Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129B310 + (August 2, 1996)
- ML20265E500 + (August 2, 1996)
- ML20265E042 + (August 2, 1996)
- ML20265E320 + (August 2, 1996)
- ML20265E770 + (August 2, 1996)
- ML20265E022 + (August 2, 1996)
- ML20349J441 + (August 2, 1996)
- ML20211Q490 + (August 2, 1996)
- ML20134B748 + (August 2, 1996)
- ML20007B264 + (August 2, 1996)
- ML18151A657 + (August 2, 1996)
- 05000255/LER-1996-006-01, Forwards LER 96-006-01.Determined Limits of Design Analysis Had Not Been Exceeded.Info Reclassified as Voluntary Rept + (August 2, 1996)
- 05000255/LER-1996-006, On 960207,discovered Limits of Design Analysis Could Have Been Violated.Subsequent Tests & Analyses Facility Did Not Exceed Basis.Operating Procedures Have Been Revised to Treat 2530 Megawatts Limit as Absolute Limit + (August 2, 1996)
- HNP-96-129, Informs NRC That Addl Time Needed to Review & Validate Conclusions of Preliminary Evaluations Performed to Respond to 960702 RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (August 2, 1996)
- ML17312A890 + (August 2, 1996)
- IR 05000528/1996007 + (August 2, 1996)
- GO2-96-154, Responds to RAI Re Insp Rept 50-397/96-01.Plant Procedure PPM 1.3.42 Revised to Clarify Trouble Shooting Guidance & Restrictions + (August 2, 1996)
- 05000335/LER-1996-008, :on 960703,inadvertent Actuation of Safety Injection Actuation Signal & Containment Isolation Signal Occurred Due to Loss of 15 Vdc Regulated Power Supply During Maint.Design Review Performed + (August 2, 1996)
- ML17187A538 + (August 2, 1996)
- ML17292A393 + (August 2, 1996)
- ML16141B032 + (August 2, 1996)
- ML17292A384 + (August 2, 1996)
- ML17228B579 + (August 2, 1996)
- ML16342D390 + (August 2, 1996)
- ML17229B516 + (August 2, 1996)
- 05000354/LER-1995-033-08, Forwards LER 95-033-08.Suppl Documents Discovery of TS Surveillance Implementation Deficiency Identified by TS Surveillance Improvement Program + (August 2, 1996)
- ML20128Q387 + (August 3, 1996)
- ML20128Q330 + (August 3, 1996)
- ML18102A289 + (August 3, 1996)
- ML20141H856 + (August 4, 1996)
- ML20141G320 + (August 4, 1996)
- ML20134D719 + (August 4, 1996)
- ML20134E171 + (August 4, 1996)
- IA-96-493, Informs Commission of Staff Intention to Send Ltr to DOE Re Proposal to Provide Nuclear Technology & Svcs to Democratic People'S Republic of Korea.Partially Deleted + (August 4, 1996)
- ML20266B732 + (August 4, 1996)
- ML20216F275 + (August 4, 1996)
- ML20007B934 + (August 4, 1996)
- Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves + (August 5, 1996)
- Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly + (August 5, 1996)
- ML17264A708 + (August 5, 1996)
- ML17264A577 + (August 5, 1996)
- ML17333A533 + (July 17, 1996)
- ML17333A532 + (August 5, 1996)
- ML18102A295 + (August 5, 1996)
- ML20116K010 + (August 5, 1996)
- ML20116J262 + (August 5, 1996)
- ML20116J083 + (August 5, 1996)
- ML20116H857 + (August 5, 1996)
- ML20116H651 + (August 5, 1996)
- ML20116H616 + (August 5, 1996)
- ML20116H252 + (August 5, 1996)
- ML20116H203 + (August 5, 1996)
- ML20116G638 + (August 5, 1996)
- ML20116G496 + (August 5, 1996)
- ML20116G489 + (August 5, 1996)
- ML20116G454 + (August 5, 1996)
- ML20116F503 + (August 5, 1996)
- ML20137Z587 + (August 22, 1995)