O OPERATING DATA REPORT DOCKET NO. 050-298 DATE June 2. 1980 COMPLETED BY P-T.. Rn111nger TELEPHONE 402-825-3811 OPERATING STATUS Note; I. Unit Name:
Cooper Nuclear Station May 1980
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2381
- 4. Nameplate Rating (Gross MWe):
836
- 5. Design Electrical Rating (Net MWe): 778 787
- 6. Maximum Dependable Capacity (Gross MWe):
764
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
None
- 10. Reasons For Restrictions. If Any:
None This Month Yr..to.Date Cumulative i
.0 3,647.0 n,888.0 j
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 0.0 1,447.0 42,684.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 O.0
- 14. Hours Generator On.Line 0.0 1.437.7 41.913.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 0.0 3,077,520.0 79.260,246.0
- 17. Gross Electrical Energy Generated (MWH) 0n 1 n1R 1o9 0 29 997 OA'4 0
- 18. Net Electrical EnerEy Generated IMWH) 0.0 981.128.0 24.639.405.0
- 19. Unit Service Factor 0.0 39.4 80.8
- 20. Unit Availability Factor 0.0 39.4 80.8
- 21. Unit Capacity Factor iUsing MDC Net) 0.0 35.2 62.2
- 22. Unit Capacity Factor (Using DER Net) 0.0 3A.6 61.0
- 23. Unit Forced Outage Rate 0.0 1.7 4.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eachi:
Refueling and Maintenance Outage started March 1, 1980 and is scheduled to end June 3, 1980
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
June 3, 1980
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 80060903 U $
r AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
-050-298 UNIT Cooper Nuclear Station DATE June 2.
1980 COMPLETED BY P. L. Ballinger 402-825-3811 TELEPHONE MON'DI May 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
37 0
2 18 3
19 4
20 1
l 5
21 6
n 7
3 8
24 9
25 10 26 I
l II 27 l
l 2
l'
,8 13 29 14 30 I
~
15 31 16 INSTRUCIlONS On this format. list the s.verage daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
DOCKET NO.
050-298 UNIT SHU1 DOWNS AND POWER REI)UCTIONS UNIT NAME Cooper Nuclear Station DA1E June 2.
1980 COMPLETED BY P_
- i. Rnl1Inong REPORT MON 111 May 1980 TELEPilONE 402-825-3811 e.
e c
.$ E 3
j E5 Licensee h
je.
Cause & Conective No.
Date Q
3g j
js&
Event gg o1 Action to
~ 5; y Repost #
mV gu Prevent Recurrence
$E E
H
=
u Q
80-5 800301 S
743*
C 2
NA NA NA 1980 Refueling and Maintenance Outage i
l
- The cliange to day Light savings time was no : subtracted f' om the April duration and is thus subtracted from May to correct this er co r.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instinctions S: Scheduled A Equipment Failure (Explain)
I-Manual for Pieparaiion of Data H-Maintenance of Test 2 Manual Scrain.
Entry Sheets for Licensee C Refueling 3 Autonnatic Scram.
Esent Report ILER) File INilRI.G-D Regulatory Restriction 4-Other (E xplain) 0161)
E-Operator Training & License Exainination F Administrative 5
G-Operational linos (Explain)
Exhibit I - Same Source 19/77)
Il-Other (Explain)
O
~
1 COOPER NUCLEAR STATION OPERATION NARRATIVE May 1980 The reactor was shutdown on March 1,1980 for the 1980 Refueling and Maintenance Outage. A startup date of June 3,.1.90 is scheduled for the start of Cycle 6.