Text
-
October 31, 1983 DISTRIBUTION tocket Mos. 50-334 lWireTTfh?
Gray File 50-41?
NRC & Local PDRs T. Alexicn S. Yarga Mr. J. D. Sieber, Vice President B. Poger Nuclear Grous S. Norris Cuquesne L191t Corpany P. Tam Post Office Fox 4 OGC Shippingport. PA 15077 E. Jordan C. Crires
Dear Mr. Sieber:
ACRS(10)
SUBJECT:
DEAVER VALLEY UNITS 1 AhD 2 - RESPONFES T0 hRC BULLETIN IW-04 (TAC 69882AND 69883 )
l On May S. 19PS, the NRC staff issued Bulletin C8 04, "Potential Saftty-Related l
Pus'p Loss." The tulletin requested licensees and permit holders to evaluate l
all safety-related purps for (1) pt.:s-to-purp interaction during miniflow l
operation that could result in dead 'eading of one or s. ore of the pua'ps, and l
(2) the adequacy of the minimum flow bypass lints with respect to darage resulting from operation and testing in the minirnum flow rede. Within (0 days of receipt Itcensees provide a written response that (a) surrartres the probles.s and the systees affected (b) identifies the short-term and long-tersi nodifications to pl,nt operating procedures or hardware that have been or are being trp1t'e+nted to ensure safe plant operations, (c) identifies an appropriate schedule for long-term resolution of this ard/or other significant problems that are identified as a result of this tulletin, and (d) provides justification for continued operation.
Fy letters dated July 13 and August b.190S, you responded to Bulletin EC-04 Your responses presided the infor1 ration requested in (a), (b), (c) and (d) above. You stated that all of the safety-related punps are considered adequately protected against the concerns stated in Eu11etin F8-04, and that ro short-tert er long-tein eodifications are needed.
Your letters fulfill the infortation requirttents of Eulletin 86 04 As discussed in Bulletin E8-04, you should docueent and raintain internally fer at least ? years vour evaluations of the units in resper, ding to the bulletin.
These records ray te subject to future auditing.
Sincerely, e n *A Peter S. Teo, Senior Projtct Panager, Project Directorate I-4 Division of Peactor Projects I/Il cc: Sce next page LA:fpL-4s' PM:FDI-F
' -4 SNffris PTam:1r JS L_.
,g 10/cNCC 10/J//E 10 (/E8
{
n p$f o
3
Mr. J. Sieber Beaver Valley Power Statitn Duquesne Light Company Units 1 8 2 CC:
Jay E. Silberg Esquire Bureau of Radiation Protection Shaw. Pittran. Potts and Trowbridge Pennsylvania Department of 2300 N Street. N.W.
Environmental Resources Washington, DC 20037 ATTN:
R. Jarati Post Office Box 2063 Kenny Grada. Maracer Harrisburg, Pennsylvania 17120 i
Nuclear Safety Duquesne Light Corpany Mayor of the Borrough of P. O. J 4
Shippingport Shipp i3p.
Pennsylvania 15077 Post Office Box 3 Shippingport. Pannsylvania 15077 Wiilian w,, Manager Ashley C. Schannauer Nuclear Operations Cepartrent Assistarit City Solicitor Post Office Box 4 City of Pittsburgh Duquesne Light Corpany 313 City Ceunty Buildirg Shippingport. Pennsylvania 15077 Pittst,urgh, Pennsylvania 15?1g John A. Lee. Esquire Regfor.41 Adr.inistrator. Region !
Duquesne Light Corp 6,3y U.$. Nuclear Regulatory Cornission One Oxford Cettre 475 Allendale Road 301 Grant Street King of Prussia Pennsylvania 19406 j
Pittsburgh, Pennsylvania 15279 W.F. Camichael Ccw.isstorer Resider,t Inspector Cepartsent of Labor U.S. Nuclear Regulatory Ccesission IFC0 Washington Street East Post Office Eox 161 i
Charleston. West Virgiaia P5305 Shippingport. Pennsylvania 15077 l
l l
John D. Borrows Director Pennsyhar,ta Frergency i
Director. Utilities Cepartsent Faragerent Agency l
Public Utilities Cornission Post Office Ecx 3321 1E0 East Bread Street Harrisburg Pennsylvania 17105-3??1 Columbus Ohio 4378-0573 I