Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154J001 + (05:34:01, 11 December 2024)
- A07194, Responds to NRC Re Violations Noted in Insp Rept 50-423/88-05.Corrective Actions:Valve 3FWA*V2 Locked Open, Listed Valve Lineup Performed on Trains a & B & Description of Event & Caution to Verify Valves Distributed to Shifts + (05:34:08, 11 December 2024)
- RBG-23245, Forwards Rept Containing Brief Description of Changes to Initial Test Program & Summary of Safety Evaluation for Each Change + (05:34:08, 11 December 2024)
- ML20154H994 + (05:34:14, 11 December 2024)
- ML20154H993 + (05:34:15, 11 December 2024)
- ML20154H989 + (05:34:22, 11 December 2024)
- ML20154H987 + (05:34:22, 11 December 2024)
- B12907, Forwards Updated Schedule for Correction of Human Engineering Discrepancies (Heds).First Phase Enchancements & Corrections of Program to Correct Heds Completed.All Revs to Operations Procedures Will Be Completed by End of 1988 + (05:34:23, 11 December 2024)
- ML20154H986 + (05:34:23, 11 December 2024)
- ML20154H984 + (05:34:24, 11 December 2024)
- IR 05000424/1988030 + (05:34:25, 11 December 2024)
- ML20154H980 + (05:34:26, 11 December 2024)
- ML20154H977 + (05:34:27, 11 December 2024)
- ML20154H979 + (05:34:27, 11 December 2024)
- ML20154H976 + (05:34:28, 11 December 2024)
- ML20154H973 + (05:34:28, 11 December 2024)
- ML20154H971 + (05:34:29, 11 December 2024)
- ML20154H970 + (05:34:30, 11 December 2024)
- ML20154H969 + (05:34:30, 11 December 2024)
- IR 05000425/1988032 + (05:34:31, 11 December 2024)
- ML20154H966 + (05:34:31, 11 December 2024)
- ML20154H965 + (05:34:32, 11 December 2024)
- ML20154H963 + (05:34:33, 11 December 2024)
- BVY-98-150, Provides Status of Initiatives in Area & Provides Update on Current Schedules,Per 10CFR50.54(f).Util Will Continue to Update NRC on Status of Efforts as Necessary + (05:34:34, 11 December 2024)
- ML20154H962 + (05:34:34, 11 December 2024)
- ML20154H959 + (05:34:35, 11 December 2024)
- ML20154H956 + (05:34:36, 11 December 2024)
- ML20154H957 + (05:34:36, 11 December 2024)
- B11949, Advises That Fire Door 1 Between Control Room & Turbine Bldg Will Be Replaced.Request for Exemption from 10CFR50, App R,Dtd 850916,still Needed.Proposed Mods Re Loop Isolation Valves Can Be Deleted.W/One Oversize Drawing + (05:34:37, 11 December 2024)
- ML20154H951 + (05:34:38, 11 December 2024)
- ML20154H949 + (05:34:38, 11 December 2024)
- ML20154H946 + (05:34:39, 11 December 2024)
- ML20154H945 + (05:34:39, 11 December 2024)
- ML20154H939 + (05:34:40, 11 December 2024)
- ML20154H935 + (05:34:41, 11 December 2024)
- ML20154H934 + (05:34:44, 11 December 2024)
- 2CAN028606, Forwards WP860134, Steam Generator Tubing Inservice Insp Rept for 2R4 Refueling Outage + (05:34:45, 11 December 2024)
- ML20154H933 + (05:34:45, 11 December 2024)
- ML20154H931 + (05:34:46, 11 December 2024)
- ML20154H928 + (05:34:52, 11 December 2024)
- ML20154H924 + (05:34:53, 11 December 2024)
- ML20154H927 + (05:34:53, 11 December 2024)
- ML20154H921 + (05:34:54, 11 December 2024)
- ML20154H918 + (05:34:55, 11 December 2024)
- ML20154H912 + (05:34:55, 11 December 2024)
- BECO-86-022, Application for Amend to License DPR-35,consisting of Proposed Change 86-04,revising Tech Specs to Extend Duration of License for 40 Yrs from Date of Issuance of Ol. Fee Paid + (05:34:56, 11 December 2024)
- ML20154H909 + (05:34:57, 11 December 2024)
- 1CAN098801, Forwards Followup to 870827 Reactor Bldg Temp Justification for Operation Submittal,Per NRC Telcon Request for Addl Info on Error Calculations Used to Access Effects of Elevated Temps on Protection Sys Setpoints + (05:34:58, 11 December 2024)
- ML20154H902 + (05:34:59, 11 December 2024)
- ML20154H903 + (05:34:59, 11 December 2024)
- ML20154H898 + (05:35:00, 11 December 2024)