Discusses 860125 Meeting W/Util Re Util Plans to Modify Vogtle Readiness Review Program.Util Reviewed Overall Program Objectives & Intends to Reduce Scope of Certain Modules & Apps in Program
ML20154C580
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/18/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
References
NUDOCS 8603050257
Download: ML20154C580 (3)


Text

. . C)[K M NL&$

FEB 181986 Georgia Power Company

. ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

DOCUMENTATION OF MEETING HELD WITH A GEORGIA POWER COMPANY (GPC) '

0FFICIAL - V0GTLE DOCKET N0. 50-424 This letter is to document a meeting between Mr. William Ramsey, of the GPC Vogtle Readiness Review Staff, and Mr. Marvin Sinkule, of my staff on January 25, 1986, in the Region II Office in Atlanta. The meeting was held at GPC's request.

The purpose of the meeting was for Mr. Ramsey to conduct a briefing of Georgia Power Company's plan to modify the Vogtle Readiness Review Program. Mr. Ramsey stated that GPC has reviewed overall program objectives and, as a result, intends to reduce the scope of certain Modules and Appendices in the Readiness Review Program. The decision to do this is based on a review to verify that: the deleted readiness review was included in other Readiness Review Modules /or Appendices; or the objectives of readiness review will be satisfied by other ,

program initiatives. The Modules / Appendices affected are: Module 15 Emergency '

Preparedness; Module 18B, Fire Protection; Module 18C, Diesel Generators; Module 18D, Radwaste; Appendix A, Organization; Appendix B, Design Control; Appendix H, Nonconformances; and Appendix K, Construction Completion.

Georgia Power Company is planning to submit a written change to the Vogtle Readiness Review Program when internal reviews are completed and approvals are obtained.

Should you have any questions concerning these matters, we will be pleased to discuss them.

Sincerely, Original Signed by Roger D. Walker Roger D. Walker, Director Divisinn of Reactor Projects l

cc: (See page 2) j NO A

i0 ,

sp d

i Georgia Power Company 2

. cc: vff. E. Conway, Senior Vice President &

Project Director g.O. Foster,VicePresident, Project upport

. D. Rice, Vice President, Project Engineering

A. H. Pinson, Vice President, Project j Construction

): T. Beckham, Vice President &

General Manager - Operations l Ji A. Thomas, Vice President, l Licensing C< W. Hayes, Vogtle Quality i

Assurance Manager J. C. Ramsey, Manager -

Readiness Review

56. B. Bockhold, General Manager, Nuclear Operations r A T. Gucwa, Chief Nuclear Engineer J4/ H. Googe, Project Construction Manager i g. D. Groover, Quality l Assurance Site Manager -

Construction

! uK A. Bailey, Project Licensing Manager 1

(Af. F. Trowbridge, Esq. , Shaw, Pittnan, Potts and Trowbridge j M W. Churchill, Esq., Shaw, i Pittman, Potts and Trowbridge E L. Blake, Jr. , Esq. , Shaw, j Dittman, Potts and Trowbridge J. E. Joiner, Troutman, Sanders, '

Lockerman and Ashmore tJ: G. Ledbetter, Commissioner, Department of Human Resources J.H. Badger,OfficeofPlanning

! and Budget

! D'.' Kirkland, III, Counsel, I Office of the Consumer's Utility .

Council

'D' C. Teper, Georgians Against

! Nuclear Energy i lTT Johnson, Executive Director,

! Educational Campaign for a

! Prosperous Georgia i ,

! cc: (Cont'd. on page 3) l l

o ,

Georgia Power Company 3 FEB 181986 cc: (Cont'd.)

tM. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board Panel t,Dr. O. H. Paris, Administrative Judge Atomi: Safety and Licensing Board Panel J. A. Linenberger, Jr. , Administrative Judge, Atomic Safety and Licensing Board Panel P. Garde, Citizens Clinic

$< Director,GovernmentAccountability Project bec: J. N. Grace, RII R. D. Walker, RII J. P. Stohr, RII A. F. Gibson, RI!

tB(Grimes,IE vf. Novak, NRR LV. M. Hill, IE

-J. R. Thompson, NRR W' Brach, ED0 M. V. Sinkule, RII tRRC Resident Inspector Document Control Desk State of Georgia RII y MSinkule:jd ok RI 6

VBrownlee Rb3 AGib on 2//2/86 2/l2/86 2//2/86

- - _ _ _ _ _ _ _ _ _ _ _ _ _ _