Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1992-61, Loss of High Head Safety Injection +
- ML18058B205 +
- ML18058B202 +
- ML20116M166 +
- ML20116L465 +
- ML20116L326 +
- ML20116K615 +
- ML20116J882 +
- ML20116J709 +
- ML20116J695 +
- ML20116H707 +
- ML20116H689 +
- ML20116H083 +
- ML20116H078 +
- ML20116H066 +
- ML20116G620 +
- ML20128D552 +
- ML20128C207 +
- ML20128A541 +
- ML20127N490 +
- ML20127N488 +
- ML20127M142 +
- ML20127M145 +
- ML20127G354 +
- ML20127G353 +
- ML20127F658 +
- ML20127F655 +
- ML20127A421 +
- ML20126F837 +
- ML20126F555 +
- ML20126E561 +
- ML20125D226 +
- ML20125D187 +
- ML20125D096 +
- ML20140F575 +
- TAC:M81384 +
- 3F1192-07, Requests NRC Approval of Temporary non-code Repair to Moderate Energy Portions of Nuclear closed-cycle Cooling Sys.Util Separately Filed Response to GL 90-05 Which Addresses Handling of Repairs.Response Awaited +
- PNO-V-92-034, on 921106,M Debblie Notified Region V Ofc of Overexposure to Radiographer from 50 Ci Co-60 Source. Radiographer Came in Physical Contact W/Source & Undergone Preliminary Medical Exams.State of or Investigating Event +
- TXX-9252, Forwards Advance Draft FSAR to Facilitate NRC Review of Cooling Pond Hydrothermal Analysis in Support of Licensing Unit 2.Encl Matl Will Be Incorporated in FSAR Amend 87 Currently Scheduled for Dec 1992 +
- ML20126E168 +
- ML20056D055 +
- ML20265C878 +
- ML20217R060 +
- ML20128A393 +
- 05000254/LER-1992-027-01, :on 921009,insp of HPCI Room Cooler Determined That Room Cooler Fouled Beyond Design Margin Due to Accumulation of Sediment & Debris.Working Group Directed to Clean Room Cooler +
- 05000282/LER-1992-014-02, :on 921007,CR Responded to Fire Alarm in Area of MSSV Header for Number 12 Sg.Caused by Personnel Error. All Valves Adjusted to Nominal Setpoint +
- 05000458/LER-1992-022, :on 921007,informed That Div 1 Train in CR Declared Inoperable,Due to Failure of Charcoal to Meet Acceptance Criteria.Charcoal in Div 1 Train Replaced & Satisfactorily Tested +
- 05000302/LER-1992-021, :on 921004,discovered That Fluid Level in Reactor Coolant Pump Lubricating Oil Collection Tanks at 14%.Caused by Personnel Error.Plant Mod to Repair Feedwater Leak & Control Cooling Water Temp Underway +
- 05000440/LER-1992-019, :on 921009,valve Positioning Error Resulted in Inoperability of Both SLCS Trains.Caused by Personnel Error. Operator Responsible for Valve Positioning Error Counseled Re Event +
- 05000254/LER-1992-028-01, :on 921016,during Review of SBGT TS Rev, Discovered That on Loss of Instrument Air CR Dose Would Exceed GDC-19 Limit.Caused by Inadequate Design.Several Operating Procedures Temporarily Revised +