Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196H624 + (June 18, 1999)
- ML20196E114 + (June 18, 1999)
- ML20196K901 + (June 18, 1999)
- PNO-III-99-032, on 990617,fire Discovered in Trailer Complex Containing Offices for Licensee Dry Cask Storage Project Staff.Fire Caused Extensive Damage to Main Portion of complex,triple-wide Trailer.Fire Extinguished + (June 18, 1999)
- IR 05000280/1999003 + (June 18, 1999)
- ML18016A992 + (June 18, 1999)
- ML18016A994 + (June 18, 1999)
- 05000315/LER-1999-014, :on 990521,determined That Boron Injection Tank Manway Bolts Were Not Included in ISI Program,Creating Missed Exam for Previous ISI Interval.Caused by Programmatic Weakness.Isi Program & Associated ISI Database Modified + (June 18, 1999)
- IR 05000315/1999012 + (June 18, 1999)
- IR 05000315/1999014 + (June 18, 1999)
- IR 05000387/1999301 + (June 18, 1999)
- ML17165A005 + (June 18, 1999)
- DCL-99-081, Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl + (June 18, 1999)
- ML17326A016 + (June 18, 1999)
- Press Release-99-127, Nuclear Regulatory Commissions Advisory Committee on Reactor Safeguards Has Scheduled a Joint Meeting of Two of Its Subcommittees on July 13 in Rockville, Maryland + (June 18, 1999)
- ML17326A019 + (June 18, 1999)
- ML18152A089 + (June 18, 1999)
- ML17241A376 + (June 18, 1999)
- ML17241A378 + (June 18, 1999)
- TAC:MA0965 + (June 18, 1999)
- ML20196B919 + (June 18, 1999)
- ML20196B092 + (June 18, 1999)
- ML20196H645 + (June 18, 1999)
- ML20196G402 + (June 18, 1999)
- 05000482/LER-1999-007, :on 990519,action Statement 19 of TS 3.3.2 Was Violated.Caused by Inadequate Work Practices.Revised Procedure & Discussed Expectations with Maint & Operations Personnel + (June 18, 1999)
- 05000282/LER-1999-006, :on 990519,discovered That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Caused by Inadequate Procedure.Util Has Quarantined Sps 1083 & 2083 Until Revs Are Completed + (June 18, 1999)
- ML20212H778 + (June 19, 1999)
- ML20196J548 + (June 19, 1999)
- ML20212J121 + (June 20, 1999)
- ML20212H951 + (June 20, 1999)
- ML20210P449 + (June 20, 1999)
- ML20196F218 + (June 20, 1999)
- ML17059C689 + (June 20, 1999)
- 05000277/LER-1999-004, :on 990521,multiple Unplanned Esfas Occurred During Planned Electrical Bus Restoration Following Maint Activities.Caused by Inadequate Configuration Control.Power Was Restored to 3E Transformer Per Plant Procedures + (June 20, 1999)
- ML17265A684 + (June 21, 1999)
- Press Release-99-128, NRC Takes Actions on Orphan Radioactive Sources + (June 21, 1999)
- ML17313A992 + (June 21, 1999)
- LR-N990273, Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed + (June 21, 1999)
- ML20196G865 + (June 21, 1999)
- ML20196G842 + (June 21, 1999)
- ML20196G562 + (June 21, 1999)
- ML20196G221 + (June 21, 1999)
- ML20196G180 + (June 21, 1999)
- IR 05000220/1999004 + (June 21, 1999)
- IR 05000354/1999003 + (June 21, 1999)
- ML20196F953 + (June 21, 1999)
- ML20196F944 + (June 21, 1999)
- ML20196F917 + (June 21, 1999)
- ML20196F058 + (June 21, 1999)
- ML20196E949 + (June 21, 1999)
- ML20196E923 + (June 21, 1999)
- ML20196E654 + (June 21, 1999)