Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000338/LER-1980-047, Forwards LER 80-047/01T-0 + (00:07:24, 1 January 2025)
- 05000309/LER-1980-012-03, /03L-0:on 800506,during Monthly Surveillance Test Procedure,Low Power Safety Injection Loop 3 Header Stop Valve Failed to Operate as Required.Caused by Broken Weld in Coupling of Operating Extension Shaft + (00:07:27, 1 January 2025)
- ML19323G985 + (00:07:30, 1 January 2025)
- 05000324/LER-1980-043-03, /03L-0:on 800507,during Current Refueling Outage, Standby Gas Treatment Operability Test Was Not Performed by Required 800425 Date.Caused by Administrative Oversight. Satisfactorily Performed on 800507 + (00:07:34, 1 January 2025)
- 05000309/LER-1980-012, Forwards LER 80-012/03L-0 + (00:07:37, 1 January 2025)
- ML19323G981 + (00:07:39, 1 January 2025)
- 05000324/LER-1980-043, Forwards LER 80-043/03L-0 + (00:07:41, 1 January 2025)
- 05000317/LER-1980-027-01, /01T-0:on 800520,following Routine Tube Cleaning on Saltwater Side of Svc Water Heat Exchanger 12,low Pressure Alarms Were Received on Subsys 11 & 12.Caused by Failed Tube in Exchanger 11 Instrument Compressor Cooler + (00:07:45, 1 January 2025)
- ML19323G977 + (00:07:47, 1 January 2025)
- 05000317/LER-1980-027, Forwards LER 80-027/01T-0 + (00:07:51, 1 January 2025)
- ML19323G973 + (00:07:53, 1 January 2025)
- ML19323G972 + (00:07:54, 1 January 2025)
- ML19323G971 + (00:07:55, 1 January 2025)
- ML19323G970 + (00:07:57, 1 January 2025)
- 05000321/LER-1980-047-03, /03L-0:on 800404,during Review of Normal Surveillance Testing Data Sheets,Rhr Pumps a & C Flow Rate Did Not Meet Tech Spec Requirements.Cause Not Stated.Rhr Pump Surveillance Procedure Will Be Revised + (00:08:01, 1 January 2025)
- ML19323G967 + (00:08:05, 1 January 2025)
- ML19323G966 + (00:08:07, 1 January 2025)
- 05000321/LER-1980-047, Forwards LER 80-047/03L-0 + (00:08:12, 1 January 2025)
- ML19323G962 + (00:08:16, 1 January 2025)
- ML19323G961 + (00:08:18, 1 January 2025)
- ML19323G959 + (00:08:20, 1 January 2025)
- ML19323G958 + (00:08:23, 1 January 2025)
- ML19323G957 + (00:08:25, 1 January 2025)
- ML19323G956 + (00:08:27, 1 January 2025)
- ML19323G954 + (00:08:39, 1 January 2025)
- ML19323G953 + (00:08:41, 1 January 2025)
- ML19323G952 + (00:08:42, 1 January 2025)
- ML19323G951 + (00:08:45, 1 January 2025)
- ML19323G946 + (00:08:48, 1 January 2025)
- ML19323G945 + (00:08:50, 1 January 2025)
- ML19323G944 + (00:08:55, 1 January 2025)
- ML19323G943 + (00:08:59, 1 January 2025)
- ML19323G942 + (00:09:02, 1 January 2025)
- ML19323G941 + (00:09:03, 1 January 2025)
- A00979, Responds to NRC 800507 Request for Info Re Undervoltage Protection.First Level 2 Undervoltage Scheme Electrically Connected to 345kV Side of Preferred Offsite Supply.Relays Physically Located in Control Room + (00:09:19, 1 January 2025)
- ML19323G939 + (00:09:26, 1 January 2025)
- ML19323G938 + (00:09:29, 1 January 2025)
- ML19323G937 + (00:09:30, 1 January 2025)
- ML19323G936 + (00:09:32, 1 January 2025)
- ML19323G935 + (00:09:36, 1 January 2025)
- ML19323G934 + (00:09:40, 1 January 2025)
- ML19323G933 + (00:09:42, 1 January 2025)
- ML19323G931 + (00:09:45, 1 January 2025)
- ML19323G930 + (00:09:47, 1 January 2025)
- ML19323G929 + (00:09:48, 1 January 2025)
- ML19323G928 + (00:10:00, 1 January 2025)
- ML19323G926 + (00:10:02, 1 January 2025)
- ML19323G925 + (00:10:17, 1 January 2025)
- ML19323G924 + (00:10:20, 1 January 2025)
- ML19323G922 + (00:10:27, 1 January 2025)
- ML19323G921 + (00:10:30, 1 January 2025)