Advises That Rev to Fuel Canister Storage Racks Technical Evaluation Rept Not Required,Per Util Annual Review
ML20154C581
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/10/1988
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
4410-88-L-0072, 4410-88-L-72, NUDOCS 8805180231
Download: ML20154C581 (1)


Text

e o

e GPU Nuclear Corporstl ;

a Nuclear

e = a=

o Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Olal Number:

(717) 948-8461 May 10, 1988 4410-88-L-0072/0092P US Nuclear Regulatory Commission Attn: Document Control Desk Wasnington, DC 20555

Dear Sirs:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Annual Update of the Fuel Canister Storage Racks Technical Evaluation Report As requested by NRC Letter dated February 4,1982, GPU Nuclear has performed the annual review of the Fuel Canister Storage Racks Technical Evaluation Report (TER) and has determined that a revision is not reQJired at this time.

Sincerely,

/

v w

F. R. Standerfe Director, TMI-2 i

RDW/emt cc: Senior Resident Inspector, TMI - R. J. Conte Regional Administrator, Region 1 - W. T. Russell Director, Plant Directorate IV - J. F. Stolz Systems Engineer, TMI Site - L. H. Thonus j