GPU Nuclear, Inc.

(

U.S. Route #9 South NUCLEAR Post Office Box 388 Forked River, NJ 08731-0388 Tel 609-9714000 October 26,1998 1940-98-20634 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Secondary Containment Capability Results

- The Oyster Creek Nuclear Generating Station Technical Specifications require:

4.5.G.2

"(Secondary Containment) tests shall be performed at least once per operating cycle..."

4.5.G.3

" A secondary containment capability test shall be conducted at each refueling outage prior to refueling."

4.5.G.4 "The results of the secondary containment capability tests shall be in the subject of a summary technical report..."

Attachment I to this letter documents the completion of requirements 4.5.G.2 and 4.5.G.3 by docketing the report required in 4.5.G.4.

If any additional information or assistance is required, please contact Mr. John Rogers of my staff at 609.971.4893.

Very truly yours, hI h

f 9811030304 981026 Michael B. Roche DR ADOCK 050 29 p

Vice President and Director Oyster Creek OI MBR/JJR Attachment cc:

Administrator, Region I NRC Project Manager Senior Resident Inspector

Attachment I Summary Technical Report Secondary Containment Capability Test Oyster Creek Nuclear Generating Station Operating Cycle 16; Prior to Refueling Outage 17R Date Performed: September 12,1998 1.

Wind Speed Test Prerequisite Observed

... calm wind."

10.3 mph 2.

Standby Gas Treatment System Flow Rate Test Requirement Test Results

< 4000 cfm 2505 cfm 3.

Reactor Build!ng Differential Pressure Test Requirements Test Results Both Reactor Airlock Doors Closed 2 0.25 inches W.G.

0.436 inches W.G.

Outer Railroad Airlock Door Open 2 0.25 inches W.G.

0.440 inches W.G.

Inner Railroad Airlock Door Open 2 0.25 inches W.G.

0.358 inches W.G.

.}