ML20195D261

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-353/88-10 on 880411-0522 & Notice of Violation
ML20195D261
Person / Time
Site: Limerick Constellation icon.png
Issue date: 06/15/1988
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20195D265 List:
References
NUDOCS 8806230082
Download: ML20195D261 (2)


See also: IR 05000353/1988010

Text

. .

.. .

.

.

.

4

>

x

16 JUN 1988

Docket No. 50-353

Philadelphia Electric Company

ATTN: Mr. C. A. McNeill

Executive Vice President-Nuclear

2301 Market Street

Philadelphia, PA 19101

Gentlemen:

Subject: Inspection Report 50-353/88-10

This letter transmits our report of the routine resident safety inspection by

Messrs. R. A. Gramm and R. L. Fuhrmeister on April 11, 1988 to May 22, 1988 at

the Limerick Generating Station, Unit 2, Limerick, Pennsylvania of activities

authorized by NRC License No. CPPR-107 and to the discussions held by the

inspector with Mr. J. M. Corcoran and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed NRC

Region I Inspection Report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel and observations by the inspectors.

Based on the results of this inspection, it appears that an activity was not

conducted in full compliance with NRC requirements, as set forth in the Notice

of Violation enclosed as Appendix A. Examination of a General Electric

designed instrument rack found that the weld configuration did not conform

to the design drawing requirements. This violation has been categorized by

sev"-ity level in accordance with the NRC Enforcement policy (10 CFR 2,

Apr dix C).

A response to this report is required by 10 CFR 2.201. Please follow the

instructions in Appendix A in the preparation of your response. The response i

directed by Appendix A, Notice of Violation, is not subject to the clearance l

procedures of the Office of Management and Budget as rer,uired by the Paperwork l

Reduction Act of 1980, PL 96-511.

OFFICIAL RECORD COPY IR LIM 2 88-10 - 0001.0.0

06/10/88

8806230082 880615 # I

PDR ADOCK 0500 3

.

(

QC' {

. - - . - - - - .-. -. - - --

t . .

.

'., . .

. Philadelphia Electric Company 2

45 JUN 1988

Your cooperation is appreciated.

Sincerely,

,

si*t Wf

Edward C. Wenzinger, Chief

Projects Branch No. 2

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Inspection Report 50-353/88-10

cc w/encls:

John S. Kemper, Sr. , Senior Vice President-Nuclear

S. J. Kowalski, Vice President, Nuclear Engineering

W. T. Ullrich, Manager, Limerick Unit 2 Startup '

J. M. Corcoran, Manager, Lirerick Quality 01 vision

Troy B. Conner, Jr. , Esquire

Dave Honan, Limerick 2 Licensing

Eugene J. Bradley, Esquire, Assistant General Counsel

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

l bec w/encls:

J RegionIDocketRoom(withconcurrences)

i'

Management Assistant, DRMA (w/o encl)

J. Linville, Section Chief, RPS 2A

J. Durr, Branch Chief, DRS

SLO

R. Clark, NRR

B. C byton, E00

SRI, Li erick 1

!

L

R DRP RI:DRP

Linville/rbl Wenzinger

l

6/l0/88 6//l/ /88

0FFICIAL RECORD COPY IR LIM 2 88-10 - 0002.0.0

06/10/88

l

. . _. -

.. . . . . -