MONTHYEARML20199J8551997-11-24024 November 1997 Special Rept 2-SR-97-001:on 971025,RCS Pressure Transient Resulted in Automatic Actuation of Pressurizer Porv.Caused by Operator Misconception Over Actual Arming Setpoint of LTOP Sys.Alarm Procedures Will Be Revised ML20083R7491995-05-22022 May 1995 Special Rept 1-SR-95-002:on 950505,lightning Strike Damaged Meteorological Instrumentation at Primary & Backup Towers ML20078A3221995-01-12012 January 1995 Special Rept:On 941222,unit 1 Train a EDG Tripped.Caused by Internal Oil Leak of Trip Device Bypassed in Emergency Operating Mode.Trip Device Replaced W/New,Calibr Pressure Switch ML20058C0011993-11-18018 November 1993 Ro:On 931117,unusual Event Declared Due to Loss of All Primary & Backup Meteorological Sys Instruments.Caused by Lightning Strike Damaging back-up Tower Instruments.Local Natl Weather Svc Contacted ML20101L2991992-06-29029 June 1992 Special Rept 1-SR-92-001-00:on 920528,engine Trip Occurred Due to Apparent High Vibration at Engine Rear Vibration Sensor.Caused by Low Lube Oil Pressure.Sensor & Related Components Replaced ML20101D2201992-06-0404 June 1992 Ro:On 920603,control Room Alarms Annunicated Loss of One of Two Compressors in Train a of Control Room HVAC Sys.Caused by Low Oil Pressure in Compressor.Both Trains of Control Room HVAC Sys Restored to Svc & Declared Operable ML20092F0281992-02-13013 February 1992 Special Rept 1-SR-90-002-01:on 900221,RCS Transient Resulted in Automatic Actuation of Porv.Caused by Insufficient Letdown Flow.Repetitive Step of Differing Plant Responses Expected Eliminated ML20062F8251990-11-20020 November 1990 Ro:On 901118,control Room Alarms Annunciated Failure of Inverter Associated W/One of Four 118-volt Ac Safeguards Instrument Buses.Caused by Failed Components within Scr/Diode Assembly ML20058C5131990-10-29029 October 1990 Special Rept SR-1-90-007-00:on 900726,charging Flow Diverted Through Safety Injection Line Due to Personnel Error. Operator Counseled.Procedures Reviewed for Accuracy ML20056A1691990-07-31031 July 1990 Ro:On 900730,ESFAS Occurred Which Resulted in Initiation of Safety Injection Followed by lo-lo Steam Generator Level Reactor Trip Signal.Caused by Potential Problem W/Emergency Lighting.Actions to Prevent Recurrence Will Be Determined ML20056A0821990-07-27027 July 1990 Ro:On 900726,ESF Actuation Signal Occurred Which Resulted in Initiation of Safety Injection.Cause Indeterminate.Plant Restored to Stable Condition ML20236T9321987-10-27027 October 1987 Special Rept:On 870831,Train a Safety Injection Occurred During Performance of Bimonthly Surveillance of solid-state Protection Sys.Caused by Cognitive Personnel Error.Emergency Procedure 2BEP-0 Entered & Exited When Plant Stabilized 1997-11-24
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
. . - . _ _ - --
l MM
~~~ m 3 g Log # TXX-92304 File # 10250 71/ELEC7R/C Ref. # 10CFR50.36(c)(5)
June 29, 1992 Wlutam J. Cahill, Jr.
Grny Yke Presurno U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-445 EMERGENCY DIESEL GENERATOR START AND LOAD-RUN EVENTS DURING SURVEILLANCE TESTING SPECIAL REPORT NO. 1-SR-92-001-00 Gentlemen:
Enclosed is a 30 day special report submitted in accordance with CPSES Unit-1 Technical Specification 4.8.1.1.3, " Electrical Power Supply A. C.
Sources".
Sincerely,
'd et William J. "Cahill, Jr.
-JET /tg c- R. D. Martin, Region IV T. A. Bergman, NRR Resident Inspectors, CPSES (2) l l
i 020111
( :f monme S-
E i 1
-Enclosure _to TXX 92304 Page 1 of 3
. TU Electric Comanche Peak Steam Electric Station, Unit 1 Special Report No. 1-SR-92-001-00
-Emergency Diesel Generator Start and Load-Run Events During Surveillance Testing 1.0 Report Requirement This Special Report'is submitted in accordance with Comanche Peak Steam -Electric Station (CPSES) Unit 1 Technical Specification 4.8.1.1.3, " Electrical Power Supply A.C.
