Text
n
,~
,s '
.Georg.a Tbwer Compa7 333 P;edmont AveNe At'a,ta Georgia 30308 Telephone 404 526 f626 bf 54 5 Atianta. Georg<a 33302 R. P. Mc Doraid W SCW'h6fD CiEffC Sistem E recWve Vice President Nuclear Operat:ons SL-4696 0940m X7GJ17-V820 May 19, 1988 U. S. Nuclear Aegulatory Commission ATTN:
Document Control Desk
-)
Hashington, D.C.
20555 PLANT V0GTLE - UNITS 1, 2 NRC DOCKETS 50-424, 50-425 OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 DUAL UNIT LICENSES Gentlemen:
Georgia Power Company (GPC) hereby submits the information requested t'y the NRC at our December 9, 1987, meeting concerning Unit 2 operator licensing requirements.
As discussed at the meeting, GPC will apply in the fall of 1988 for dual unit licenses for its operators licensed on Plant Vogtle Unit 1. contains an overview of the formal tiaining program to support the application for dual unit licenses.
Enciosure 2 contains the differences between VEGP units 1 and 2 which have been approved for inclusion in a differences training program for licensed operators.
Due to the limited number of differences and the minimal operational effect of the differences, Georgia Power Company will request a waiver of both the written and operational (simulator and plant walkthrough) examinations for those licensed operators who complete the training program.
If ycu have any questions regarding this letter or ts enclosures please contact this office at any time.
Sincere y I'
ha I
R. P. Mcdonald PAH/1m 0@
\\ \\
8805310291 880519 PDR ADOCK 05000424 V
L
((
Geo)gia Power A U. S. Nuclear Regulatory Commission May 19, 1988 Page Two
Enclosures:
1.
Description of VEGP Training Program for Conversion of Unit 1 Operator Licenses to Dual Unit Licenses 2.
Facility Design and Systems Relevant tof Co'ntrol Room Personnel and Operational Characteristics a
c: Egoraia Power Comoany I
Hr. P. D. Rice
>/
i Mr. G. Bockhold, Jr.
GO-NORMS U. S. Nuclear Regulat'ry Commission o
Dr. J. N. Grace, Regional Administrator q.
Mr. J. B. Hopkins, Lic:nsing Project Manager, NRR (2 copies)
Mr. J. F. Rogge,. Senior Resident Inspector-0perations, Vogtle t
/
4 2
i 3
/
l 0940m
s ENCLOSURE 1 PLANT V0GTLE - UNITS 1, 2 NRC DOCKETS 50-424, 50-425 OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 DESCRIPTION OF VEGP TRAINING PROGRAM FOR CONVERSION 0,F UNIT 1 OPERATOR LICENSES TO 03AL UNIT LICENSES In accordance with dual unit licensing requirements of 10 CFR 55 and the policy and guidance of NUREG 1021, VEGP will develop and present a formal training and evaluation program for candidates seeking conversion of an Operator License for Vogtle Unit 1 to a license for Vogtle Units 1 and 2.
The program will include differences training per NUREG 1021 section ES 106 covering:
1.
Facility Design and Systems Relevant to Control Room Personnel 2.
Technical Specifications 3.
Procedures, Primarily Abnormal and Emergency Operating Procedures 4.
Control Room Design and Instrument Location 5.
Operational Characteristics.
Each candidate will participate in a program of approximately 65 hours7.523148e-4 days <br />0.0181 hours <br />1.074735e-4 weeks <br />2.47325e-5 months <br />, which will include classroom and in-plant instruction distributed within the:
1.
VEGP Licensed Operator Requalification Program 12 Hours of classroom instruction covering appropriate portions of the five NUREG 1021 topics and the effects of common systems failure with the appropriate operator response.
2.
Unit 2 On-shift Assignment Program a.
40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on Unit 2 control room training emphasizing the location and operation of Unit 2 controls, instruments, and
- systems, b.
