Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198B747 + (16:56:37, 10 December 2024)
- ML20198B742 + (16:56:38, 10 December 2024)
- ML20198B743 + (16:56:38, 10 December 2024)
- ML20198B737 + (16:56:41, 10 December 2024)
- ML20198B740 + (16:56:41, 10 December 2024)
- ML20198B736 + (16:56:42, 10 December 2024)
- 0CAN108504, Forwards Response to 850807 Request for Addl Info to Complete Review of SPDS Per Suppl 1 to NUREG-0737 + (16:56:43, 10 December 2024)
- BVY-98-165, TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn + (16:56:43, 10 December 2024)
- ML20198B731 + (16:56:44, 10 December 2024)
- ML20198B725 + (16:56:45, 10 December 2024)
- ML20198B727 + (16:56:45, 10 December 2024)
- ML20198B718 + (16:56:46, 10 December 2024)
- ML20198B720 + (16:56:46, 10 December 2024)
- ML20198B713 + (16:56:47, 10 December 2024)
- ML20198B712 + (16:56:48, 10 December 2024)
- ML20198B711 + (16:56:48, 10 December 2024)
- ML20198B710 + (16:56:49, 10 December 2024)
- ML20198B709 + (16:56:49, 10 December 2024)
- ML20198B704 + (16:56:50, 10 December 2024)
- U-600304, Forwards Preliminary Analysis of Clinton Power Station Hydrogen Control Sys + (16:56:51, 10 December 2024)
- ML20198B700 + (16:56:52, 10 December 2024)
- ML20198B699 + (16:56:53, 10 December 2024)
- ML20198B696 + (16:56:53, 10 December 2024)
- NOC-AE-000038, Submits 90-day Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (16:56:54, 10 December 2024)
- ML20198B693 + (16:56:55, 10 December 2024)
- ML20198B689 + (16:56:56, 10 December 2024)
- ML20198B687 + (16:56:57, 10 December 2024)
- ML20198B686 + (16:56:57, 10 December 2024)
- ML20198B682 + (16:56:59, 10 December 2024)
- PNO-I-86-038A, on 860515,operations,maint & Clerical Workers Went on Strike When Contract Expired.Mgt Personnel W/Senior Reactor Licenses Manning Control Room Watches on 12-h Shifts.Work Activities Canceled for Several Days + (16:56:59, 10 December 2024)
- ML20198B677 + (16:57:00, 10 December 2024)
- ML20198B678 + (16:57:00, 10 December 2024)
- ML20198B675 + (16:57:01, 10 December 2024)
- ML20198B673 + (16:57:02, 10 December 2024)
- ML20198B669 + (16:57:02, 10 December 2024)
- ML20198B668 + (16:57:05, 10 December 2024)
- PY-CEI-NRR-2344, Submits Updated Response to GL 94-02 Re long-term Solutions & Upgrade of Stability Interim Corrective Actions.New Regulatory Commitment Made by Util,Encl + (16:57:06, 10 December 2024)
- ML20198B665 + (16:57:07, 10 December 2024)
- ML20198B664 + (16:57:08, 10 December 2024)
- ML20198B660 + (16:57:08, 10 December 2024)
- ML20198B658 + (16:57:09, 10 December 2024)
- ML20198B652 + (16:57:10, 10 December 2024)
- ML20198B656 + (16:57:10, 10 December 2024)
- ML20198B651 + (16:57:12, 10 December 2024)
- 05000373/LER-1997-044, :on 971205,potentially Unanalyzed Condition for Automatic Depressurization Sys Accumulator Capacity,Was Identified.Caused by Lack of Design Basis Info.Determined Licensing Basis for ADS Accumulator Capacity + (16:57:14, 10 December 2024)
- ML20198B641 + (16:57:15, 10 December 2024)
- ML20198B645 + (16:57:15, 10 December 2024)
- B11846, Forwards Revised Final Draft Tech Spec 3/4.6.1.5,providing Containment Air Temp Monitor Locations,Per 851018 Request. Selection of Locations Based on Orientation Re Design Air Flow Patterns.Sketch Supporting Locations Also Encl + (16:57:16, 10 December 2024)
- ML20198B640 + (16:57:16, 10 December 2024)
- ML20198B637 + (16:57:17, 10 December 2024)
- ML20198B633 + (16:57:18, 10 December 2024)
- ML20198B631 + (16:57:20, 10 December 2024)