Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198A835 + (17:05:43, 10 December 2024)
- ML20198A833 + (17:05:44, 10 December 2024)
- IR 05000327/1998010 + (17:05:47, 10 December 2024)
- 05000317/LER-1985-012, :on 851002,main Turbine Tripped on Erroneous Feedwater Heater 12C hi-hi Signal to Turbine Trip Circuit. Caused by Grounded Feedwater Heater Level Control Switch. Ground Control Switch Repaired + (17:05:49, 10 December 2024)
- ML20198A825 + (17:05:50, 10 December 2024)
- IR 05000387/1985025 + (17:06:06, 10 December 2024)
- ML20198A821 + (17:06:07, 10 December 2024)
- 05000364/LER-1983-026-03, /03L-0:on 830602,during Auxiliary Bldg Battery Quarterly Verification,Battery Bank 2A Declared Inoperable. Caused by Decrease in Cell Voltage on Individual Cell.Top of Cell Cleaned & Cell Charged + (17:06:08, 10 December 2024)
- IR 05000269/1985032 + (17:06:11, 10 December 2024)
- ML20198A814 + (17:06:11, 10 December 2024)
- ML20198A811 + (17:06:12, 10 December 2024)
- ML20198A809 + (17:06:13, 10 December 2024)
- ML20198A810 + (17:06:13, 10 December 2024)
- IR 05000819/2010017 + (17:06:15, 10 December 2024)
- ML20198A808 + (17:06:15, 10 December 2024)
- ML20198A801 + (17:06:16, 10 December 2024)
- ML20198A805 + (17:06:16, 10 December 2024)
- ML20198A800 + (17:06:17, 10 December 2024)
- ML20198A792 + (17:06:18, 10 December 2024)
- ML20198A791 + (17:06:19, 10 December 2024)
- ML20198A790 + (17:06:19, 10 December 2024)
- PY-CEI-NRR-0375, Forwards Proprietary Rev I,Change 2 to SS-001, Process Control Program for NUS Process Svcs Corp Radwaste ..., Incorporating 850930 Changes to Rev H.Rev I,Change 2 Incorporated Into Rev 3 to Perry Process Control Program + (17:06:20, 10 December 2024)
- ML20198A784 + (17:06:21, 10 December 2024)
- ML20198A786 + (17:06:21, 10 December 2024)
- ML20198A783 + (17:06:22, 10 December 2024)
- IR 05000269/1985034 + (17:06:24, 10 December 2024)
- ML20198A778 + (17:06:25, 10 December 2024)
- ML20198A776 + (17:06:27, 10 December 2024)
- IR 05000413/1998016 + (17:06:31, 10 December 2024)
- ML20198A773 + (17:06:31, 10 December 2024)
- ML20198A771 + (17:06:32, 10 December 2024)
- ML20198A770 + (17:06:33, 10 December 2024)
- ML20198A769 + (17:06:33, 10 December 2024)
- 05000278/LER-1985-015-02, :on 850930,combined Leakage of Type B & C Containment Leak Tests Exceeded Allowable Leak Rate Limit. Cause Will Be Investigated During Valve Insp.Valves to Be Repaired & Retested + (17:06:35, 10 December 2024)
- ML20198A762 + (17:06:44, 10 December 2024)
- ML20198A757 + (17:06:45, 10 December 2024)
- ML20198A760 + (17:06:45, 10 December 2024)
- 05000245/LER-1985-008-01, :on 850114,after Return to Full power,5% Increase in Recirculation Flow Required to Attain Same Core Thermal Power.Caused by Injection of Oxides from Condensate Booster Pump Into RCS + (17:06:47, 10 December 2024)
- ML20198A754 + (17:06:48, 10 December 2024)
- ML20198A753 + (17:06:49, 10 December 2024)
- ML20198A751 + (17:06:49, 10 December 2024)
- ML20198A749 + (17:06:50, 10 December 2024)
- 05000280/LER-1983-030-03, /03l-0:on 830707,at 100% Power,Breaker for Heat Tracing Circuit 26A on Panel 9 Found Open.Breaker Closed. Circuit Verified Operational + (17:06:52, 10 December 2024)
- ML20198A744 + (17:06:54, 10 December 2024)
- ML20198A742 + (17:06:58, 10 December 2024)
- 05000247/LER-1985-012, :on 850928,reactor Trip Occurred Due to Power Range High flux-low Level Trip Signal.Caused by Operator Failure to Block Trip Signal Although Permissive for Blocking Trip Existed.Condition Stabilized + (17:07:00, 10 December 2024)
- ML20198A735 + (17:07:01, 10 December 2024)
- ML20198A727 + (17:07:04, 10 December 2024)
- ML20198A719 + (17:07:05, 10 December 2024)
- ML20198A720 + (17:07:05, 10 December 2024)
- ML20198A718 + (17:07:06, 10 December 2024)