O OPERATING DATA REPORT DOCKET NO. 050-298 DATE June 2. 1980 COMPLETED BY P-T.. Rn111nger TELEPHONE 402-825-3811 OPERATING STATUS Note; I. Unit Name:

Cooper Nuclear Station May 1980

2. Reporting Period:
3. Licensed Thermal Power (MWt):

2381

4. Nameplate Rating (Gross MWe):

836

5. Design Electrical Rating (Net MWe): 778 787
6. Maximum Dependable Capacity (Gross MWe):

764

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):

None

10. Reasons For Restrictions. If Any:

None This Month Yr..to.Date Cumulative i

.0 3,647.0 n,888.0 j

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 0.0 1,447.0 42,684.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 O.0
14. Hours Generator On.Line 0.0 1.437.7 41.913.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 0.0 3,077,520.0 79.260,246.0
17. Gross Electrical Energy Generated (MWH) 0n 1 n1R 1o9 0 29 997 OA'4 0
18. Net Electrical EnerEy Generated IMWH) 0.0 981.128.0 24.639.405.0
19. Unit Service Factor 0.0 39.4 80.8
20. Unit Availability Factor 0.0 39.4 80.8
21. Unit Capacity Factor iUsing MDC Net) 0.0 35.2 62.2
22. Unit Capacity Factor (Using DER Net) 0.0 3A.6 61.0
23. Unit Forced Outage Rate 0.0 1.7 4.5
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eachi:

Refueling and Maintenance Outage started March 1, 1980 and is scheduled to end June 3, 1980

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

June 3, 1980

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 80060903 U $

r AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

-050-298 UNIT Cooper Nuclear Station DATE June 2.

1980 COMPLETED BY P. L. Ballinger 402-825-3811 TELEPHONE MON'DI May 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

37 0

2 18 3

19 4

20 1

l 5

21 6

n 7

3 8

24 9

25 10 26 I

l II 27 l

l 2

l'

,8 13 29 14 30 I

~

15 31 16 INSTRUCIlONS On this format. list the s.verage daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

DOCKET NO.

050-298 UNIT SHU1 DOWNS AND POWER REI)UCTIONS UNIT NAME Cooper Nuclear Station DA1E June 2.

1980 COMPLETED BY P_

i. Rnl1Inong REPORT MON 111 May 1980 TELEPilONE 402-825-3811 e.

e c

.$ E 3

j E5 Licensee h

je.

Cause & Conective No.

Date Q

3g j

js&

Event gg o1 Action to

~ 5; y Repost #

mV gu Prevent Recurrence

$E E

H

=

u Q

80-5 800301 S

743*

C 2

NA NA NA 1980 Refueling and Maintenance Outage i

l

  • The cliange to day Light savings time was no : subtracted f' om the April duration and is thus subtracted from May to correct this er co r.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instinctions S: Scheduled A Equipment Failure (Explain)

I-Manual for Pieparaiion of Data H-Maintenance of Test 2 Manual Scrain.

Entry Sheets for Licensee C Refueling 3 Autonnatic Scram.

Esent Report ILER) File INilRI.G-D Regulatory Restriction 4-Other (E xplain) 0161)

E-Operator Training & License Exainination F Administrative 5

G-Operational linos (Explain)

Exhibit I - Same Source 19/77)

Il-Other (Explain)

O

~

1 COOPER NUCLEAR STATION OPERATION NARRATIVE May 1980 The reactor was shutdown on March 1,1980 for the 1980 Refueling and Maintenance Outage. A startup date of June 3,.1.90 is scheduled for the start of Cycle 6.