ML20198A769
| ML20198A769 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/24/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20198A774 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 85-1024, NUDOCS 8511060172 | |
| Download: ML20198A769 (1) | |
See also: IR 05000269/1985032
Text
b
00T 2 4 005
,
Duke Power Company
yN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Charch Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NOS. 50-269/85-32, 50-270/85-32, AND 50-287/85-32
On September 10 - October 7,1985, NRC inspected activities authorized by NRC
Operating License Nos. DPR-38, DPR-47, and DPR-55 for your Oconee facility.
At
the conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progruss.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
.x *
V!RGil L
Roger D. Walker, Director
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-269/85-32,
50-270/85-32, and 50-287/85-32
cc w/ encl:
f . S. Tuckman, Station Manager
bqc w/ encl:
tMRC Resident Inspector
W Nicolaras, NRR
Document Control Desk
a
Oj g a
State of South Carolina
RII
RI
RII
RII
RII
KStrsser:
JCBryant
C8 urger
HCD ce
VBr wnlee
10/A785
10/AS/85
ID/M/85
10/r3/85
10/n/85
s\\
1
25 08
.--