Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199B773 + (13:30:41, 10 December 2024)
- ML20199B772 + (13:30:42, 10 December 2024)
- ML20199B769 + (13:30:44, 10 December 2024)
- PNO-V-86-031, on 860609,operation Resumed After Completing First Refueling Outage.Licensee Plans to Complete post-refueling Startup Testing & Fuel Preconditioning. Facility May Be Placed in Reserve Shutdown Status + (13:30:44, 10 December 2024)
- A97063, Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event + (13:30:45, 10 December 2024)
- ML20199B767 + (13:30:45, 10 December 2024)
- B16852, Monthly Operating Rept for Oct 1997 for Millstone Nuclear Power Station,Unit 1 + (13:30:46, 10 December 2024)
- ML20199B759 + (13:30:47, 10 December 2024)
- ML20199B758 + (13:30:47, 10 December 2024)
- 05000317/LER-1986-002, :on 860322,shutdown Cooling Return motor- Operated Valve in Suction Line of LPSI Pump Inadvertently Closed.Caused by Failure in Procedures to Ensure That Test Input Signal Will Not Close Valve + (13:30:50, 10 December 2024)
- ML20199B756 + (13:30:51, 10 December 2024)
- ML20199B755 + (13:30:51, 10 December 2024)
- ML20199B751 + (13:30:52, 10 December 2024)
- ML20199B754 + (13:30:52, 10 December 2024)
- ML20199B749 + (13:30:53, 10 December 2024)
- ML20199B746 + (13:30:54, 10 December 2024)
- ML20199B748 + (13:30:54, 10 December 2024)
- ML20199B744 + (13:30:55, 10 December 2024)
- ML20199B745 + (13:30:55, 10 December 2024)
- ML20199B742 + (13:30:56, 10 December 2024)
- ML20199B741 + (13:30:57, 10 December 2024)
- ML20199B740 + (13:30:57, 10 December 2024)
- ML20199B738 + (13:30:58, 10 December 2024)
- ML20199B735 + (13:30:59, 10 December 2024)
- ML20199B736 + (13:30:59, 10 December 2024)
- ML20199B734 + (13:31:00, 10 December 2024)
- BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station + (13:31:01, 10 December 2024)
- ML20199B731 + (13:31:01, 10 December 2024)
- ML20199B729 + (13:31:02, 10 December 2024)
- ML20199B728 + (13:31:03, 10 December 2024)
- ML20199B727 + (13:31:03, 10 December 2024)
- ML20199B724 + (13:31:04, 10 December 2024)
- ML20199B723 + (13:31:04, 10 December 2024)
- ML20199B718 + (13:31:05, 10 December 2024)
- ML20199B720 + (13:31:05, 10 December 2024)
- IR 05000429/2005001 + (13:31:27, 10 December 2024)
- RC-98-0009, Responds to Two Questions on Leak Detection Sys Delineated in NRC Insp Rept 50-395/97-13.Response Addresses Questions Raised During Review of Unresolved Item Associated W/Auxiliary Building Leak Detection Sys + (13:31:28, 10 December 2024)
- ML20199B713 + (13:31:29, 10 December 2024)
- ML20199B712 + (13:31:29, 10 December 2024)
- ML20199B710 + (13:31:30, 10 December 2024)
- ML20199B711 + (13:31:30, 10 December 2024)
- ML20199B709 + (13:31:31, 10 December 2024)
- ML20199B703 + (13:31:32, 10 December 2024)
- ML20199B706 + (13:31:32, 10 December 2024)
- ML20199B699 + (13:31:33, 10 December 2024)
- ML20199B701 + (13:31:33, 10 December 2024)
- RA-98-008, Forwards 1997 Annual Insp Rept for Retired Westinghouse Test Reactor.Status of Retired Facility Remains Same as Time of Last Rept + (13:31:34, 10 December 2024)
- ML20199B697 + (13:31:35, 10 December 2024)
- ML20199B694 + (13:31:35, 10 December 2024)
- ML20199B692 + (13:31:36, 10 December 2024)
- ML20199B691 + (13:31:37, 10 December 2024)
- ML20199B688 + (13:31:37, 10 December 2024)