ML20199B706

From kanterella
Jump to navigation Jump to search
Forwards Revised EPIPs Including Rev 20 to EPIP-OC-.02,rev 21 to EPIP-OC-.03,rev 18 to EPIP-OC-.06,rev 9 to EPIP-OC-.11,rev 6 to EPIP-OC-.12,rev 6 to EPIP-OC-.13 & Rev 18 to EPIP-OC-.25
ML20199B706
Person / Time
Site: Oyster Creek
Issue date: 11/10/1997
From: Roche M
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199B675 List:
References
6730-97-2260, NUDOCS 9711190058
Download: ML20199B706 (1)


Text

y.

3 4

t t{

GPU Nuclear, Inc.

1 l.g U.S. Route #9 South N

orked ue J 731 0388 Tel 609 9714000 November 10, 1997 6730-97 2260 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station l

Docket No. 50-219 Emergency Plan Implementing Procedure Revisions In accordance_witt 10 CFR 50, Appendix E, Section V, enclosed is the newly revised Index L

for the Oyster Creek Emergency Plan Implementing Procedures and the below listed procedures.

Procedure Number T_ilig Revision i

EPIP-OC.02 Direction of Emergency Response / Emergency Control 20 Center EPIP-OC.03 Emergency Notification 21 4

EPIP.OC.06 Additional Assistance and Notification 18 EPIP-OC.11 Emergency Radiological Surveys OfTsite 9

EPIP-OC.12 -

Personnel Accountability 6

EPIP-OC,13 Site Evacuation and Personnel Mustering at Remote Assembly 6

Areas I

EPIP-OC. 25.

Emergency Operations Facility (EOF) 18 If further information is required, please contact Mr. George Busch, Manager Regulatory Affairs at 609-971-4643.

Very truly yours, 0

.(

_ h*Ih5 y9 Michael B. Roche F

Vice Presic:nt & Director

}

Oyster Creek MBR\\GWB:gl _

\\

l Enclosures cc:

Administrator. Region I (w/o Attactunents)

' NRC Project Manager (w/o Attachments)

NRC Resident Inspector (w/o Attachments) qgllllllllll%l

..