Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P856 + (14:30:36, 10 December 2024)
- NRC-98-0013, Provides Committed Written Justification for Operating W/Replacement Pilot Assemblies for Duration of Operating Cycle + (14:30:37, 10 December 2024)
- ML20198P852 + (14:30:40, 10 December 2024)
- ML20198P850 + (14:30:41, 10 December 2024)
- ML20198P849 + (14:30:42, 10 December 2024)
- ML20198P847 + (14:30:42, 10 December 2024)
- ML20198P845 + (14:30:47, 10 December 2024)
- ML20198P843 + (14:30:48, 10 December 2024)
- ML20198P841 + (14:30:49, 10 December 2024)
- 05000259/LER-1986-015-01, :on 860424 & 29,during Installation of Permanent Switch Protective Covers on Reactor Protection Sys (RPS) MG Panel Switches,Rps Trip Occurred.Caused by Accidental Bump of Control Switch + (14:30:50, 10 December 2024)
- NSD-NRC-97-5412, Responds to RAI Re Comments on Sgs in Rev 3 of AP600 Certified Design Matl,Including ITAAC as Requested in + (14:30:51, 10 December 2024)
- ML20198P836 + (14:30:52, 10 December 2024)
- ML20198P835 + (14:30:53, 10 December 2024)
- NSD-NRC-97-5414, Forwards Responses to RAIs Re Comments on AP600 Normal Rhrs from Reactor Sys Branch on Rev 3 of AP600 Certified Design Matl,Including ITAAC as Requested in + (14:30:53, 10 December 2024)
- ML20198P829 + (14:30:54, 10 December 2024)
- ML20198P830 + (14:30:54, 10 December 2024)
- ML20198P826 + (14:30:55, 10 December 2024)
- ML20198P827 + (14:30:55, 10 December 2024)
- RBG-44218, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/97-13 on 970720-0830.Corrective Actions:Control Panel Lineup Immediately Performed for Division 1 Dg,Shift Briefing Form Generated & Individuals Involved Counseled + (14:30:58, 10 December 2024)
- PY-CEI-NRR-2253, Submits Supplemental Response to NOV EA-96-253.Util Accepts DOL Administrative Review Board Ruling as Further Clarification on Issue of What Does & Does Not Constitute Protected Activity Under Section 211 of ERA + (14:30:58, 10 December 2024)
- ML20198P820 + (14:31:00, 10 December 2024)
- ML20198P818 + (14:31:02, 10 December 2024)
- ML20198P816 + (14:31:03, 10 December 2024)
- ML20198P812 + (14:31:04, 10 December 2024)
- ML20198P809 + (14:31:04, 10 December 2024)
- ML20198P808 + (14:31:05, 10 December 2024)
- ML20198P806 + (14:31:06, 10 December 2024)
- ML20198P807 + (14:31:06, 10 December 2024)
- ML20198P803 + (14:31:19, 10 December 2024)
- ML20198P799 + (14:31:20, 10 December 2024)
- ML20198P796 + (14:31:24, 10 December 2024)
- ML20198P794 + (14:31:24, 10 December 2024)
- ML20198P793 + (14:31:25, 10 December 2024)
- ML20198P787 + (14:31:26, 10 December 2024)
- ML20198P790 + (14:31:26, 10 December 2024)
- L-97-051, Submits Special Rept Required to Document,Prior to Resumption of Plant Operation,Results of SG Tube Insps Which Fall Into TS Category C-3.RC-E-1B SG Was pre-designated as Generator Required to Be Sampled During 971017 Insp + (14:31:28, 10 December 2024)
- ML20198P786 + (14:31:28, 10 December 2024)
- L-97-048, Confirms Completion of Requested Actions of GL 96-01. Actions Completed Prior to Completion of First Refueling Outage Following 970110 & Included Listed Instrumentation + (14:31:29, 10 December 2024)
- ML20198P781 + (14:31:30, 10 December 2024)
- ML20198P782 + (14:31:30, 10 December 2024)
- L-97-056, Submits Special Rept Documenting Results of ISI of SG Tubes, Performed During Unit 1 Twelfth Refueling Outage on 971026. Number of Tubes Inspected & Breakdown of Tubes Removed from Svc for Each SG Documented in Table 1 + (14:31:31, 10 December 2024)
- ML20198P778 + (14:31:34, 10 December 2024)
- ML20198P774 + (14:31:44, 10 December 2024)
- ML20198P772 + (14:31:48, 10 December 2024)
- ML20198P770 + (14:31:49, 10 December 2024)
- ML20198P771 + (14:31:49, 10 December 2024)
- ML20198P769 + (14:31:50, 10 December 2024)
- ML20198P768 + (14:31:50, 10 December 2024)
- ML20198P767 + (14:31:51, 10 December 2024)
- 05000263/LER-1997-014-01, :on 971219,determined That Division II ADS Inhibit Switch Was Not Tested as Required by Ts.Caused by Cognitive Error by Revision Preparer & Reviewer of Surveillance Test.Temporary Change in Surveillance Test + (14:31:53, 10 December 2024)
- 05000263/LER-1997-014, Forwards LER 97-014-00 Re Div II ADS Inhibit Switch Which Was Not Tested as Required by Ts.Commitment,Listed + (14:31:54, 10 December 2024)
- ML20198P763 + (14:31:54, 10 December 2024)