Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000373/LER-1988-005-05, :on 880422,diesel Generator 1A Failed to Meet Load Acceptance Criteria & Declared Inoperable.Caused by Difference in Tolerance Between Fuel Racks & Newly Installed Fuel Injectors & Insufficient Speed Setting + (05:07:46, 11 December 2024)
- ML20154L504 + (05:07:47, 11 December 2024)
- ML20154L506 + (05:07:47, 11 December 2024)
- ML20154L502 + (05:07:48, 11 December 2024)
- ML20154L503 + (05:07:48, 11 December 2024)
- ML20154L501 + (05:07:49, 11 December 2024)
- ML20154L500 + (05:07:49, 11 December 2024)
- HBL-86-003, Rept on Radioactive Effluent Releases & Waste Disposal, Jul-Dec 1985 + (05:07:50, 11 December 2024)
- ML20154L496 + (05:07:51, 11 December 2024)
- ML20154L495 + (05:07:55, 11 December 2024)
- ML20154L494 + (05:07:55, 11 December 2024)
- ML20154L493 + (05:07:56, 11 December 2024)
- IR 05000302/1988020 + (05:08:00, 11 December 2024)
- 05000354/LER-1988-010, :on 880414,two HPCI Oil Control Valves Discovered Not to Be in Required Position for Operability. Caused by Unauthorized Repositioning of Valves.Valves Restored to Required Position & Signs Posted + (05:08:02, 11 December 2024)
- JAFP-88-0869, Responds to NRC Re Violations Noted in Insp Rept 50-333/88-12.Corrective Actions:Control Room Operator Responsibility to Ensure Surveillance Completed Emphasized to All Operators + (05:08:03, 11 December 2024)
- ML20154L490 + (05:08:03, 11 December 2024)
- ML20154L486 + (05:08:04, 11 December 2024)
- PY-CEI-NRR-0912, Forwards Responses to Questions Listed in Technical Evaluation Rept for Evaluation of Rev 2 to Offsite Dose Calculation Manual + (05:08:05, 11 December 2024)
- ML20154L485 + (05:08:05, 11 December 2024)
- ML20154L483 + (05:08:06, 11 December 2024)
- ML20154L482 + (05:08:07, 11 December 2024)
- 05000341/LER-1988-008, :on 880229,determination Made During Local Leak Rate Testing That Combined Leakage Limits Exceeded.Caused by Normal Degradation of Valve Components &/Or Contaminants on Valve Seats.Valves Cleaned,Reworked & Retested + (05:08:09, 11 December 2024)
- ML20154L478 + (05:08:10, 11 December 2024)
- ML20154L479 + (05:08:10, 11 December 2024)
- ML20154L477 + (05:08:11, 11 December 2024)
- ML20154L476 + (05:08:11, 11 December 2024)
- ML20154L473 + (05:08:13, 11 December 2024)
- ML20154L474 + (05:08:13, 11 December 2024)
- 3F0588-10, Submits Addl Info Re Control Room Habitability Conformance to NUREG 0737,Item III.D.3.4,per NRC 880329 Request.Util Performs Quarterly Calibr on Local SO2 Tank Detectors in Response to 880419 Telcon + (05:08:17, 11 December 2024)
- ML20154L468 + (05:08:18, 11 December 2024)
- IR 05000456/1988020 + (05:08:34, 11 December 2024)
- IR 05000461/1986008 + (05:08:34, 11 December 2024)
- ML20154L464 + (05:08:35, 11 December 2024)
- ML20154L463 + (05:08:36, 11 December 2024)
- ML20154L461 + (05:08:36, 11 December 2024)
- ML20154L460 + (05:08:37, 11 December 2024)
- ML20154L459 + (05:08:37, 11 December 2024)
- ML20154L458 + (05:08:38, 11 December 2024)
- ML20154L457 + (05:08:38, 11 December 2024)
- ML20154L456 + (05:08:39, 11 December 2024)
- ML20154L454 + (05:08:40, 11 December 2024)
- ML20154L453 + (05:08:40, 11 December 2024)
- BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With + (05:08:41, 11 December 2024)
- ML20154L452 + (05:08:41, 11 December 2024)
- IR 05000255/1988013 + (05:08:42, 11 December 2024)
- ML20154L449 + (05:08:42, 11 December 2024)
- ML20154L448 + (05:08:43, 11 December 2024)
- ML20154L444 + (05:08:44, 11 December 2024)
- ML20154L445 + (05:08:44, 11 December 2024)
- ML20154L443 + (05:08:45, 11 December 2024)
- RBG-44646, Provides Voluntary Notification of RBS Plans to Provide Office Space on Interim Basis to non-RBS Personnel + (05:08:46, 11 December 2024)
- ML20154L439 + (05:08:46, 11 December 2024)