ML20195D261
| ML20195D261 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 06/15/1988 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20195D265 | List: |
| References | |
| NUDOCS 8806230082 | |
| Download: ML20195D261 (2) | |
See also: IR 05000353/1988010
Text
.
.
..
.
.
.
.
4
>x
- 16 JUN 1988
Docket No. 50-353
Philadelphia Electric Company
ATTN:
Mr. C. A. McNeill
Executive Vice President-Nuclear
2301 Market Street
Philadelphia, PA
19101
Gentlemen:
Subject:
Inspection Report 50-353/88-10
This letter transmits our report of the routine resident safety inspection by
Messrs. R. A. Gramm and R. L. Fuhrmeister on April 11, 1988 to May 22, 1988 at
the Limerick Generating Station, Unit 2, Limerick, Pennsylvania of activities
authorized by NRC License No. CPPR-107 and to the discussions held by the
inspector with Mr. J. M. Corcoran and other members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed NRC
Region I Inspection Report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel and observations by the inspectors.
Based on the results of this inspection, it appears that an activity was not
conducted in full compliance with NRC requirements, as set forth in the Notice
of Violation enclosed as Appendix A.
Examination of a General Electric
designed instrument rack found that the weld configuration did not conform
to the design drawing requirements. This violation has been categorized by
sev"-ity level in accordance with the NRC Enforcement policy (10 CFR 2,
Apr dix C).
A response to this report is required by 10 CFR 2.201.
Please follow the
instructions in Appendix A in the preparation of your response.
The response
directed by Appendix A, Notice of Violation, is not subject to the clearance
procedures of the Office of Management and Budget as rer,uired by the Paperwork
Reduction Act of 1980, PL 96-511.
OFFICIAL RECORD COPY
IR LIM 2 88-10 - 0001.0.0
06/10/88
8806230082 880615
I (
.
ADOCK 0500
3
QC'
{
. - -
.
-
-
-
-
.-.
-.
-
-
--
t
.
.
' . ,
.
.
.
Philadelphia Electric Company
2
.
45 JUN 1988
Your cooperation is appreciated.
Sincerely,
,
si*t Wf
Edward C. Wenzinger, Chief
Projects Branch No. 2
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report 50-353/88-10
cc w/encls:
John S. Kemper, Sr. , Senior Vice President-Nuclear
S. J. Kowalski, Vice President, Nuclear Engineering
W. T. Ullrich, Manager, Limerick Unit 2 Startup
'
J. M. Corcoran, Manager, Lirerick Quality 01 vision
Troy B. Conner, Jr. , Esquire
Dave Honan, Limerick 2 Licensing
Eugene J. Bradley, Esquire, Assistant General Counsel
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
l
bec w/encls:
J
RegionIDocketRoom(withconcurrences)
i
Management Assistant, DRMA (w/o encl)
'
J. Linville, Section Chief, RPS 2A
J. Durr, Branch Chief, DRS
R. Clark, NRR
B. C byton, E00
SRI, Li erick 1
!
L
R
RI:DRP
Linville/rbl
Wenzinger
l
6/l0/88
6//l/ /88
0FFICIAL RECORD COPY
IR LIM 2 88-10 - 0002.0.0
06/10/88
.
.
_.
-
..
. . . .
-