ML18058B205

From kanterella
Jump to navigation Jump to search

Withdraws Commitments Re Mods & Flushing Programs Associated W/Service Water,Component Cooling Water & Auxiliary Feedwater Sys,Per 900129 Response to GL 89-13
ML18058B205
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/06/1992
From: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-13, TAC-M74037, NUDOCS 9211120271
Download: ML18058B205 (6)


Text

,

consumers Power POW ERi Nii MICHlliAN'S PROGRESS Palisades Nuclear Plant:

27780 Blue Star Memorial Highway, Covert, Ml 49043 11/06/92 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET 50-255 - LICENSE DPR PALISADES PLANT - RESPONSE TO GENERIC LETTER 89 "SERVICE WATER SYSTEM PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT"-

CHANGE IN COMMITMENTS (TAC No.M74037)

In Consumer Power Company's January 29, 1990 response to Generic Letter 89-13, commitments were made regarding modifications and flushing programs associated with the service water, component cooling water and auxiliary feedwater systems.

Inspections performed on the affected systems after these commitments were made showed no indications of silting or biofouling.

Based on the results of the inspections, a decision was made to not perform the modifications.

However, as a result of the zebra mussel infestation in Lake Michigan, we decided to re-evaluate the need for these modifications, and by letter dated December 20, 1991, we extended the completion dates of these commitments to the end of the 1993 Refueling Outage.

Based on our continued evaluation of the service water, component cooling water and auxiliary feedwater systems we have determined that modifications to these systems are not necessary and, therefore, withdraw our commitments to perform the modifications to these systems.

Background

As a result of Generic Letter 89-13, "Service Water System Problems Affecting Safety-Related Equipment," we were required to review the Service Water System at Palisades with respect to NRC identified concerns.

At the time of our response to the generic letter in January 1990, we identified various programmatic enhancements resulting from our review and also identified various commitments, including modifications to the service water system, component cooling water system and the auxiliary feedwater system which are described below.

A schedule for completion of the commitments, provided in our response, indicated that the proposed modifications would be completed in the 1992 Refueling Outage.

However, our response did not consider changes that may be necessary due to the presence of zebra mussels because, at the time of our response, zebra mussels had not infested Lake Michigan.

9211120271 921106 PDR ADOCK 05000255 P

PDR A CMS ENERGY COMPANY

Description of Commitments Consumers Power Company's January 29, 1990 response to Generic Letter 89-13 stated the following:

Service Water System and the Component Cooling Water System

1. A modification will be made to the piping to permit flushing the lines periodically without performing Special Test T-282 which requires approval from the State's Department of Natural Resources to allow chemically treated component cooling water to be discharged to the lake.

The modification will be completed by the end of the 1992 Refueling Outage.

2.

The line will be periodically flushed thereafter.

Auxiliary Feedwater System and the Service Water

1. A modification will be made to the piping to permit periodic flushing without performing Special Test T-190.

The modification will be completed by the end of the 1992 Refueling Outage.

2.

The line will be periodically flushed thereafter.

Discussion 2

During the 1990 Refueling Outage inspections were performed on safety related heat exchangers to assess the degree of silt deposition and biofouling.

The results of these inspections showed that there were no signs of silting or biofouling. A portion of the cross-tie piping between the Service Water System and the Component Cooling Water System was inspected for wall thinning which could potentially be caused by microbiologically induced corrosion (MIC) due to silting. The piping inspection showed no areas of wall thinning.

In addition to the inspection described above, a flow test of the Service Water System backup supply to the engineering safeguards pumps was also performed in the 1990 Refueling Outage.

The results of this test are documented in the test report for Special Test T-282, "Initiate Back-up Service Water Flow to the Engineered Safeguards Pump Seals." The test results showed that the safeguards pumps (ie. containment spray pumps, low pressure safety injection pumps and high pressure safety injection pumps) would have an adequate supply of cooling water.

The T-282 Test Report evaluated the adequacy of the supply of cooling water and determined that the available flow was satisfactory. At the conclusion of Special Test T-282, in December 1990, the cross-tie piping was isolated and remains in wet lay-up.

The wet lay-up chemistry was consistent with the service water system chemistry at the time of isolation.

3 The cross-tie p1p1ng between the Auxiliary Feedwater System and the Service Water System was also an area of concern, however, this short, vertical, small bore (i.e., 18 inches long, 2 inch ID) connection was not inspected.