Sources". Specification 4.8.1.1.3 requires that all Diesel Generator f ailures, - valid or invalid, be reported to the commission in a Special Report pursuant to Technical Specification 6.9.2 within 30 days.
2.0 Event Description On Mey 28, 1992, at approximately 1005 CDT, Train B Emergency Diesel Generator (EDG) 1-02 (Component Tag Number CP-MEDGEE-
- 02) _ was_ manually started trom the Control Room by Operations personnel for performance of the monthly surveillance test in accordance with Technical Specification 4.8.1.1.2. Shortly after closure of the diesel generator breaker, an engine trip occurred due to apparent high vibration at the engine rear vibration sensor. Troubleshooting revealed vibration sensor failure, and the component.was replaced.
At approximately 1718, a second start was attempted to allow calibration of the newly installed- vibration sensor.
Approximately- one minute into the run, the_ engine tripped on low lube oil pressure. Subsequent troubleshooting revealed
the_cause of- the . second - trip to be a malfunction lube oil pressure switch. The pressure switch was replaced, and EDG 1-02 was prepared for a third run.
On_May 29, 1992, at approximately 0815, a-third run attempt was made to calibrate the vibration sensor and to perform the-monthly Technical Specification surveillance test on EDG 1-02.
The test was successfully completed with the EDG achieving the design rated speed, frequency, and voltage within the specified time limit, and carrying the prescribed load for_the
, required _ time. Following completion of the test run, with the EDG unloaded and disconnected from the bus,-a spurious engine shutdown-terminated the run.
Enclosure to TXX 92304 Page 2 of 3 Special Report No'. 1-SR-92-001-00 4 Emergency Diesel Generator Start and Load-Run Events During Surveillance Testing Extensive investigation revealed a shutdown rather than the occurrence of a protective trip, Emergency and normal (bypassed in emergency mode) trips were- verified not to be involved. Additional investigation performed with the control circuitry deenergized, focused on various control circuit elements. No switches 'were found out of position, and no problems were found with the related wires, terminations, or contacts. The pneumatic logic was-inspected, and no abnormal conditions such as venting or leaks were found. The engine was restarted with all trips active, and the related portion of the test procedure was repeated with additional operating and engineering personnel observing. No abnormalities were observed. Verification of the absence of personnel error was inconclusive.
3.0 Corrective Actions Failure trending will determine an appropriate replacement schedule to minimize the- potential for age-related sensor degradation. Future EDG runs will be monitored for abnormalities within the circuits functioning to shut down the engine.
1 L 4.0 Evaluation Results The- two engine- trips experienced on May 28 have been definitely attributed te spurious operation of trips that are
- -bypassed in the emergency operating mode. The conditions l- leading to those trips would not have resulted in the failure of the diesel generator unit to start, accelerate and load during a response - to an actual emergency start- signal.
Consistent with the guidance of regulatory position C.2.e of Regulatory Guide 1.108, the two trips are not considered' valid
' tests or failures.
The engine shutdown following successful completion of-the j start and' run test on May 29 did-not involve the failure of the EDG to start, accelerate, and assume the design-rated load, within and for the time _ prescribed, during an emergency or a valid test. Subsequent review .of the trip and shutdown circuits did not reveal a condition which would have resulted in t5e f ailure of the diesel generator unit to start, accelerate, and load during a' response to an actual emergency start signal. The event is not considered a valid, invalid, or nonvalid failure.
+ - ,-w- y --a s. w---vy y-+ey- %-y-iwv g vv =-P
Enclosure to TXX 92304 Page 3 of 3
. Special Report No. 1-SR-92-001-00
- Emergency Diesel Generat r Start and Load-Run Events During Surveillance Testing on day 28 and 29, EDG 1-02 was unavailable (unable to respond to a valid emergency start signal) during two separate periods totaling 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> and 8 minutes. The current test interval requires that the unit be demonstrated operable at least once per 31 days by verifying that the unit starts from ambient conditions and achieves design rated speed, frequency, and voltage within the specified time limit. The current test interval is in conformance with the schedule of Regulatory Position C.2.d of Regulatory Guide 1.108.
The lack of clarity in Regulatory Guide 1.108 has resulted in continued confusion regarding the reporting requirements related to EDG start and load-run events. Therefore, this report is being submitted although the events described are not considered reportable when evaluated against Regulatory Position C.2.e of Regulatory Guide 1.108.