Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196E492 + (21:47:00, 10 December 2024)
- 05000382/LER-1988-002, :on 880126,reactor Manually Tripped When Reactor Coolant Pump Upper Thrust Bearing Overheated.Caused by Clogged Lube Oil Strainer.Small Mesh Strainer Replaced W/Larger Mesh Strainer + (21:47:02, 10 December 2024)
- LIC-98-0161, Forwards Fort Calhoun Station Oct 1998 Performance Indicators Rept + (21:47:03, 10 December 2024)
- B12823, Forwards Comments on NRC 871112 SER Re Cycle 15 Reload Licensing Amend.Incorporation of Comments Into Sser Requested + (21:47:07, 10 December 2024)
- ML20196E484 + (21:47:07, 10 December 2024)
- ML20196E483 + (21:47:08, 10 December 2024)
- ML20196E482 + (21:47:09, 10 December 2024)
- ML20196E481 + (21:47:10, 10 December 2024)
- ML20196E477 + (21:47:11, 10 December 2024)
- ML20196E475 + (21:47:14, 10 December 2024)
- ML20196E472 + (21:47:14, 10 December 2024)
- U-603117, Requests That Start of Planned Insp Be Delayed Until 990208. Extension Will Provide Util with Time Necessary to Monitor Adequacy & Effectiveness of Corrective Actions Recently Implemented + (21:47:15, 10 December 2024)
- ML20196E468 + (21:47:16, 10 December 2024)
- AECM-88-0242, Advises That Results of Analysis Will Be Submitted W/ Description & Schedule for Boraflex Surveillance Program on 890228 + (21:47:16, 10 December 2024)
- ST-HL-AE-2870, Informs of Util Readiness for Fuel Loading & Low Power Testing of Util as Early as 881216 But No Later than 881224. Completion of NRC Requirements at Time of Fuel Load Expected Except Items Detailed in Encl + (21:47:17, 10 December 2024)
- ML20196E462 + (21:47:18, 10 December 2024)
- 05000254/LER-1999-004-02, :on 990521,reactor Scram Occurred.Caused by Steam Intrusion Into Scram Discharge Volume.Procedure Qcop 12200-11, RWCU Sys Startup & Pump Operation, Revised + (21:47:19, 10 December 2024)
- IR 05000245/1988001 + (21:47:21, 10 December 2024)
- ST-HL-AE-2888, Responds to NRC Bulletin 88-010, Nonconforming Molded - Case Circuit Breakers. Due to Magnitude & Complexity of Task,Not Clear That Util Can Complete All Actions Required Prior to Fuel Load.Results of Evaluation Expected by 890401 + (21:47:22, 10 December 2024)
- PNO-I-88-023, on 880223,ConAm Truck Carrying Radiography Device,Containing Ir-192 Source,Ran Off Road Near Wilmington,De.Source & Device Found Intact.Driver Appeared Intoxicated.Licensee Took Possession of Source on 880223 + (21:47:22, 10 December 2024)
- ST-HL-AE-2864, Discusses Status of Equipment Qualification Program to Provide Assurance That safety-related Electrical & Mechanical Equipment Perform Intended Function,Per NRC Request for Addl Info Re Differences Between Units 1 & 2 + (21:47:23, 10 December 2024)
- ML20196E452 + (21:47:27, 10 December 2024)
- ML20196E450 + (21:47:27, 10 December 2024)
- ML20196E449 + (21:47:29, 10 December 2024)
- 05000446/LER-1999-004, :on 990522,train a EDG Start,Occurred.Caused by Lockout Relay Actuation.Developed Troubleshooting Plan to Help Identify Cause of Problem.With + (21:47:30, 10 December 2024)
- RBG-28118, Application for Amend to License NPF-47,revising Tech Spec 6.8.4.d Due to Proposed Changes to Asiatic Clam Control Program.Fee Paid + (21:47:31, 10 December 2024)
- ML20196E445 + (21:47:32, 10 December 2024)
- IR 05000395/1988023 + (21:47:37, 10 December 2024)
- ML20196E443 + (21:47:37, 10 December 2024)
- 0CAN119810, Forwards ANO-1 10CFR50.59 Rept for 1998. Rept Contains Brief Description Changes in Procedures & in Facility. Included in Summary Rept Are Evaluations That Were Common to Both ANO-1 & ANO-2 + (21:47:38, 10 December 2024)
- ML20196E442 + (21:47:38, 10 December 2024)
- ML20196E440 + (21:47:39, 10 December 2024)
- ML20196E436 + (21:47:42, 10 December 2024)
- ML20196E434 + (21:47:43, 10 December 2024)
- IR 05000213/1998004 + (21:48:01, 10 December 2024)
- ML20196E430 + (21:48:02, 10 December 2024)
- ML20196E427 + (21:48:04, 10 December 2024)
- ML20196E424 + (21:48:05, 10 December 2024)
- ML20196E423 + (21:48:05, 10 December 2024)
- ML20196E421 + (21:48:06, 10 December 2024)
- ST-HL-AE-2885, Submits Outline of Plans for Usage & Monitoring of Full Length Hafnium Control Rods.Util Will Perform Control Rod Insps Similar to Those at Wolf Creek at or Before Third Refueling Outage + (21:48:07, 10 December 2024)
- ML20196E417 + (21:48:08, 10 December 2024)
- ML20196E416 + (21:48:08, 10 December 2024)
- ML20196E415 + (21:48:09, 10 December 2024)
- ML20196E414 + (21:48:10, 10 December 2024)
- 05000254/LER-1988-004, :on 880126,Impell Corp Notified Station That Line 1-0216-1/2 Inches Not Qualified to FSAR Criteria for Allowable Stress.Caused by Design Error.Impell Corp Developing Mod to Correct Condition + (21:48:12, 10 December 2024)
- ML20196E410 + (21:48:13, 10 December 2024)
- ML20196E409 + (21:48:14, 10 December 2024)
- ML20196E408 + (21:48:14, 10 December 2024)
- ML20196E405 + (21:48:16, 10 December 2024)
- ML20196E406 + (21:48:16, 10 December 2024)