We believe that since the heat exchangers inspected during the 1990 Refueling Outage showed no signs of silting or biofouling, then the cross-tie piping should not experience silting or biofouling. It should be noted that this cross-tie piping is flushed quarterly with condensate water during valve verification testing performed as part of Technical Specification Surveillance Procedure Q0-21, "Auxiliary Feedwater System Valves, Inservice Test Procedure." A previous flow verification test, performed in 1986, showed that the cross-tie piping supplied an adequate amount of service water flow to the auxiliary feedwater system.

Zebra mussels were first discovered at Palisades in December 1990.

At the time, only adult zebra mussels were present and these were extremely few in number.

The presence of the adult zebra mussel, as opposed to the veliager (larval) stage, did not cause a significant concern at the plant. Therefore, as a result of the inspections performed in the 1990 Refueling Outage and because the zebra mussels did not appear to present a biofouling problem, further work on the proposed modifications (described previously) was discontinued.

However, during the summer of 1991, the zebra mussel infestation in Lake Michigan escalated and it became necessary to develop a chemical treatment program to mitigate their ingress into plant water systems.

This infestation also caused us to re-evaluate our previous conclusion that the proposed modifications involving the service water system would not be necessary.

However, insufficient time was left prior to the beginning of the 1992 Refueling Outage to properly prepare for the modifications.

Based on the results of the inspections and tests performed in the 1990 Refueling Outage, we believed that the modification and periodic flushing of the cross-tie piping between the Auxiliary Feedwater System and the Service Water System and between the Component Cooling Water System and the Service Water System, previously committed to, was not necessary.

However, because of the zebra mussel infestation in Lake Michigan, we concluded that further review of the proposed modifications and flushing programs to assess the effectiveness of these changes to control zebra mussels was required.

Conclusion Numerous service water cooled components have been opened and inspected for zebra mussel infestation as a result of planned or emergency maintenance.

No significant population of zebra mussels have been found in any of the inspected components.

Inspections will continue to be made as components are opened for maintenance and repair.

In addition, Palisades has also been maintaining a zebra mussel control program.

This program consists of intermittent treatments using a commercial molluskcide and sodium hypochlorite.

The zebra mussel control program is expected to be continued and optimized.

In conclusion, we believe the cost of the modifications to the service water, component cooling water, and auxiliary feedwater systems, described above, exceeds the anticipated minimal improvement in system reliability, therefore, we withdraw our commitment to perform the modifications.

/~~

Gera 1 d B Slade General Manager CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades 4

LICENSING CORRESPONDENCE\\COMMITMENT TRACKING RECORD

SUMMARY

DATE: 11/06/92 DOCKET 50-255 LICENSE DPR PALISADES PLANT RESPONSE TO GENERIC LETTER 89 '.'SERVICE WATER SYSTEM PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT"- CHANGE IN COMMITMENTS (TAC No. 74037)

SUMMARY

Requests changes in certain commitments made in response to GL 89-13.

Previous NRC Letters Dated: 07/18/89 LC LC ___ _

UFI NO:

950-99*02*05*40 Originator:

CTHil lman Speci a 1 Distribution:

Concurrences:

KEOsborne PMDonnelly Previous CPCo Letters Dated:

12/20/91 LC --

Concurrences:

PJGire JLKuemin PSE LOG NA PRC MTG NA NPAD LOG NA 01/29/90 LC __

Individuals Providing Info:

WABinnington COMMITMENT TRACKING COMMITMENTS MADE:

None Related CA Document No:

CTS Commitment No:

Assigned Individual:

Commitment To Be Made Resident?

Resident Document:

COMMITMENTS CLOSED:

1. A modification will be made to the SWS/CCW piping to permit flushing the lines periodically without performing Special Test T-282 which requires approval from the State's Department of Natural Resources to allow chemically treated component cooling water to be discharged to the lake.

The modification will be completed by the end of the 1993 Refueling Outage.

CTS Commitment No:

2000064 __ _

Additional Information Needed for CTS Entry:

System Code:

Suggested Keywords:

COMMITMENT

SUMMARY

SHEET CLOSED COMMITMENTS - CONTINUED

2.

The line will be periodically flushed thereafter.

Related CA Document No:

A-NL-91-?

Assigned Individual: GJSzczypka Commitment To Be Made Resident?

CTS Commitment No: 2000081 Resident Document:

3. A modification will be made to the SWS/AFW piping to permit periodic flushing without performing Special Test T-190.

The modification will be completed by the end of the 1993 Refueling Outage Related CA Document No:

A-NL-91-?

Assigned Individual: GJSzczypka Commitment To Be Made Resident?

CTS Commitment No: 2000065 Resident Document:

4.

The line will be periodically flushed thereafter.

Related CA Document No:

A-NL-91-?

Assigned Individual: GJSzczypka Commitment To Be Made Resident?

CTS Commitment No: 2000082 Resident Document: