_ - _ - - _ - _ _ _ - - - _ - _ _ - _. -_
I e
p Duxn PowEn G(DWANY l
e.o. i.ox mmm CliAHl.otTi!. N.C. WilW 82 II Al. II. TI'CKl:H rre re ene>=m no ipin-.s u m....
l l
l l
l March 3, 1986 i
l Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation i
U. S. Nuclear Regulatory Comission Washington, D. C.
20555 Attention:
Mr. B. J. Youngblood, Project Director t
PWR Project Directorate No. 4 Ret Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Dear Mr. Dentent i
Enclosed are six copies of Revision 12 (Unit 1) and Revision 2 (Unit 2) to the Catawba Nuclear Station Pump and Valve Inservice Testing Program.
These should be incorporated into the existing Pump and Valve Inservice Testing Manual removing any earlier revision pages of the program.
Very truly yours, I
i
~
s e
.Ja k Wo l
Hal B. Tucker RWorsib
't Enclosures L
cc
_(w/o enclosures)
Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission l
Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 i
I NRC Resident Inspector Npf Catawba Nuclear Station 8
i )
l 0603100415 060303 PDH ADOCK 05000413 P
O INSERVICE TESTING PROGRAM FOR PUMPS AND VALVES DUKE POWER COMPANY CATAWBA NUCLEAR STATION UNIT 1 Docket No. 50-413 Revision 12 O
i i
f i
l
)
l O
r l
es INTRODUCTION v
l The Inservice Testing Program for Pumps and Valves provides a comprehensive l
testing plan as required by 10CFR50.55 a(g).
This program is based on The ASME Boiler and Pressure Vessel Code,Section XI, Subsections !WP and IWV, I
1983 Edition including Addenda through the Summer 1983 Addenda. This test Rev. 12 program will be applicable for the initial 120 month interval beginning upon issuance of the operating license, after which the program will be l
reviewed and updated to that edition and addenda of the Code in effect rot more than twelve months prior to the beginning of the next 120 month interval.
i Pump and valve testing requirements are presented in Parts ! and !! of this i
submittal.
Each part provides summary, program format, data sheet and relief request sections.
I l
r l
l l
l I
l N
i Rev. 12
i INSERVICE TESTING PROGRAM TOR i
i PUMPS AND VALVES a
(
i DUKE POWER COMPANY CATAWBA NUCLEAR STATION UNIT 2 l
i Docket No. 50-414 l
P REVISION 2 I
)
I i
O I
0 3
1 s
i O
+
INTRODUCTION
%/
The Inservice Testing Program for Pumps and Valves provides a comprehensive testing plan as required by 10CFR50.55 a(g).
This program is based on The ASME Boiler and Pressure Vessel Code,Section XI, Subsections IWP and IWV, 1983 Edition including Addenda through the Summer 1983 Addenda. This test Rev. 2 program will be applicable for the initial 120 month interval beginning upon issuance of the operating license, af ter which the program will be reviewed and updated to that edition and addenda of the Code in effect not more than twelve months prior to the beginning of the next 120 month interval.
Pump and valve testing requirements are presented in Parts I and II of this submittal.
Each part provides summary, program format, data sheet and relief request sections.
o D
j Rev. 2