ML20198B640

From kanterella
Jump to navigation Jump to search
Notice of Pending NRC Action to Submit Info Collection Request to OMB & Solicitation of Public Comment Re 10CFR75, Safeguards on Nuclear Material - Implementation of Us/Iaea Agreement
ML20198B640
Person / Time
Issue date: 12/04/1998
From: Shelton B
NRC
To:
References
OMB-3150-0055, OMB-3150-55, NUDOCS 9812210049
Download: ML20198B640 (4)


Text

. . . . .- . - _ _

l tr-k f l

l 19ll

[7590-01-P]

U. S. NUCLEAR REGUt.ATORY COMMISSION Agency Information Collection Activities: Proposed Collect o Co mekr@20est. 1 N

TC to P1:3g AGENCY: U. S. Nuclear Regulatory Commission (NRC)

ACTION: Notice of pending NRC action to submit an information collection request to OMB and solicitation of public comment.

1 1

SUMMARY

The NRC is preparing a submittal to OMB for review and continued approval of information collection requirements currently approved by OMB under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35).

Information pertaining to the requirement to be submitted:

1. The title of the information collection:

10 CFR Part 75 - Safeguards on Nuclear Material - Implementat;on of US/lAEA Agreement j OWS

2. Current OMB approval number: 3150-0055 l
3. How often the collection is required: Installation information is submitted I

upon written notification from the Commission. Changes are submitted as 9812210049 981204 Y^

PDR ORG EUSOMB y PDR c f A -7 orypeG

1

)

2 1

they occur. Nuclear Material accounting and controlinformation is submitted in accordance with specified instructions.

4. Who is required or asked to report: All persons licensed or certified by the Commission or Agreement States to possess source or special nuclear material at an installation specified on the U. S. eligible list as determined by the Secretary of State or his designee and filed with the Commission, as well as holders of construction permits and persons who intend to receive source material.
5. The number of annual respondents: One reporting and recordkeeping and five others recordkeeping only. The NRC-licensed facility selected for inspection will be reporting design information. This facility and the five i

facilities selected pursuant to a separate protocol will maintain transfer and material balance records, but reporting to the IAEA will be through the U. S. State system (Nuclear Materials Management and Safeguards System).

6. The number of hours needed annually to complete the requirement or request: 4,848 (48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> for reporting and 800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> each for 6 recordkeepers).

l

! i l

l I

l

i l

3- l

)

7. 'A5stract: 10 CFR Part 75 establishes a system of nuclear material  ;

accounting and control to implement the agreement between the United States and the International Atomic Energy Agency (IAEA). Under that agreement, NRC is required to collect the information and make it

)

available to the IAEA. Currently, the IAEA has selected and is inspecting j one NRC-licensed facility pursuant to 10 CFR 75.41.

1 1

Submit comments that address the following by (insert date 60 days after publication in the .

Federal Reaister):

1. Is the proposed collection of information necessary for the proper performance of the functions of the NRC, including whether the information will have practical utility? 4
2. Is the estimate of burden accurate? ,

i

3. Is there a way to enhance the quality, utility, and clarity of the information to be collected?

1 l

4. How can the burden of the collection of information be minimized, including the use of automated collection techniques?

em n= ri r- -- - -- T i --- - -

ew-

- - - .~ - .- . . . . . - . . .-. - . . . - . .. .-

?

i

-4 l.

( A copy of the draft supporting statement may be viewed frte of charge at the NRC Public

Document Room,2120 L Street NW, (lower level), Washington, DC. OMB clearance requests t .

. are available at the NRC worldwide web site (http://www.nrc. gov /NRC/ NEWS /OMB/index.html).

The docmaent will be available on the NRC home page site for 60 days afte the signature date

! of thsinotice.

l l

1 Comments and questions about the information co!iection may be directed to the NRC  ;

Clearance Officer, Brenda Jo. Shelton, U.S. Nuclear Regulatory Commission, T-6 F33, Washington DC, 20555-0001, or by telephone at (301) 415-7233, or by intemet electronic mail l at BJS@NRC. GOV. )

i Dated at Rockville, Maryland, this day of r M ,1998. l l

i l

For the Nuclear Regulatory Commission.  !

1 0

%n o. SbsiltoW Clearance Officer l Office of information OTicer I

\

i i

! l

} l l

l l

- - . - -