Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199F498 + (12:45:21, 10 December 2024)
- ML20199F496 + (12:45:22, 10 December 2024)
- ML20199F494 + (12:45:23, 10 December 2024)
- ML20199F495 + (12:45:23, 10 December 2024)
- IR 05000266/1997021 + (12:45:24, 10 December 2024)
- ML20199F492 + (12:45:24, 10 December 2024)
- ML20199F490 + (12:45:27, 10 December 2024)
- ML20199F491 + (12:45:27, 10 December 2024)
- ML20199F488 + (12:45:28, 10 December 2024)
- ML20199F489 + (12:45:28, 10 December 2024)
- ML20199F486 + (12:45:29, 10 December 2024)
- 05000286/LER-1986-003-01, :on 860519,high Water Level in Steam Generator 34 Resulted in Turbine & Reactor Trips.Caused by Check Valve BFD-1-32 Failure to Reverse Flow Due to Loose Pivot Pins. Disk Pivot Pins Anchored Properly + (12:45:35, 10 December 2024)
- ML20199F483 + (12:45:36, 10 December 2024)
- ML20199F482 + (12:45:36, 10 December 2024)
- ML20199F480 + (12:45:37, 10 December 2024)
- ML20199F481 + (12:45:37, 10 December 2024)
- ML20199F478 + (12:45:38, 10 December 2024)
- ML20199F479 + (12:45:38, 10 December 2024)
- ML20199F477 + (12:45:39, 10 December 2024)
- ML20199F476 + (12:45:40, 10 December 2024)
- ML20199F473 + (12:45:41, 10 December 2024)
- ML20199F472 + (12:45:42, 10 December 2024)
- 05000255/LER-1986-018, :on 860519,automatic Reactor Trip Occurred Due to High Pressurizer Pressure.Caused by Power Supply Failure in Turbine electro-hydraulic Control Sys Due to Ac Line Noise.Wiring Rerouted.Power Supply Shielded + (12:45:43, 10 December 2024)
- ML20199F470 + (12:45:44, 10 December 2024)
- ML20199F468 + (12:45:45, 10 December 2024)
- IR 05000346/1997015 + (12:45:47, 10 December 2024)
- ML20199F464 + (12:45:48, 10 December 2024)
- U-600614, Forwards NFPA Code Conformance Evaluation Rept for Clinton Power Station + (12:45:48, 10 December 2024)
- ML20199F460 + (12:45:49, 10 December 2024)
- ML20199F459 + (12:45:50, 10 December 2024)
- ML20199F457 + (12:45:53, 10 December 2024)
- ML20199F456 + (12:45:53, 10 December 2024)
- ML20199F453 + (12:45:55, 10 December 2024)
- ML20199F455 + (12:45:55, 10 December 2024)
- ML20199F451 + (12:45:56, 10 December 2024)
- ML20199F452 + (12:45:56, 10 December 2024)
- 3F0198-41, Forwards Vols 1-4,Rev 24 to FSAR for Crystal River Unit 3. Rev Provided as Complete Reissue of FSAR & Pages Marked as Rev 24,dtd 980126.Summary of Changes Made in Fsar,Rev 24 Provided in Attachment A.Rept Will Be Provided by 980213 + (12:46:15, 10 December 2024)
- IR 05000354/1986026 + (12:46:15, 10 December 2024)
- W3P86-2153, Advises That No Generic Tech Spec Will Be Developed for Auxiliary Pressurizer Spray.No Safety Significance Exists & Spray Does Not Meet NRC Criteria for Sys Required for Inclusion in Tech Specs + (12:46:16, 10 December 2024)
- IR 05000285/1985029 + (12:46:42, 10 December 2024)
- ML20199F444 + (12:46:43, 10 December 2024)
- ML20199F442 + (12:46:43, 10 December 2024)
- ML20199F441 + (12:46:44, 10 December 2024)
- ML20199F440 + (12:46:45, 10 December 2024)
- ML20199F439 + (12:46:45, 10 December 2024)
- ML20199F437 + (12:46:46, 10 December 2024)
- ML20199F435 + (12:46:46, 10 December 2024)
- ML20199F434 + (12:46:47, 10 December 2024)
- ML20199F432 + (12:46:48, 10 December 2024)
- ML20199F433 + (12:46:48, 10 December 2024)
- ML20199F431 + (12:46:49, 10 December 2024)
- ML20199F429 + (12:46:50, 10 December 2024)