Forwards Revised Erps,Including ERP-C Index,Rev 8 to ERP-C-1200,rev 3 to ERP-C-1250,rev 8 to ERP-C-1300,rev 3 to ERP-C-1300-3,rev 1 to ERP-C-1300-5,rev 4 to ERP-C-1400,rev 2 ERP-C-1400-1,rev 4 to ERP-C-1900 & Rev 1 to ERP-C-1900-5
ML20198B718
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 12/11/1998
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198B722 List:
References
NUDOCS 9812210091
Download: ML20198B718 (2)


Text

,

[L

- i station support p.pertment "A

10CFR50, Appendix E

_f

+

PECO: NUCLEAR-ncoee c -

965 Chestertwook Doulevard

/

' A Unit of PECO Energy Wayne, PA 19087 5691 o

December 11,1998 m

Docket Nos. 50-277 9

50-278 50-352 50-353 License No.s. DPR-44 DPR-56 NPF-39 NPF-85 U.k3. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gubject:

Peach Bottom Atornic Power Station, Units 2 and 3 Limerick Generatin0 Station, Units 1 and 2 Emergency Responw Pmud ce 'tevisions

Dear Sir / Madam:

Enclosed are the following emergency response procedure revisions to the Common Nuclear Emergency Plan (i.e ERP Cs) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, and Limerick Generating Station (LGS), Units 1 and 2, and the Emergency Response Procedures (ERPs) for PBAPS, Un)ts 2 and 3.

O iCommon Nuclear EP Erqc14!rgs ERP-C-1200, Rev. 8 " Emergency Response Manager."

e ERP C-1250, Rev. 3, " Emergency Preparedness Coordinator / EOF."

ERP-C-1300, Rev. 8, " Emergency Operations Facility (EOF) Dose Assessment Team Leader.'

ERP-C-1300-3, Rev. 3,

  • Protective Action Recommendation Worksheet."

e ERP-C-1300-5, Rev.1," Determination of Protective Action Recommendations (PARS)."

)

ERP-C-1400, Rev.~ 4, ' Engineering Support Team."

l

~ ERP-C-1400-1, Rev. 2 " Engineering Support Team Checklist."

)

V<

'e ERP-C-1900, Rev. 4, " Recovery Phase implementation."

ERP-C-1900-5, Rev.1, " Assessment Considerations."

y,s e

b ggg J.

ERP 301, Rev. 3 - ? Dose Assessment Coordinator (DAC)..

O ERP-800, Rev. 6, " Operations Support Center Director (OSC Director)."

e.

- Emergency respMw procedure revisions are required to be submitted within thirty (30) days of their revision in accordance with 10CFR50, Appendix E, and 10CFR 50.4. However, the

' procedures identificd above, with the exception of ERP-301, Rev. 3, were not submitted within

' 30 days of their revision as required by 10CFR50, Appendix E, Section V, as a result of an 4

_ administrative oven 91.- We apologize for any inconvenience this may have caused.

9 8 1 2 2 1 0 0 9 1 9 9 1'2 1'1 -

E 4

PDR-

.y

( F;

' ADOCK 05000277 at PDR 2

1 s

iA j

e*s

~

~.

?

l December 11,1998 Page 2 i

Also enclosed are copies of computer generated report indexes identifying the latest revisions of

[

the ERP-Cs and the PBAPS ERPs.

l if you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours, b $A l Fog Garrett D. Edwards l

Director-Licensing l

t

- Enclosures

. i H. J. Miller, Administrator, Region I, USNRC (w/ enclosures,2 copies) cc:

A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ enclosures)

A. L. Burritt, USNRC Senior Resident inspector, LGS (w/o enclosures) i..

l 1