Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1992-47, Intentional Bypassing of Automatic Actuation of Plant Protective Features +
- ML17056B922 +
- ML17329A548 +
- ML17329A547 +
- Press Release-92-099, NRC Proposes to Amend Regulations to Reduce Certain Event Reporting Requirements +
- Press Release-92-098, NRC Advisory Committee on Reactor Safeguards to Meet in Bethesda, MD, July 9-11 +
- ML18010A670 +
- ML18010A669 +
- ML18010A668 +
- ML17306A815 +
- ML18036A760 +
- ML18153D051 +
- ML20101U154 +
- ML20101S263 +
- ML20101Q890 +
- ML20101N779 +
- ML20101M967 +
- ML20101M353 +
- ML20101M350 +
- ML20101M348 +
- ML20101M326 +
- ML20101M000 +
- ML20101L913 +
- ML20101L733 +
- ML20101L299 +
- ML20101L079 +
- ML20101K548 +
- ML20101K269 +
- ML20101K210 +
- ML20101K113 +
- ML20101K105 +
- ML20099A316 +
- ML20099A273 +
- ML20118A003 +
- ML20118A002 +
- ML20128K551 +
- ML20128F823 +
- ML20128B759 +
- ML20128B732 +
- ML20127M145 +
- ML20127E172 +
- ML20126J949 +
- ML20126C739 +
- ML20196L096 +
- ML20261M975 +
- PY-CEI-NRR-1496, Application for Amend to License NPF-58,revising TSs to Increase Surveillance Test Intervals & Allowable Outage Times for Instrumentation.Ge Proprietary Documents Supporting Request Encl.Ge Documents Withheld +
- ML20266C942 +
- 05000336/LER-1992-010-02, :on 920530,discovered That Main Steam Safety Valve Setpoint Drifted.Cause Unknown.Setpoint Adjustments Made & Passed Retest +
- 05000445/LER-1992-012, :on 920603,reactor Shutdown Initiated Per Procedure.Caused by Less than Adequate Procedure Control of Oil Return Valve.Repositioned Valve,Procedure Change Stating Required Position of Valve & Controls Applied +
- 05000395/LER-1992-005, :on 920602,second Sample of Explosive Gases Was Not Taken within 24 Hour Period as Required.Caused by Personnel Error.Importance of Complying with TS Related Sampling Requirements Emphasized +