Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195D261 + (00:14:57, 11 December 2024)
- ML20195D258 + (00:14:58, 11 December 2024)
- ML20195D257 + (00:14:59, 11 December 2024)
- ML20195D256 + (00:14:59, 11 December 2024)
- ML20195D254 + (00:15:00, 11 December 2024)
- ML20195D253 + (00:15:00, 11 December 2024)
- ML20195D251 + (00:15:01, 11 December 2024)
- 05000354/LER-1998-007-02, :on 981009,standby Liquid Control Pump Inoperability Was Noted Due to Incorrectly Performed Ist. Caused by Personnel Error.Revised Test Procedure. with + (00:15:03, 11 December 2024)
- NRC-88-0239, Provides Correction to 880725 Final Response to NRC Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings + (00:15:04, 11 December 2024)
- 3F0586-16, Responds to Violations Noted in Insp Rept 50-302/86-11. Corrective Actions:Hydrolasing of Reactor Coolant Pump B Terminated Until Evaluation of Activity & Associated Radiological Hazards Performed + (00:15:05, 11 December 2024)
- PY-CEI-NRR-2335, Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With + (00:15:05, 11 December 2024)
- IR 05000277/1988013 + (00:16:53, 11 December 2024)
- ML20195D242 + (00:16:54, 11 December 2024)
- ML20195D241 + (00:16:54, 11 December 2024)
- ML20195D239 + (00:16:56, 11 December 2024)
- ML20195D238 + (00:16:56, 11 December 2024)
- ML20195D237 + (00:16:57, 11 December 2024)
- ML20195D236 + (00:16:57, 11 December 2024)
- ML20195D234 + (00:16:58, 11 December 2024)
- ML20195D231 + (00:16:59, 11 December 2024)
- ML20195D233 + (00:16:59, 11 December 2024)
- ML20195D230 + (00:17:00, 11 December 2024)
- ML20195D226 + (00:17:01, 11 December 2024)
- ML20195D225 + (00:17:02, 11 December 2024)
- ML20195D223 + (00:17:02, 11 December 2024)
- ML20195D221 + (00:17:03, 11 December 2024)
- ML20195D217 + (00:17:04, 11 December 2024)
- ML20195D219 + (00:17:04, 11 December 2024)
- ML20195D213 + (00:17:08, 11 December 2024)
- ML20195D211 + (00:17:09, 11 December 2024)
- ML20195D212 + (00:17:09, 11 December 2024)
- 3F0586-15, Responds to Violations Noted in Insp Rept 50-302/86-04.No Corrective Action Necessary Since Operations Personnel Trained Annually on Abnormal Procedures + (00:17:11, 11 December 2024)
- 1CAN069902, Application for Amend to License DPR-51,revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks + (00:17:12, 11 December 2024)
- ML20195D207 + (00:17:12, 11 December 2024)
- ML20195D206 + (00:17:13, 11 December 2024)
- ML20195D205 + (00:17:14, 11 December 2024)
- ML20195D204 + (00:17:15, 11 December 2024)
- ML20195D200 + (00:17:16, 11 December 2024)
- ML20195D203 + (00:17:16, 11 December 2024)
- ML20195D199 + (00:17:17, 11 December 2024)
- ML20195D198 + (00:17:18, 11 December 2024)
- NG-86-1475, Forwards Preliminary Response to IE Bulletin 85-003,Item E Re motor-operated Valve Common Mode Failures During Plant Transients.Extension Requested Until 45 Days After BWR Owners Group Rept Submitted to NRC + (00:17:18, 11 December 2024)
- ML20195D196 + (00:17:20, 11 December 2024)
- ML20195D195 + (00:17:20, 11 December 2024)
- ML20195D194 + (00:17:21, 11 December 2024)
- ML20195D192 + (00:17:21, 11 December 2024)
- ML20195D191 + (00:17:22, 11 December 2024)
- ML20195D190 + (00:17:23, 11 December 2024)
- ML20195D185 + (00:17:23, 11 December 2024)
- PNO-II-86-036, on 860515,during Power Escalation Tests at 100% Power,Steam Generator Tube Leak Detected.Unit Out of Svc for 10 Days to Repair Leak + (00:17:24, 11 December 2024)
- ML20195D179 + (00:17:25, 11 December 2024)
- 05000412/LER-1988-015-01, :on 880928,util Informed of Cracking & Spalling at Support Pads of Diesel Generator Exhaust Silencers 2EDG*SIL3A & 3B.Caused by Bent Anchor Bolts.Increased Surveillance Recommended.Part 21 Related + (00:17:27, 11 December 2024)