ML20116K010

From kanterella
Jump to navigation Jump to search
Forwards Proprietary & non-proprietary Revised Versions to EPIP for Plant,Units 1 & 2
ML20116K010
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/05/1996
From: Patulski S
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19311C198 List:
References
PBL-96-0161, PBL-96-161, NUDOCS 9608140187
Download: ML20116K010 (1)


Text

Wisconsin

' Electnc POWER COMPANY Point Beoch Ni clear Plant (414) 755-2321 6610 Nuclear Rd., Two Rivers. WI 54241 PBL 96-0161 August 5,1996 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington,DC 20555 Gentlemen:

DOCKET NOS. 50-266 & 50-30_1 EMERGENCY PLAN PROCEDURES POIhrr BEACH NUCLEAR PLANT. UNITS 1 & 2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual. The Procedures consist of changes uhich should be filed in your copics of the subject document in accordance with the attached instructions.

Please note that the procedures containing names and telephone numbers are stamped "NRC OhlY, NOT FOR PUBLIC DISCLOSURE." A copy of the affected procedures, with names and numbers deleted, are provided and stamped " NAMES AND TELEPIIONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents rooms.

Sincerely, p

/

Scott A. Patuiski Manager E

h

/

Enclosure g

\\

cc:

NRC Resident Inspector (w/o/c)

Incident Response Center, Region III

\\'l A

f

/

9608140187 9688 5

/

PDR ADOCK 05000266 F

PDR A whdan afHluvnsm Emm Guprnuan

/