ML20154P454

From kanterella
Jump to navigation Jump to search
Forwards Supp 1 to NRC Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Matl Specs
ML20154P454
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/26/1988
From: Quay T
Office of Nuclear Reactor Regulation
To: Sylvia B
DETROIT EDISON CO.
References
IEB-87-002, IEB-87-2, NUDOCS 8806030339
Download: ML20154P454 (3)


Text

. . . - _ . . _ - _. ..

May 26, l'988

  • Docket No. 50-341 . _ DISTRIBUTIg

" DocketJ1, lea JPartlow Mr. 8 Ralph Sylvia NRC & Local PDRs GHolahan Group Vice President:- Nuclear PD31 Plant Gray ACRS (10)

Operations EJordan TQuay Detroit Edison Company RIngram .

6400. North Dixie Highway . ,

Newport, Michigan 48166

Dear Hr. Sylvia:

SUBJECT:

NRC BULLETIN N0. 87-02, SUPPLEMENT 1: FASTENER TESTING-T0 DETERMINE ~

CONFORMANCE WITH APPLICABLE MATERIAL SPECIFICATIONS NRChasbeennotifiedbyLynnGoodmanofhourstaffthatacopyofthesubject

-NRC Culletin has not been received by Detroit Edison. A,oparently Detroit Edison became aware that other utilities had received the Supplement.

Enclosed ic a copy of the. Supplement for your action. ,

Sincerely, c-bs h D.

Theodore R. Quay, Project Manager i Project Directorate III-1 Division of Reactor Projects - III, IV, V

& Special Projects cc w/ enclosure:

See next page LA/PD31:DRSP PM/PD31:DRSP DRSP l NIngram TQuay: rPf4 D/fQ41h DW114 i 5/25/88 5/25/88 5/'M/88 l OFFICIAL RECORD COPY G

l

)

9

, . , - _ . , , - . . . . . - - - - - - - . , _ . _,-,-,--.y--~~,,,.e-, y ye- --.r ,- -e w--r ---M -t--r- -~--'*-w- " - w

-- '+ V * * * " * * * ' * ~ ' " -~ #= 'r--

8  %, UNITED STATES

!, o NUCLEAR REGULATORY COMMISSION

, h ,$ WASHINGTON, D. C. 20555 '

,/ May 26, 1988 Docket No. 50-341 Mr. B. Ralph Sylvia Group Vice President - Nuclear Operations Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166

Dear Mr. Sylvia:

SUBJECT:

NRC BULL'ETIN NO. 87-02, SUPPLEMENT 1: FASTENER TESTING TO DETERMINE CONFORMANCE WITH APPLICABLE MATERIAL SPECIFICATIONS NRC has been notified by Lynn Goodman of your staff that a copy of the subject NRC Bulletin has not been received by Detroit Edison. Apparently Detroit Edison became aware that other utilities had received the Supplement. l Enclosed is a copy of the Supplement for your action.

Sincerely, ock.cu..h. )

i Theodore R. Quay, Project Manager l Pro;iect Directorate III-1 Divi sion of Reactor Projects - III, IV, V l

& Special Projects l

cc w/ enclosure:

See next page i

l l . j Mr. 8. Ralph Sylvia Detroit Edison Company Fermi-2 Facility j

1 cc:

Mr. Ronald C. Callen Hs. Lynn Goodman Adv. Planning Review Section Supervisor - Licensing Michigan Public Service Commission Detroit Edison C0mpany 6545 Mercantile Way Fermi Unit 2 P. O. Box 30221 6400 North Dixie Highway i

Lansing, Michigan 48909 Newport, Michigan 48166 l John Flynn, Esq.

Senior Attorney Detroit Edison Corapany 2000 Second Avenue l t

Detroit, Michigan 48226 NuclearFacilitiesandEnvironmentai Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Mr. Thomas Randazzo Director, Regulatory Affairs Detroit Edison Company Fermi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 Mr. Walt Rogers U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Ho.1 roe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan 48161 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

~ , , . , . - .

_ ,. ,y,.. - , -

, OMB No.
3150-0011 NRCB 87-02, Supplement 1 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C. 20555 April 22,1988 .

NRC BULLETIN NO. 87-02, SUPPLEMENT 1: FASTENER TESTING TO DETERMINE CONFORMANCE WITH APPLICABLE MATERIAL SPECIFICATIONS Addressees:

All holders of operating licenses or construction pemits for nuclear power reactors.