Completio". ' a plant walkthrough checklist covering Unit 2 and Common eqt.i. Ment locations.
l l
0940m El-1 05/19/88 l
SL-4696 1
I
Georgia Power d ENCLOSURE 1 (Continued)
DESCRIPTION OF VEGP TRAINING PROGRAM FOR CONVERSION OF UNIT 1 OPERATOR LICENSES TO DUAL UNIT LICENSES The training will include a written 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> differences examination and a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in-plant walk-through examination covering appropriate portions of the five required topics for each candidate.
Approximately two-thirds of VEGP's 69 licensed operators will have completed this program by September 9,1988 and all will have taken at least one annual requalification exa:nination during the 1986-1988 requalification program cycle.
Members of this group who have passed the differences training program and have passed the applicable VEGP annual requalification examination will submit license applications, with the appropriate waiver, to convert their Unit 1 licenses to Unit 1 - Unit 2 licenses.
0940m El-2 05/19/88 SL-4696
Georgia Power d ENCLOSURE 2 PLANT V0GTLE - UNITS 1, 1 i
NRC DOCKETS 50-424, 50-425 OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 FACILITY DESIGN AND SYSTEMS RELEVANT TO CONTROL ROOM PERSONNEL AND OPERATIONAL CHARACTERISTICS 1.
Boron Injection Tar.k (BIT) and the BIT Recirc System
Reference:
1X4DB119 2X4DBil9 Description of Change:
The BIT and BIT recirc system were not i
installed on Unit 2 while Unit I has the components disabled in place.
This is not an operating difference but physical difference.
The unit 2 high head injection valves will use the same nomenclature (BIT Outlet Valves) as unit 1.
2.
Haste Evaporator
Reference:
DCN-6164 Description of Change:
The Unit 2 Haste Evaporator Installation will not be completed.
3.
Haste Monitor Tank Capacity
Reference:
DCN-6164 Description of Change:
Unit 2 will have 2 additional 20,000 gallon tanks designated as common tanks.
4.
NSCH Fan Vibration Reset Switches
Reference:
DCR 87-VIE 0261 2X3BD-K03A, B, C, D, E, F, G, and H 2X3D-BA-003F 2X3D-AA-F39A Description of Change:
Unit 2 will have a vibration trip time delay and reset switches for the NSCH Tower Fans in the control room.
Unit 1 may have them installed later.
5.
NSCH Aux Containment Cooler Isolation Valves
Reference:
2X4DB135-1, 135-2 2X3D-BD-K04L and M Description of Change:
Unit 2 valves are interlocked so that the outlet valves must be opend first.
When opening the outlet valves they stroke 3 seconds, r for 60 seconds, and then finish stroking open.
This allows the N
..,r to backfill.
0940m E2-1 05/19/88 SL-4696
Georgia Power d ENCLOSURE 2 (Continued)
FACILITY DESIGN AND SYSTEMS RELEVANT TO CONTROL ROOM EERSONNEL AND OPERATIONAL CHARACTERISTICS 6.
NSCH High Point Vacuum Breakers
Reference:
1X4DB134 and IX4DB135 2X4DB134 and 2X4DB135 Description of Change:
Unit 2 has added Vacuum breakers to thE High points in the NSCH Systems.
Unit I has no plans to incorporate the change.
7.
Main Feed Pump Seal Injection
Reference:
2X4DB168-2 Description of Change:
Unit 2 MFP seal injection filters have filter D/P indication that unit I doesn't.
8.
Diesel Generator System
Reference:
1X4DB170-1 and 2 2X4DB170-1 and 2 2X3D-BH-G02B Description of Change:
The Unit 2 DG fuel oil transfer pumpa have a local / remote transfer switch to transfer control in case of a control room fire.
The switch is located on the front of the breaker cubicle for the pump.
This may have an impact on A0P 18038.
Reference:
DCR-87 VIE 0206 2X5DT0029 and 30 Description of Change:
THe fuel oil storage tank low level alarm setpoint was raised from 54 +/- 3.6 inches to 56 +/- 3.6 inches to allow more time for operator action.
