,1jsa 4cg[0, UNITED STATES
+y'.,
j NUCLEAR REGULATORY COMMISSION t
VVASHINGTO**. D. C. 20555 o
%,".... [
' MAY 2 21980 Docket No.: 50-367 Northern Indiana Public Service Company ATTN:
Mr. H. P. Lyle Vice President - Electric Production and Engineering 5265 Hohman Avenue Hamond, Indiana 46325
Dear Mr. Lyle:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGAR0!NG'THE PROPOSED BAILLY PILE FOUNDATION In var continuing review of your March 1978 proposal to install shorter piles for the Bailly foundation, we have identified a need for additional infonnation. This question is enclosed and relates to your calculations of pile group uplift capacity.
The nuntering system follows that initiated in our letter of May 16, 1980.
Since we used a similar system in our request for additional information in our letter dated June 22, 1978, respond in a manner which clearly identifies whether the 1978 series or the 1980 series is being addressed.
If you have any questions regarding this matter, contact the Project Manager for Bailly, M. D. Lynch, at (301) 492-8413.
Since ly B.,. Youngbl od, Chief Licensing Branch No. 1 Division of Licensing
Enclosure:
As stated cc: See next page 6
6 8006020
~
MAY 2 21330 Northern Indiana Public Service Ccmpar.
CCs*
Meredith Hemphill, Jr. Esq.
Assistant General Counsel Bethlehem Steel Corporation 701 East Third Street Bethlehem, Pennsylvania 18016 William H. Eichhorn. Esq.
Eichhorn, Morrow & Eichhcrn 5243 Hohman Avenue Harmond, Indiana 46320 Edward W. Osann, Jr., Esq.
Wolfe, Hubbard, Leydid, Voit & Osann, Ltd.
tt Suite 4600 One IBM Plaza Chicago, Illinois 60611 Robert J. Vollen Esq.
109 North Dearborn Street Chicago, Illinois 60602 Diane B. Cohn, Esq.
y Suite 700 Af 2000 P Street, N.W.
Ji'-
Washington, D. C. 20036
)
Y Richard L. Robbins, Esq.
Lake Michigan Federation 53 West Jackson Boulevard Chicago, Illinois 60604 Kathleen H. Shea, Esq.
Lowenstein, Newman, Reis, Axelrad & Toll 1025 Connecticut Avenue, N. W.
,$g*'
Washington, D. C. 20036 Dean Hansell, Esq.
Russell Eggert, Esq.
Office of the Attorney General State of Illinois 188 W. Randolph Street Chicago, Illinois 60601 J. R. Whitehouse, Superintendent
,c; National Park Service "i
Route 2. Box 139A Chesterton, Indiana 46304
.~
-l
_ i
V'Y 2 2 1360 Northern Indiana Public Service Cocpany ces (centinued)
Robert L. Graham, Esq.
One IBM Plaza 44th Floor Chicago, Illinois 60611 George and Anna Grabowski 7413 W.136th Lane Cedar Lake, Indiana 46303 Dr. George Schultz 110 Califor,a Street Michigan City, Indiana 46360 John Van Vranken, Esq., Chief Northern Region Environmental Control Division 188 West Randolph Street Chicago, Illinois 60601 Clifford Mezo, Acting President local 1010 United Steelworkers of America 3703 Euclid Avenue East Chicago, Indiana 46312 Stephen Laudig, Esq.
445 N. Pennsylvania Street Indianapolis, Indiana 46204 Mr. Paul A. Barrett U. S. Nuclear Regulatory Commission, Region III
~
Office of Inspection and Enforcement r
799 Roosevelt Road y?u.;,. Glen Ellyn, Illinois 60137 p,7 -
fl.5~.
Y O
e
- i
- \\
1 6
i g
m-g-
g
o M av ' a IMO REQUEST FOR ADDITIONAL INFORMATION BAILLY GENERATING STATION, NUCLEAR-1 e
1 i
- l l
a v av a ' 193()
362.30 We transmitted a question (Iter 362.1) to you in cur letter dated June 22, 1978, requesting additional information regarding pile group capacity; you responded to this matter in your letter dated July 14, 1978. In reviewing Figure 362.1-4 of your July 1978 response, we note that you assume a soil density of 130 pounds per cubic foot in your analysis of the capability of a pile group to resist uplift. This soil density appears to be a total soil unit weight. However, when construction dewatering operations are stopped, the ground water level will rise above the tops of the piles, thereby totally submerging the soil resisting uplif t.
Accordingly, provide justification for using the total unit weight of the soil rather than the submerged unit weight when calculating the weight of soil resisting uplift. Provide the mininom factors of safety for pile group uplif t using the submerged unit weight of soil. Revise your July 1978 response to our Item 362.1 of 1978 as required. State the minimum length of pile embedment to achieve the required factors of safety for pile group uplif t.
Indicate how your pile placement criteria will achieve this minimum pile embedment length.
4 f '),.
W O