -

"April-13,;1988 c.'

. AVERAGE DAff,Y. UNIT POWER LEVEL.

DOCKEC No.

50-482 WOLF CREEK GENERATING STATION WOLF CREEK NtrLEAR OPERATING CORPORATION DATE 04-01-88 COMPLETED BY M. Williams-TELEPHONE 316-364-8831 M0erIH March, 1988 DAY AVERME DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (tWe-Net)

(MWe-Net) l' 1157 17 1154

.2 1155 18 1141

!3 1155 19 1141 4

1156 20 1157 5

1156 21 1146 6

1156 22 1156 7

1156 23 1155 i

8 1157 24 1154 9

1157 25 1155 10 1156 26

'55

,11 1156 27 1156 t

12 1155 28 1155 13 1156 29 1154 14 1143 30 1155 p

15 1156 31 1152 l

16 1156 h

l i

Wolf Creek Generatin] Station i

Monthly Operating Report thrch 1988 Paga 3 of 5 t

Attachment to WM 88-0092.

April 13, 1988 UNIT SHUTDOWN AND PONER REDUCTIONS DOCKET NO.

50-482 WOLF CREEK GENERATING STATION <

WOLF CREEK NUCLEAR OPERATING CORPORATION <

DATE '94-01-88 COMPLETED BY M. Williams--

REPORT 10!ITH tiarch, 1988 TELEPHONE 316-364-8831 TYPE ME'rHODS CHtrPTING F: FORCED DURATION REASON DOWN THE REACIOR CORRECTIVE ACTIONS /COMMEMPS No Date S: SCHEDULED (HOURS)

(1)

OR REDUCING POWER (2)

.\\

l 1

i i

4 SIR 9ERY: The unit operated near 100 percent throughout the month, i

4 (1)

REASON: A: EQUIPMErff FAILURE (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:

1.

MANUAL B: MAINTEtRNCE OR TEST F: ADMINISTRATIVE 2.

MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3.

AtrTOMATIC SCRAM

'j D: REGULATORY RE;ITRICTION H: OTHER (EXPLAIN) 4.

OTHER (EXPLAIN) l 1

Wolf Creek Generating Station Monthly Operating Report March 1988 mp 4 of 5 b

,~,

,m.

,m.-,--. -

m n,-

m, -

~

.-.?

Attachment to WM 88-0092 p*;

' April 13, 1988 y

WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 M0tml March, 1988 SUtM\\RY OF OPERATING L{PERIENCE Litted below in chronological sequence is a sumary of operating experiences for this month which required load reduction or resulted in significant non-load related incidents.

DATE, TIME EVENT March ci, 1988 0000 Unit in tbde 1, Power Operation Wolf Creek Generating Station Monthly Operating Repart March 1988 Page 5 of 5

,u WCLF CREEK NUCLEAR OPERATING CORPORATION Bart D. Wdhers Pr.ed.nl end c w en.cuw.ome.,

April 13, 1988 VM 88-0092 U. 8. Nuclear Regulatory Comnission ATTN: Document Control Desk Vashington, D. C.

20555

Subject:

Docket No. 50-482: March, 1988, Monthly Operating Report Gentlemen Attached is the March, 1988, Monthly Operating Report for Wolf Creek Generating Station.

This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

Very truly yours, Bart D. Withers Prerident and l

Chief Executive Officer BDV/jad Attachment oo B. L. Bartlett (Nt'C), w/a R. D. Msrtin (NRC), w/a P. V. O'Connor (NRC), 2 w/a PO. Boa 411/ Burhngton, KS 66839 i Phone: (316) 364 8831

,3

.