Unit 1, which is presently 45"
+/- 3.6", will be changed in the future.
Reference:
2X4DB170-1 and 2 N0E-02268 Description of Change:
Unit 2 has a drain line installed on the day tank so that the day tank can be drained back to the fuel oil storage tank. The line has a lock closed isolation valve.
Reference:
ODR T-2-87-0034 and MHO 2-88-01663 2X4AK01-361 and 369, MFCRB-18026 Description of Change:
Unit 2 has added orifices in the air logic system to allow the low lube oil pressure trip to be active during an emergency start coincident with a normal shutdown.
Unit I has not made this change.
0940m E2-2 05/19/88 SL-4696
Georgia Power d l
l ENCLOSURE 2 (Continued)
FACILITY DESIGN AND SYSTEMS RELEVANT TO CONTROL ROOM l
PERSONNEL AND OPERATIONAL CHARACTERISTICS
Reference:
ODR T-2-87-00447 and MHO 2-88-00060 Bill of Material 2X3AE01-107 Item #103 Description of Change: On Unit 2 the sync. mode select switches turn in the opposite direction.
They have been revised to make-up in the manual and auto positions as shown on elementaries and instruction manual bill of materials.
No design change documents have been issued to make this change in unit 1.
Reference:
DR T-1-86-2118 Deferred Modification #90-0001 l
Description of Change: The Unit 2 sequencers have a reset pushbutton i
to allow resetting of the sequencer if the sequencer fails to complete the required loading sequence.
Unit i requires a circuit card to be pulled to complete this task.
This Change may have an impact on the E0Ps.
9.
Heater Drain Pumps
Reference:
2X4DB163-3 and 163-4 2X4DB159 Description of Change:
Valves 2-1310-X4-521 and 522 were added on l
unit 2 to allow warm up of the heater drain pumps prior to placing them in service to reduce thermal shock.
- 10. Auxiliary Building HVAC
Reference:
YFCRB-6471, DCR-87V1E0177 2X3D-BG-D02C, F, L. P and S 2X5DB026-1 2X5DN050-1 2X4DB208-1 Description of Change:
On a CVI signal the Unit 2 Auxiliary Building HVAC units will trip to comply with FSAR 9.4.3.2.2.3
- 11. CRDM Low Flow Alarm
Reference:
DCR-87V1E0297 2X3D-BG-B02A Description of Change:
On unit 2 with less than 2 CRDM fans running a low flow alarm will annunciate on ALB52E08.
Unit I has deferred this change.
0940m E2-3 05/19/88 J
SL-4696
)
i 1
~
' Georgia Power d ENCLOSURE 2 (Continued)
FACILITY DESIGN AND SYSTEMS RELEVANT TO CONTROL R00H PERSONNEL AND OPERATIONAL CHARACTERISTICS
- 12. Control Building Electrical Penetration Filter Units
Reference:
1X40B209 2X4DB209 Description of Change:
The unit 2 electrical penetration filter units have been deleted.
The unit 1 filter units will remain in service.
- 13. RHR Mini-flow Orifices
Reference:
Letter, Hestinghouse to Bechtel dated 12/10/85 FSD-SS-GAE-4028 GP 10232, SO GAE-280 Description of Change:
Unit 2 RHR mini-flow orifices are sized smaller than the unit 1 orifices.
- 14. Annunciator Power Supplies
Reference:
N0E-02268 Description of Change:
Unit 2 uses a different type of annunciator inverter which incorporates an automatic transfer between the AC/DC power supplies.
Both Unit I and Unit 2 power supplies will auto swap from the primary AC to the backup DC on a loss of primary power.
Unit 2 power supplies will auto swap from the DC backup to primary AC when the primary power is available provided the source selector switch is in the AC position. On Unit 1, it is a manual operation to transfer from DC back to AC.