Purpose:

The purpose of this supplement is to require addressees to submit additional infomation on the source of fasteners purchased for use ir nuclear power .

plants. ,

Description of Circumstances:

Item 5 of NRC Compliance Bulletin 87-02 requested that all holders of operating

' licenses or construction pemits for nuclear power reactors subnit irifomation regarding the identity of the suppliers and manufacturers of the safety-related and non-safety-related fasteners selected for testing. After further consider-ation, the NRC has detemined that it needs information regarding the identity ,

of all vendors from which safety-related and non-safety-related fasteners have  !

been obtained within the past 10 years, a reasonable period which will not put  !

undue burden on addressees. This infomation will assist the NRC in determin-

~. ing whether nuclear facility fasteners in use have been supplied in accordance with their intended use. In addition, this infonnation is needed so that the NRC can properly coordinate infonnation with other government agencies con-cerned with problems identified in the quality of fasteners.

Action Required:

Within 90 days frm the receipt of this supplemental bulletin, addressees shall provide the following infonnation concerning the procurement of fasteners within the past 10 years:

1. A list of the suppliers and manufactu'rers from which safety-related fasteners have been purchased, including addresses, and the type of fasteners purchased (i.e., the material specifications). For those fastener purchases made from fastener suppliers and/or original equipment manufacturers, any available infonnation concerning the manufacturer or sub tier supplier of the fastener also should be provided.

= =mm 3 P-

.. .- .L _ . . . . . . . . . . . . .

, /,~

  • NRCf) 87-02, Su.eplenent 1 April 22, 1988 Page 2 of 2
2. For non-safety-related fasteners the same infonnation as requested in item 1.

The written reports Mquested above shall be addressed to the U.S. Nuclent ..

Regulatory Comission. ATTN:' Document Centrol Desk Washington, DC 20555, under oath or Act of 1954, as affirmation amended. under the previsions of Section 182a, Atomic Energy priate Regio ~nal Administrator. In addition, a copy shall be submitted to the appro-This requirement for infomation was approved by the Office of Nanagement and Budget under a Nanket c1carr.nce number 3150-0011. Coments on burden and duplication may be directed to the Office of Management .and Budget Report; Managenent,, Room 3208, New Executive Office Bu11dino, Washington, D.C. 20503.

If you have any ques *, ions about this matter, pleas + contact cr.e of the techni-cal contactL11sted regional office. below or the Regional Administrator hf tht appropriata 0 's { kw% -

Charles E. F:ossi, Director Division of Operational Events Assessment Office of Nuclear Ranctor Regulation

~

Technical Contacts: J. T. Conway, WPR (301) 49i'-0978.

E. T. Baker, NRR

_ (301)4S2-3221 Attachmet.t: List of Recently Issued NRC Bulletins er'

- , - - _ . - . . .--, ,_ ,_,- _.-_, , ,. , , . _ , , , . . , _ _ , _ _ . . . . . . . . . _ , _ . _ , . . , _ _ - , . . _ , , . .- m.v, _ - _ . _ . . . . - ..,. _ m . _. .-_,,,,,

l !. . . . . . . .. .

Attachment NRCB 87-02, Supplement 1 April 22,1988 LIST OF RECENTLY ISSUED NRC BULLETINS

'culletin Date of .

No. Subject Issuance issued to 88-03 Inadequate Latch Engagement 3/10/88 All holders of OLs in HFA Type Latching Relays or cps for nuclear Manufactured by General power reactors.

Electric (GE) Company 88-02 Rapidly Propagating Fatigue P/5/88 All holders of OLs Cracks in Steam Generator or cps for W-designed Tubes nuclear podr reactors with steam generators having carbon steel support plates.

88-01 Defects in Westinghouse 2/5/88 All holders of OLs Circuit Breakers or cps for nuclear power reactors.

87-02 Fastener Testing to 11/6/87 All holders of OLs Detemine Confomance or cps for nuclear with Applicable Material power reactors.

Specifications 87-01 Thinning of Pipe Walls in 7/9/87 All licensees for Nuclear Power Plants nuclear power plants holding an OL or CP.

86-04 Defective Teletherapy Timer 10/29/86 All NRC licensees That May Not Terminate Dose authorized to use cobalt-60 teletherapy

. units.

86-03 Potential Failure of Multiple 10/8/86 All facilities ECCS Pumps Due to Single holding an OL or Failure of Air-0>erated Yalve CP.

in Minimum Flow tecirculation Line 86-02 Static "0" Ring Differential 7/18/86 All power reactor Pressure Switches facilities holding an OL or CP.

86-01 Minimum Flow logic Problems 5/23/86 All GE BWR facilities That Could Disable RHR Pumps holding an OL or CP.

OL = Operating License CP = Construction Permit

.___ _ _ _