Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155D748 + (02:48:39, 11 December 2024)
- PNO-III-86-035, on 860410,during Reactor Shutdown, Unidentified Leak in Primary Coolant Sys Surpassed One Gpm. Caused by Relief Valve in Letdown Sys Leaking Primary Coolant Into Quench Tank.Addl Leakage Source Investigated + (02:48:41, 11 December 2024)
- ML20155D745 + (02:48:42, 11 December 2024)
- IR 05000295/1986002 + (02:48:43, 11 December 2024)
- ML20155D744 + (02:48:43, 11 December 2024)
- ML20155D741 + (02:48:44, 11 December 2024)
- ML20155D739 + (02:48:45, 11 December 2024)
- 05000368/LER-1998-007, :on 981005,min Shift Crew Composition Was Not Maintained.Caused by Inadequate Training to Instructors on Use of Scantron Grading Machine.Provided Training on Scantron Machine & Revised Procedures.With + (02:48:46, 11 December 2024)
- ML20155D737 + (02:48:48, 11 December 2024)
- IR 05000354/1988017 + (02:48:50, 11 December 2024)
- ML20155D734 + (02:48:50, 11 December 2024)
- ML20155D733 + (02:48:51, 11 December 2024)
- ML20155D732 + (02:48:51, 11 December 2024)
- 05000321/LER-1986-007-01, :on 860331,standby Gas Treatment Filter Train 1A Found Degraded by Wet Downstream Charcoal Absorber Bed. Caused by Personnel Failure to Recognize Potential Leaking Deluge Valve.Charcoal Bed Replaced + (02:48:53, 11 December 2024)
- ML20155D730 + (02:48:54, 11 December 2024)
- RBG-28910, Application for Amend to License NPF-47,revising Tech Specs 3.0.4,4.0.3 & 4.0.4 Re Applicability of Limiting Conditions for Operations & Surveillance Requirements Per Generic Ltr 87-09.Fee Paid + (02:48:55, 11 December 2024)
- ML20155D725 + (02:48:55, 11 December 2024)
- ML20155D720 + (02:48:56, 11 December 2024)
- ML20155D719 + (02:48:57, 11 December 2024)
- ML20155D718 + (02:48:57, 11 December 2024)
- ML20155D716 + (02:48:58, 11 December 2024)
- ML20155D713 + (02:48:59, 11 December 2024)
- ML20155D712 + (02:48:59, 11 December 2024)
- ML20155D711 + (02:49:00, 11 December 2024)
- ML20155D710 + (02:49:00, 11 December 2024)
- ML20155D708 + (02:49:01, 11 December 2024)
- ML20155D706 + (02:49:03, 11 December 2024)
- ML20155D707 + (02:49:03, 11 December 2024)
- ML20155D703 + (02:49:04, 11 December 2024)
- IR 05000373/1986008 + (02:49:06, 11 December 2024)
- ML20155D699 + (02:49:07, 11 December 2024)
- 05000346/LER-1988-012, :on 880509,safety Features Actuation Sys (Sfas) Signal Received & Sys Actuated on High Radiation Level. Caused by Passing Filter Elements Near Radiation Detectors Used to Initiate Sfas.Procedure Revised + (02:49:09, 11 December 2024)
- ML20155D695 + (02:49:10, 11 December 2024)
- IR 05000454/1998018 + (02:49:11, 11 December 2024)
- PNO-III-86-026B, on 850803 & 1217 & 860126,licensee Researcher Received Tritium Overexposure.Caused by Tritium Entering Lab from Hood Where Experiment Performed.Main Lab Remains Secured Pending Completion of Decontamination + (02:49:11, 11 December 2024)
- W3P88-0995, Application for Amend to License NPF-38,consisting of Tech Spec Change Request NPF-38-82.Amend Would Revise Table 3.3-1, Reactor Protective Instrumentation, Allowing Plant Operators to Bypass Reactor Coolant flow-low Trip.Fee Paid + (02:49:12, 11 December 2024)
- ML20155D690 + (02:49:12, 11 December 2024)
- 05000250/LER-1998-006-02, :on 981006,unescorted Access Was Granted to Contractor Employee Who Falsified Background Info.Caused by Individual Who Knowingly Provided False Info.Denied Access to Individual on 981006.With + (02:49:14, 11 December 2024)
- ML20155D686 + (02:49:15, 11 December 2024)
- ML20155D685 + (02:49:16, 11 December 2024)
- ML20155D682 + (02:49:17, 11 December 2024)
- ML20155D679 + (02:49:17, 11 December 2024)
- JPN-88-026, Forwards Info Re Mark I Containment Severe Accident,Per H Abelson 880524 Request.Info Has Not Undergone Detailed Verification & QC Process Due to Extremely Short Response Time Requested by NRC + (02:49:18, 11 December 2024)
- ML20155D677 + (02:49:18, 11 December 2024)
- ML20155D675 + (02:49:19, 11 December 2024)
- LG-85-001, Responds to Violations Noted in Insp Rept 50-341/85-31. Corrective Actions:Maint Instruction MI-M049, Control & Use of Procedures/Instructions within Main Section, Revised to Solicit & Incorporate User Feedback + (02:49:20, 11 December 2024)
- ML20155D674 + (02:49:20, 11 December 2024)
- ML20155D671 + (02:49:21, 11 December 2024)
- ML20155D672 + (02:49:21, 11 December 2024)
- ML20155D669 + (02:49:22, 11 December 2024)
- ML20155D667 + (02:49:23, 11 December 2024)
- NRC-88-0235, Responds to CAL-RIII-88-24 Re Reactor Recirculation Pump B Discharge Valve Failure.Prior to Restart,Engineering Validation of Min & Max Torque Switch Settings & Field Insp Reviewed for Sample Population to Validate Data on Torques + (02:49:23, 11 December 2024)