- 15. Condensate System
Reference:
MFCRB-4046 2X4DB185-1 2X4DB168-1 Description of Change:
Fill and vent of the unit 2 condensate system will be by use of the condensate demin backwash pump using the CSTs as a water source.
The water will enter the condensate system through a 12" flush connection on the condensate pump discharge header.
Unit one will use the condensate pumps and the condenser as a water source.
- 16. Heat Tracing
Reference:
P& ids IX4DB124, 133-1, 133-2, 146-2, 161-1, 164-2, and 184 l
2X4DB124, 133-1, 133-2, 146-2, 161-1, 164-2, and 184 AX4DB190-2 Description of Change:
Some outside areas of unit 2 rely on room (area) heating instead of heat tracing for freeze protection. Unit I has heat tracing for freeze protection in these areas.
These areas include the RHST, RMHST, CSTs, NSCH pump and valve rooms, and underground tunnels.
0940m E2-4 05/19/88 SL-4696
Georgia Power d ENCLOSURE 2 (Continued)
FACILITY DESIGN AND SYSTEMS RELEVANT TO CONTROL ROOM PERSONNEL AND OPERATIONAL CHARACTERISTICS
- 17. Steam Dump Control in the Steam Pressure Mode
Reference:
EA 2-88-12 YFCRB-7026 Description of Change:
Unit 2 has changed the pressure control valves (PV-507A,.B, C) such that they have equal percentage cams (Flow Demand) instead of linear percentage cams (Valve Stem Demand) as unit 1
does.
This change will provide better control characteristics at low steam (heat) loads.
Technical Soecifications Anticipated Differences and/or Changes to be made to the Unit 1 Tech Specs when Common Tech Specs are issued.
1.
RTNDT Limits and Copper Content
References:
TS 3.4.9 page 3/4 4-30 Figure 3.4-2 page 3/4 4-31
==
Description:==
Unit 1 Values Unit 2 Values Actual Copper Content
.06 HT.%
.05 HT.%
Actual Initial RTNDT-30 F 40 F TS will be revised to reflect unit 2.
2.
Spray Additive Flowrates
Reference:
TS 4.6.2.2d page 3/4 6-14
==
Description:==
Unit 1 Values Unit 2 Values Train A Eductor Flowrate 120 +/- 30 GPM Not Determined Train B Eductor Flowrate 130 +/- 30 GPM Not Determined 3.
Piping Penetration Area Filtration System
Reference:
TS 3.7.7 and 4.7.7 page 3/4 7-17
==
Description:==
Unit 1 Value Unit 2 Value Flow Rate Through HEPA Filter 15500 CFM Not Determined 4.
Area Temperature Monitoring
Reference:
TS 3.7.10 page 3/4 7-27 i
Table 3.7-3 page 3/4 7-28
==
Description:==
There will be new rooms associated with unit 2 added to table 3.7-3.
0940m E2-5 05/19/88
)
SL-4696
i Georgia Power d.
ENCLOSURE 2 (Continued)
FACILITY DESIGN AND SYSTEMS RELEVANT TO CONTROL ROOM PERSONNEL AND OPERATIONAL CHARACTERISTICS 5.
Spent Fuel Storage Pools Capacity
Reference:
TS 5.6.3 page 5-5
==
Description:==
East Pool (Unit 1) 936 fuel assemblies West Pool (Unit 2) 2098 fuel assemblies Both numbers are proposed.
6.
High Energy Line Break (HELB) Protection
Reference:
T. S. 3.3.3.11
==
Description:==
There have been new HELB instruments added to table 3.3-11 for unit 2.
7.
Positive Moderator Temperature Coefficient (PMTC)
Reference:
T. S. 3.1.1.3
==
Description:==
Unit l's PHTC T. S. will change concurrent with the unit i refueling outage.
In association, and the boron dilution flow rates may change.
Procedures. Primarily Abnormal and Emergency Doeratina P_tacadur11 Limited operational differences should exist in the E0Ps and A0Ps.
