Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154P518 + (04:35:54, 11 December 2024)
- ML20154P517 + (04:35:55, 11 December 2024)
- ML20154P516 + (04:35:56, 11 December 2024)
- ML20154P511 + (04:35:57, 11 December 2024)
- ML20154P514 + (04:35:57, 11 December 2024)
- ML20154P510 + (04:35:58, 11 December 2024)
- ML20154P509 + (04:35:58, 11 December 2024)
- 05000277/LER-1988-017, :on 880705,shutdown Cooling Isolation Occurred as Result of Spurious High Pressure Signal.Caused by Lack of Supervision & Training Provided by Engineering Div Over Contractor Engineers.Isolation Reset + (04:36:00, 11 December 2024)
- ML20154P504 + (04:36:01, 11 December 2024)
- ML20154P501 + (04:36:02, 11 December 2024)
- NUREG-1290, Responds to Requesting Info Re NRC Policies & Procedures Concerning Differing Prof Opinions.W/O Encl NRC Manual Chapter 4125, Differing Prof Opinions, NUREG-1290, Errata Sheet & NUREG-1290 Addendum + (04:36:03, 11 December 2024)
- 05000320/LER-1988-007-01, :on 880428,one of Two Reactor Bldg Personnel Airlock Doors Maintained in Closed Position.Caused by Personnel Error.Airlock Attendants Advised to Maintain Both Doors Closed Unless Transit Exit in Progress + (04:36:04, 11 December 2024)
- ML20154P493 + (04:36:05, 11 December 2024)
- 05000354/LER-1988-012, :on 880430,reactor Manually Scrammed Following Circulating Water Sys (CWS) Infeeds Trip.Caused by Failure in CWS Multiplex (Mux) Sys.Replacement of CWS Mux Sys W/Hard Wired Sys Planned & Enhanced Maint Developed + (04:36:07, 11 December 2024)
- ML20154P486 + (04:36:08, 11 December 2024)
- ML20154P485 + (04:36:09, 11 December 2024)
- ML20154P483 + (04:36:10, 11 December 2024)
- ML20154P481 + (04:36:11, 11 December 2024)
- ML20154P482 + (04:36:11, 11 December 2024)
- ML20154P477 + (04:36:12, 11 December 2024)
- 05000341/LER-1988-017, :on 880427,control Ctr HVAC Shifted to Recirculation Mode Due to de-energization of Local Panel. Caused by Short in Panel When Burned Indicator Lamp Removed from Panel.Subj Lamp & Opened Fuse Replaced + (04:36:14, 11 December 2024)
- ML20154P475 + (04:36:15, 11 December 2024)
- ML20154P472 + (04:36:16, 11 December 2024)
- ML20154P474 + (04:36:16, 11 December 2024)
- ML20154P469 + (04:36:17, 11 December 2024)
- ML20154P468 + (04:36:18, 11 December 2024)
- ML20154P467 + (04:36:19, 11 December 2024)
- ML20154P466 + (04:36:19, 11 December 2024)
- ML20154P460 + (04:36:20, 11 December 2024)
- ML20154P459 + (04:36:21, 11 December 2024)
- U-603098, Submits Request to Reschedule Planned Insps for Corresponding Dates Listed.Util Ability to Ensure Result Dependent on Continued,Effective Communication with NRC Staff & NRC Restart Panel + (04:36:22, 11 December 2024)
- 05000293/LER-1988-012, :on 880425,automatic Start of Loop a Reactor Bldg Closed Cooling Water Sys Pump a Occurred.Caused by Accelerated Wear Induced Failure of Coupling in Pump B. Failed Coupling Replaced & Addl Measures Taken + (04:36:23, 11 December 2024)
- ML20154P455 + (04:36:24, 11 December 2024)
- ML20154P454 + (04:36:25, 11 December 2024)
- ML20154P451 + (04:36:26, 11 December 2024)
- ML20154P452 + (04:36:26, 11 December 2024)
- ML20154P450 + (04:36:30, 11 December 2024)
- ML20154P446 + (04:36:31, 11 December 2024)
- ML20154P445 + (04:36:32, 11 December 2024)
- ML20154P442 + (04:36:33, 11 December 2024)
- ML20154P438 + (04:36:34, 11 December 2024)
- IR 05000440/1988013 + (04:36:36, 11 December 2024)
- ML20154P435 + (04:36:36, 11 December 2024)
- ML20154P434 + (04:36:37, 11 December 2024)
- ML20154P432 + (04:36:38, 11 December 2024)
- ML20154P429 + (04:36:38, 11 December 2024)
- ML20154P427 + (04:36:39, 11 December 2024)
- ML20154P426 + (04:36:41, 11 December 2024)
- ML20154P424 + (04:36:42, 11 December 2024)
- ML20154P422 + (04:36:44, 11 December 2024)
- ML20154P418 + (04:36:45, 11 December 2024)