Forwards Suppl to 920320 Application for Amends to Licenses DPR-42 & DPR-60,reflecting Plant Mods Being Performed as Part of Sbo/Electrical Safeguards Upgrade Project
ML20116H066
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 11/06/1992
From: Parker T
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20116H068 List:
References
NUDOCS 9211120259
Download: ML20116H066 (2)


Text

___________ ___ ________ -

w s Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 Telephone (612) 330-5500 W

November 6, 1992 j

U S Nuclear Regulatory Commission 10 CFR Part 50 Attn: Document Control Desk Section 50,90 Washington. DC 20555 a PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50 282 License Not. DPR-42 50-306 DPR-60 Supplement 2 to License Amendment Request Dated March 20, 1992 Auxiliary Electrical System Channes add Cooling Water System Changes on March 20, 1992, we submitted a License Amendment Reques'.. This License Amendment Request reflects plant modifications being performed as part of NSP's Station Blackout / Electrical Safeguards Upgrade Praject for Prairie Island Nuclear Generating Plant, Units 1 and 2.

As a result of two factors, we need to change the degraded voltage setpoints from those proposed in the original License Amendment Aequest. One factor is e

that performan e problems with the new 480V voltage regulators is forcing us ,

to delay placement of the regulators into service until later. The regulators will be placed into service during the subsequent refueling outage for each of the Units. Additionally, completion of a new voltage analysia for the plant.

reveals that degraded voltage setpoints must be increased from the existing settings until the new voleage regulators are placed into service. The new voltage analysis requires verification Which has not yet been ecmpleted. We will confirm the validity of the proposed setpoints by le*.ter by December 1, 1992. Both the design of the undervoltage protection scheme and the voltage analysis are in accordance with the guidance of Branch Technical Puaition PSB-

1. The setpoint change is reflected in the attached revised page changes (TABLE TS.3.5-1 and 3.3.5-4) to the Technical Specifications, Appendix A of the Operating Licenses, for Prairie Island Nuclear Generating Plant, Ut.its 1 and 2. A separate License Amendment Request will be submitted to address the setpoint changes necessary when the new regulators are installed.

The discussion in the significant hazards analysis and safety evaluation submitted with the March 20, 1992 License Amendment Request still apply with the substitution of the new setpoint for_the original setpoints and the understanding that the voltage regulators will not be made operational without a separate License Amendment Request, t

^

9211'120259N21i06 PDR (IM i P

ADOCK 05000282 ' U' i v, PDH g

\

1 Northern States Power Company USNRC

- Page 2 November 6, 1992 In addition, our original submittal contained an error regarding surveillance testing requirements. TS.4.6.A.3 b.4 requires, during the Integrated Safety 4 Injection test, the following: " Verify that the diesel generator system trips, except those for engine cv: speed, ground fault, and generator differential current, are automatically bypassed." We had proposed no change to this specification. However, fo Uni t L, the ground fault trip is automatically 4

bypassed when a safety injection signal exists. Therefore, this difference is reflected in the attached revised page change (TS.4.6 2) to the Technica?

Specifications, Appendix i. of the Operating Licenses, for Prairie Islard Nuclear Generating Plant, Units 1 and 2. The significant hazards analysis and safety evaluation submitted with the March 20, 1992 License Amendment Request still apply.

4 Please contact us if you beve any questions concerning this License Amendment Request

- /

/Thomas h M Parker I'

Manager Nuclear Support Services c: Regi nal Administrator-Region-III, NRC i NRR Project Manager, NRC

, Senior Resident Inspector, NRC

State of Minnesota Attn
Kris Sanda.

J E Silberg Attachments:

? Affidavit Exhibit A -'Rev sed Technical Specifications Pages i