Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19323G452 + (00:36:21, 1 January 2025)
- ML19323G451 + (00:36:25, 1 January 2025)
- ML19323G450 + (00:36:27, 1 January 2025)
- ML19323G449 + (00:36:29, 1 January 2025)
- ML19323G448 + (00:36:33, 1 January 2025)
- ML19323G447 + (00:36:35, 1 January 2025)
- ML19323G446 + (00:36:37, 1 January 2025)
- ML19323G445 + (00:36:38, 1 January 2025)
- ML19323G444 + (00:36:41, 1 January 2025)
- ML19323G443 + (00:36:43, 1 January 2025)
- ML19323G442 + (00:36:44, 1 January 2025)
- ML19323G441 + (00:36:46, 1 January 2025)
- ML19323G440 + (00:36:47, 1 January 2025)
- ML19323G439 + (00:36:48, 1 January 2025)
- ML19323G438 + (00:36:51, 1 January 2025)
- ML19323G437 + (00:36:52, 1 January 2025)
- ML19323G435 + (00:36:54, 1 January 2025)
- ML19323G434 + (00:36:56, 1 January 2025)
- ML19323G433 + (00:36:58, 1 January 2025)
- ML19323G431 + (00:37:00, 1 January 2025)
- ML19323G430 + (00:37:02, 1 January 2025)
- ML19323G429 + (00:37:04, 1 January 2025)
- 05000333/LER-1980-043-03, /03L-0:on 800428,during Shutdown Operations, Surveillance to Satisfy Safety Requirements of Tech Spec 4.1-1 Revealed Average Power Range Monitor B Scram & Rod Block Setpoint Above Limit.Caused by Instrument Drift + (00:37:11, 1 January 2025)
- ML19323G427 + (00:37:18, 1 January 2025)
- 05000333/LER-1980-043, Forwards LER 80-043/03L-0 + (00:37:21, 1 January 2025)
- ML19323G423 + (00:37:23, 1 January 2025)
- ML19323G422 + (00:37:24, 1 January 2025)
- ML19323G421 + (00:37:26, 1 January 2025)
- 05000333/LER-1980-045-03, /03L-0:on 800429,during Normal Operation,Rod to Block Monitor a Became Inoperable When Control Rod 26-19 Was Selected Due to Inadequate Number of Low Power Range Monitor Inputs.Caused by Age.Monitor Strings Will Be Replaced + (00:37:30, 1 January 2025)
- 05000333/LER-1980-045, Forwards LER 80-045/03L-0 + (00:37:40, 1 January 2025)
- 05000333/LER-1980-044-03, /03L-0:on 800428,during Normal Operation surveillance,off-gas Timer Was Set at 15 Minutes 20-s, Exceeding Tech Spec Limits.Caused by Accidental Bumping or Loosening of Adjustment Knob Lock.Timer Was Readjusted + (00:37:44, 1 January 2025)
- ML19323G413 + (00:37:50, 1 January 2025)
- 05000333/LER-1980-044, Forwards LER 80-044/03L-0 + (00:37:53, 1 January 2025)
- ML19323G409 + (00:37:55, 1 January 2025)
- 05000333/LER-1980-047-03, /03L-0:on 800501,while Surveillance Testing to Satisfy Tech Spec 4.2-2,reactor Core Isolation Cooling High Ambient Temp switch,13-TE-898,failed to Operate.Caused by Wire Broken During Hookup of Test Equipment.Wire Repaired + (00:37:59, 1 January 2025)
- ML19323G407 + (00:38:01, 1 January 2025)
- 05000333/LER-1980-047, Forwards LER 80-047/03L-0 + (00:38:05, 1 January 2025)
- ML19323G401 + (00:38:15, 1 January 2025)
- 05000334/LER-1980-026-03, /03L-0:on 800422,pump Being Used to Start Liquid Waste Discharge Observed to Have Higher than Normal Flow. Caused by Leaking Effluent Valves.Corrective Actions Scheduled to Be Completed as Soon as Possible + (00:38:17, 1 January 2025)
- 05000333/LER-1980-042-03, /03L-0:on 800428,during Normal Shutdown Operations,Recorder Pen for source-range Monitors B & D Stuck.Caused by Normal Wear & Tear.Bearing Replaced & Recorder Recalibr.Recorder Returned to Svc within 24-h + (00:38:22, 1 January 2025)
- 05000334/LER-1980-026, Forwards LER 80-026/03L-0 + (00:38:25, 1 January 2025)
- 05000333/LER-1980-042, Forwards LER 80-042/03L-0 + (00:38:30, 1 January 2025)
- ML19323G394 + (00:38:45, 1 January 2025)
- ML19323G393 + (00:38:47, 1 January 2025)
- ML19323G391 + (00:38:50, 1 January 2025)
- ML19323G390 + (00:38:51, 1 January 2025)
- ML19323G389 + (00:38:52, 1 January 2025)
- ML19323G388 + (00:38:53, 1 January 2025)
- ML19323G387 + (00:38:57, 1 January 2025)
- ML19323G386 + (00:39:00, 1 January 2025)
- DD-80-17, Order Granting Extension Until 800602 for Commission to Elect Whether to Review Directors decision,DD-80-17,taken Under 10CFR2.206 + (00:39:02, 1 January 2025)