50-498/80-07 50-499/80-07 Appendix A NOTICE OF VIOLATION Based on the results of the NRC inspection conducted on April 8-11, 1980, it appears that certain of your activities were not conducted in full compliance with the conditions of your NRC Construction Permit CPPR-129 as indicated below:
Failure to Follow Procedure for Storage of Material 10 CFR Part 50, Appendix B, Criterion V, requires that activities affecting quality shall be performed in accordance with instructions, procedures or drawings.
Brown & Root Quality Construction Procedure GCP-35, " Storage and Maintenance,"
Revision 3, requires that protective covers and closures be intact.
Contrary to the above:
During inspection of equipment storage on April 8, 1980, the IE inspector observed that a protective cover had been removed from a weld preparation on pipe penetration M-39 in the Unit 2 Reactor Containment Building (RCB) and a steel book, used to support scaffolding on the exterior of the RCB, was in direct contact with the weld preparation.
This is an infraction.
\\