These differences may include:
1.
A reference in the remote shutdown A0P regarding the remote operation of the unit 2 DG fuel oil transfer pumps.
2.
Reference in the E0Ps to the sequencer reset pushbutton.
Control Haqnj Desian and ID.strument Locations Control Room Layout The Unit 2 Main Control Board (QHCB) is a rotated image of the Unit 1 Main Control Board.
On sections A, B, and C of the Main Control Board the left-right relationship for all the controls and displays is identical.
This identical relationship for the A, B,
and C section includes the board layout and labeling.
The Control Room Design Review will note any differences this summer.
None are planned or expected.
0940m E2-6 05/19/88 SL-4696 l
e Georgia Power d ENCLOSURE 2 (Continued)
FACILITY DESIGN AND SYSTEMS RELEVANT TO CONTROL ROOH PERSONNEL AND OPERATIONAL CHARACTERISTICS The one exception to identical layout on the Main Control Board is the D section.
The D section was a backfit after the control room design was completed and floor space did not allow an identical arrangement.
Section D contains the same equipment on both units (RVLIS, PSMS, and Main Steam Bypass Isolation Valves).
Section D is on the left end of section A on unit I and to the right of section B on unit 2.
This will require looking left on unit 1 and right on unit 2 to verify that the Main Steam Bypass Isolation Valves are shut on a Main Steam Isolation.
There should be no impact on routine unit operation.
The rest of the Unit 2 Control Boards appear as if the Unit 1 Boards were moved west.
Their appearance on unit 2 will be the same as on unit 1 if you are standing in front of them.
The Electrical Auxiliary Board -
(QEAB) will appear somewhat different from the center of the control room.
In unit 1 it is over the right shoulder and in unit 2 it will be over the left shoulder.
This will require a slightly different scanning pattern during immediate operator action in the E0Ps but should have no impact on unit operation.
The high voltage section of the QEAB is different to reflect the differences in the switchyards but the Unit 2 inplant distribution systems will appear identical Unit 1.
The common distribution system is on the Unit 1 QEAB.
The control boards will be different to the extent that most common equipment is located on unit one.
The Process and Effluent Radiation Monitoring System Panel (PERHS) non-nfety related communications console for unit 2 will be at the west end of the QEAB instead of the east end of the Relay Panel as it is on unit 1.
See AX5052-A02 (Attached) for the control room layout.
Control Room Hall A security wall was erected through the center of the common control room to separate unit 1 from unit 2 when unit I security went into effect.
Original plans were for this wall to be removed when unit 2 security went into effect.
Current plans are to leave most of the wall to reduce cost, provide unit separation, and reduce inter-unit noise.
The wall will be open on the Shift Supervisors station, near the south door, and behind the QPCP.
0940m E2-7 05/19/88 SL-4696
t Georgia Power A ENCLOSURE 2 (Continued)
FACILITY DESIGN AND SYSTEMS RELEVANT TO CONTROL R00H PERSONNEL AND OPERATIONAL CHARACTERISTICS Plant Computers The plant computer (PROTEUS and ERF) terminals will be in mirror image locations.
The PROTEUS computer will be identical in function.
The ERF computer will be identical except that the common radiation monitors and weather data will be displayed only on unit 1.
Planned Differences Valve and Instrument Labeling Program The valves and instruments located at the Vogtle Electric Generating Plant are labeled with unique labels that indicate unit number, system number, valve or instrument number, the name of the valve or instrument indicating its purpose, the train if appropriate, and any special notes about the component.
Unit I has white rectangular (3" X 4") labels and unit 2 has round (4" diameter) blue labels.
Operations Procedure Binders The unit specific procedure binders (system operating procedures, lineup procedures, operations surveillance procedures, etc.) are marked indicating which unit they belong to.
Unit 1 procedures are marked with a large 1 and unit 2 procedures are marked with a large 2.
0940m E2-8 05/19/88 SL-4696