ML20196E442

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations
ML20196E442
Person / Time
Site: Seabrook  
Issue date: 06/22/1988
From: Robinson D
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-01184, 53FR16435-1184, NUDOCS 8807010622
Download: ML20196E442 (1)


Text

DOCKET NUM8GR PROPOSED RULE k @

l/M 3 FR gy auNE 22,I9s8 W

qJ4N:. g.t a

SECRETARY OF THE COMMISSION ATTENTION: DOCKETING & SERVICE BRANCH US NUCLEAR REGULATORY COMMISSION 18 Jui 23 P6 :04 WASHINGTONr DC 20555 0 KblY (iflb(lcf' DEAR SECRETARY OF THE COMMISSION:

BRANLy I AM WRITING TO INDICATE MY SUPPORT OF THE PROPOSED CLARIFICATION OF EMERGENCY PLANNING REQUIREMENTS FOR LOW-POWER LICENSES, TO MAKE CLEAR THAT OFF SITE EMERGENCY SIRENS ARE NOT REQUIRED DURING LOW-POWER TESTING.

AS A RESIDENT OF NEW HAMPSHIRE WITHIN THE 10 MILE EMERGENCY PROTECTION ZONE, I AM CONFIDENT THAT MY FAMILY WILL BE PROTECTED IN THE EVENT OF AN IMPENDING NATURAL DISASTER OR AN EMERGENCY REQUIRING EVACUATION, DUE TO THE EVACUATION PLAN DEVELOPED BY THE STATE OF NEW HAMPSHIRE AND SEABROOK STATION.

I STRONGLY URGE THE COMMISSION TO PROCEED RAPIDLY WITH THE FULL POWER LICENSING OF SEABROOK STATION TO PRODUCE MUCH NEEDED ELECTRICITY FOR THE NEW ENGLAND REGION. THE ECONOMIC GROWTH AND STABILITY OF THE REGION DEPEND ON ELECTRICITY. SEABROOK STATION HAS THE ONLY AVAILABLE CAPACITY TO ASSIST MEETING THE FUTURE NEEDS OF THE REGION.

SINCERELY, h

d DAVID A.

ROBINSON 51 GRANITE STREET PORTSMOUTP. Nh 03801 i

l l

[

8807010622 000622 e8R53h{jl6435 3

PDR

)jh '~

)

L-

--