Forwards Insp Repts 50-315/99-12 & 50-316/99-12 on 990503-21.No Violations Identified.Insp Was Exam of Activities Under License Re Implementation of Expanded Sys Readiness Review Program at DC Cook Units 1 & 2
ML17326A019
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/18/1999
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Powers R
AMERICAN ELECTRIC POWER CO., INC.
Shared Package
ML17326A020 List:
References
50-315-99-12, 50-316-99-12, NUDOCS 9906240250
Download: ML17326A019 (4)


See also: IR 05000315/1999012

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM

(RXDS)

ACCESSION NBR:9906240250

DOC.DATE: 99/06/18

NOTARIZED: NO

DOCKET

FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana

M

05000315

50-316 Donald C. Cook Nuclear Power Plant,

Unit, 2, Indiana

M

05000316

AUTH.NAME

AUTHOR AFFILIATION

GROBE,'J A.

Region

3

(Post

820201)

RECXP.NAME

RECIPXENT AFFILIATION

POWERS,R.PE

American Electric Power Co.,

Xnc.

SUBJECT: Forwards insp repts 50-315/99-12

& 50-316/99-12

on

990503-21.No violations identified.Insp was

exam of

activities under license re implementation of Expanded

Sys

Readiness

Review program at

DC Cook Units

1

E 2.

C

A

DISTRIBUTION CODE:

XE06F

'COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: Environ

8 Radiological

(50 DKT)-Insp Rept/Notice of Violation

NOTES:

Respons

E

RECIPIENT

ID CODE/NAME

LPD3-1

PD

INTERNAL: AEOD/TTC

NMSS/SFPO

NUDOCS-ABSTRACT

OGC/RP

ERNAL: NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

STANG, J

FXLE CE

PM XOLB

OE

RGN3

FILE

01

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

0

R

0

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

13

ENCL

13

June

18,

1999

Mr. R. P. Powers

Senior Vice President

Nuclear Generation Group

American Electric Power Company

500 Circle Drive

Buchanan, Ml 49107-1395

SUBJECT:

NRC INSPECTION REPORT 50-315/99012(DRS); 50-316/99012(DRS)

Dear Mr. Powers:

On May 21, 1999, the NRC completed a special inspection conducted at your Buchanan

Michigan Corporate facility. This inspection was an examination of activities under your license

as they relate to your implementation of the Expanded System Readiness

Review (ESRR)

program at your D. C. Cook Units 1 and 2 reactor facilities. The NRC understands that these

reviews are intended to provide assurance

that safety-related plant systems fulfilltheir design

basis safety functions and to determine system restart readiness.

The enclosed report

documents the results of the inspection.

Areas examined during the inspection are identified in the report. Within these areas, the

inspection consisted of a selective examination of procedures and representative

records and

interviews with personnel.

At the conclusion of the inspection, the findings were discussed with

members of your staff.

Overall, the implementation of the ESRR process including reviews conducted by the ESRR

teams to identify problems relating to electrical calculations were considered effective. Some of

the significant issues identified by the ESRR teams included the failure to update emergency

diesel generator steady state and dynamic load calculations, and battery calculations that did

not specify a minimum operable electrolyte temperature and did not calculate the voltage

available to the end devices.

We understand corrective actions are being developed to address

these concerns.

In accordance with 10 CFR 2.790 of the NRC'S "Rules of Practice," a copy of this letter, the

enclosure, and your response to this letter, ifyou choose to provide one, will be placed in the

NRC Public Document Room.

9906240250

9906i8

PDR

ADOCK 0500031.5

8

PDR

0

R. Powers

-2-

We willgladly discuss any questions you have concerning this inspection.

Sincerely,

Docket Nos. 50-315; 50-316

License Nos. DPR-58; DPR-74

Origina1 /s/ J. A. Grobe

John A. Grobe, Director

Division of Reactor Safety

Enclosure:

Inspection Report 50-315/99012(DRS); 50-316/99012(DRS)

cc w/encl:

A. C. Bakken III, Site Vice President

T. Noonan, Acting Plant Manager

M. Rencheck, Vice President, Nuclear Engineering

R. Whale, Michigan Public Service Commission

Michigan Department of Environmental Quality

Emergency Management

Division

Ml Department of State Police

D. Lochbaum, Union of Concerned Scientists

/

Distribution:

RRB1 (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/encl

J. Caldwell, Rillw/encl

B. Clayton, Rill w/encl

SRI D. C. Cook w/encl

DRP w/encl

DRS w/encl

Rill PRR w/encl

PUBLIC IE-01 w/encl

Docket File w/encl

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)

i $ 0()g ~

DOCUMENT NAME: G:)DRS(DCC99012.WPD

TO raoehe S

Of tttla deoumant, Indteata In the bean/

t. ~

Wltneut Sttadanenl/endeaure

'F s

Stltn Stladanent/endeaure

'H ~ NO

OFFICE

Rill

Rill

Rill

Rill

NAME

RMendez:tb iC

RGardn

L

g4 TVe el

JGrob

DATE

06////99

06!n/99

06/i'i/99

OFFICIALRECORD COPY

06/ t/9