Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248A364 + (23:54:00, 1 December 2024)
- 05000352/LER-1989-026, :on 890419,four Emergency Diesel Generators Inoperable.Caused by Deficiencies in Physical Separation Between Class 1E Internal Wires & Internal Nonclass 1E Wires.Wrapping of Appropriate Wires Initiated + (23:54:02, 1 December 2024)
- ML20248A360 + (23:54:03, 1 December 2024)
- ML20248A358 + (23:54:04, 1 December 2024)
- ML20248A357 + (23:54:04, 1 December 2024)
- ML20248A353 + (23:54:05, 1 December 2024)
- ML20248A350 + (23:54:06, 1 December 2024)
- ML20248A352 + (23:54:06, 1 December 2024)
- IR 05000313/1989018 + (23:54:07, 1 December 2024)
- ML20248A347 + (23:54:08, 1 December 2024)
- ML20248A344 + (23:54:09, 1 December 2024)
- ML20248A345 + (23:54:09, 1 December 2024)
- U-603003, Forwards Signed Consent to Confirmatory Order Modifying CPS License by Incorporating Changes to Proposed Consent to Confirmatory Order Included in NRC + (23:54:10, 1 December 2024)
- ML20248A341 + (23:54:11, 1 December 2024)
- ML20248A340 + (23:54:12, 1 December 2024)
- ML20248A335 + (23:54:13, 1 December 2024)
- ML20248A336 + (23:54:13, 1 December 2024)
- 05000368/LER-1988-023-01, :on 880219,inoperability of Mechanical Snubber on Main Steam Supply Piping Discovered.Caused by High Dynamic Loading of Piping & Snubber Due to Water Entrainment in Steam Piping.Snubber Replaced + (23:54:15, 1 December 2024)
- ML20248A333 + (23:54:16, 1 December 2024)
- ML20248A325 + (23:54:17, 1 December 2024)
- ML20248A329 + (23:54:17, 1 December 2024)
- ML20248A323 + (23:54:18, 1 December 2024)
- ML20248A322 + (23:54:19, 1 December 2024)
- ML20248A321 + (23:54:20, 1 December 2024)
- ML20248A319 + (23:54:21, 1 December 2024)
- 05000313/LER-1988-027, :on 880422,containment Isolation Valve Inoperable.Caused by Lack of Documentation of Design Basis Info for Sys Piping Temp & Pressures in Original Plant Design.Design Change Package Developed + (23:54:23, 1 December 2024)
- TAC:M99504 + (23:54:24, 1 December 2024)
- ML20248A316 + (23:54:26, 1 December 2024)
- ML20248A317 + (23:54:26, 1 December 2024)
- IR 05000458/1989033 + (23:54:29, 1 December 2024)
- ML20248A314 + (23:54:30, 1 December 2024)
- JPN-89-033, Forwards Application for Amend to License DPR-59,revising Tech Spec Table 3.7-1, Process Pipeline Penetrating Primary Containment, to Accurately Reflect as-built Condition of Plant & Promote Consistency W/Nrc STS + (23:54:31, 1 December 2024)
- ML20248A307 + (23:54:31, 1 December 2024)
- ML20248A304 + (23:54:32, 1 December 2024)
- ML20248A305 + (23:54:32, 1 December 2024)
- ML20248A300 + (23:54:33, 1 December 2024)
- ML20248A302 + (23:54:33, 1 December 2024)
- ML20248A298 + (23:54:34, 1 December 2024)
- ML20248A296 + (23:54:34, 1 December 2024)
- ML20248A294 + (23:54:35, 1 December 2024)
- ML20248A291 + (23:54:36, 1 December 2024)
- IR 05000267/1989007 + (23:54:38, 1 December 2024)
- ML20248A286 + (23:54:39, 1 December 2024)
- ML20248A285 + (23:54:40, 1 December 2024)
- IR 05000317/1987099 + (23:54:54, 1 December 2024)
- ML20248A279 + (23:54:54, 1 December 2024)
- 05000334/LER-1998-027, Informs That Dl Intends to Issue Special Rept Providing Overview of TS Compliance Issues & Corrective Actions Taken. Based on Dl Intent to Provide Special Rept,Supplemental Rept to LER 98-027-00 Will Not Be Issued + (23:54:55, 1 December 2024)
- ML20248A274 + (23:54:56, 1 December 2024)
- ML20248A273 + (23:54:57, 1 December 2024)
- ML20248A266 + (23:54:58, 1 December 2024)
- ML20248A265 + (23:54:58, 1 December 2024)