Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154C640 + (06:24:25, 11 December 2024)
- ML20154C634 + (06:24:29, 11 December 2024)
- ML20154C632 + (06:24:30, 11 December 2024)
- 05000373/LER-1986-004-02, :on 860205,control Room HVAC Sys Ammonia Detector Tripped Spuriously.Caused by Broken Chemcassette Tape in Tape Carriage Mechanism.Chemcassette Tray Replaced & Vaporizer Concentrate Sys Declared Operable + (06:24:34, 11 December 2024)
- ML20154C628 + (06:24:35, 11 December 2024)
- PNO-I-88-050, on 880511,FBI Made Addl Arrests of Three Licensee Employees Re Involvement in Illegal Drug Activities Prior to 1987.Followup of PNO-I-87-108 + (06:24:35, 11 December 2024)
- B17446, Informs of Change in Amount of Useable Diesel Fuel Oil Required to Be Stored in Tank T-47A.Oil Has Been Changed from Approx 17,700 Gallons to 17,195 Gallons,Per NRC Issued License Amend 212 + (06:24:36, 11 December 2024)
- ML20154C618 + (06:24:37, 11 December 2024)
- ML20154C622 + (06:24:37, 11 December 2024)
- ML20154C617 + (06:24:38, 11 December 2024)
- ML20154C613 + (06:24:40, 11 December 2024)
- ML20154C612 + (06:24:41, 11 December 2024)
- ML20154C611 + (06:24:41, 11 December 2024)
- ML20154C609 + (06:24:42, 11 December 2024)
- 05000348/LER-1988-011, :on 880413 & 0505,Tech Spec 3.7.12 Violated. Caused by Containment Personnel & Equipment Hatches Being Open for More than 7-day Limit.Personnel & Hatches Will Be Closed Prior to Entry Into Hot Shutdown + (06:24:47, 11 December 2024)
- JAFP-88-0832, Monthly Operating Rept for Aug 1988 for Fitzpatrick Nuclear Power Plant + (06:24:48, 11 December 2024)
- ML20154C607 + (06:24:48, 11 December 2024)
- ML20154C604 + (06:24:49, 11 December 2024)
- ML20154C605 + (06:24:49, 11 December 2024)
- 3F0998-15, Clarifies Current Licensing Basis for Time Necessary to Start Control Complex Chillers at Crystal River Unit 3 (CR-3) After loss-of-offsite Power + (06:24:50, 11 December 2024)
- ML20154C601 + (06:24:51, 11 December 2024)
- 05000348/LER-1988-010, :on 880411,determined That Individually Neither of Control Room Pressurization Units Able to Maintain Required Pressure of at Least 0.125 Inches Water Gauge. Caused by Open Penetrations + (06:24:52, 11 December 2024)
- ML20154C597 + (06:24:53, 11 December 2024)
- ML20154C594 + (06:24:54, 11 December 2024)
- ML20154C595 + (06:24:54, 11 December 2024)
- ML20154C593 + (06:24:55, 11 December 2024)
- ST-HL-AE-2653, Forwards Evaluation of Microbiologically Influenced Corrosion in Jacket Water of Cooling Sys of Unit 2 Standby Diesel Generators & Failure Analysis of Diesel Cylinder Liner Expansion Bellows. Unit 1 Shows No Corrosion + (06:24:56, 11 December 2024)
- ML20154C591 + (06:24:56, 11 December 2024)
- PNO-III-88-078, on 880904,fire Occurred in Two Charcoal Adsorber Tanks in Offgas Sys.Cause Under Investigation. Nitrogen Purge of Tanks Performed & Temps Reduced + (06:24:59, 11 December 2024)
- ML20154C585 + (06:25:00, 11 December 2024)
- ML20154C584 + (06:25:01, 11 December 2024)
- ML20154C583 + (06:25:01, 11 December 2024)
- ML20154C580 + (06:25:02, 11 December 2024)
- ML20154C581 + (06:25:02, 11 December 2024)
- ML20154C579 + (06:25:04, 11 December 2024)
- IR 05000373/1988016 + (06:25:31, 11 December 2024)
- ML20154C577 + (06:25:31, 11 December 2024)
- NOC-AE-000294, Responds to Staff Questions on Re RAI on GL 97-04, Assurance of Sufficient Net Positive Suction Head (NPSH) for ECC & Containment Heat Removal Pumps + (06:25:32, 11 December 2024)
- ML20154C569 + (06:25:33, 11 December 2024)
- OI 4-1998-009, Refers to Investigation (OI 4-1998-009) Re Activities at Cooper Nuclear Station.Investigation Initiated in Response to Rept That Engineer Falsified Educational History on Personal History Questionnaire.Accurate Info Was Provided + (06:25:33, 11 December 2024)
- ML20154C567 + (06:25:34, 11 December 2024)
- ML20154C565 + (06:25:34, 11 December 2024)
- ML20154C564 + (06:25:35, 11 December 2024)
- SNRC-1458, Suppl 10 to Startup Rept for Period 880201-0501,Shoreham Nuclear Power Station + (06:25:38, 11 December 2024)
- IR 05000483/1998012 + (06:25:40, 11 December 2024)
- ML20154C554 + (06:25:41, 11 December 2024)
- ML20154C557 + (06:25:41, 11 December 2024)
- 2CAN098804, Discusses Resolution of Generic Issue 124 Re Auxiliary Feedwater Sys Reliability Response to Staff Assessment Rept. Evaluation of Condensate Pumps as Method of Accomplishing Safety Function of Emergency Feedwater Sys Encl + (06:25:42, 11 December 2024)
- ML20154C549 + (06:25:43, 11 December 2024)
- ML20154C546 + (06:25:44, 11 December 2024)
- ML20154C545 + (06:25:45, 11 December 2024)
- ML20154C542 + (06:25:46, 11 December 2024)