Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17335A491 +
- ML17335A485 +
- ML20202C548 +
- ML20202C520 +
- ML20202A983 +
- ML20199L685 +
- ML20199L492 +
- ML20199L456 +
- ML20199L327 +
- ML20199L080 +
- 05000443/LER-1998-014, Forwards LER 98-014-00 for Event That Occurred at Seabrook Station on 981222.Encl 2 Is List of Util Commitments Made in Response to LER +
- ML20199L063 +
- ML20199L043 +
- ML20199K855 +
- ML20199K486 +
- 05000306/LER-1998-006, Forwards LER 98-006-00 Re Unplanned Actuation of ESF Equipment During Performance of Sp Due to Personnel Error. Event Was Reported Via ENS IAW 10CFR50.72 on 981219.Two New Commitments Are Indicated as C/A Statements +
- ML20199J263 +
- ML20199G543 +
- ML20205Q716 +
- ML20202D304 +
- ML20202D286 +
- ML20202D273 +
- ML20206S169 +
- B17004, Application for Amend to License NPF-49,revising TS Table 3.7-6, Area Temp Monitoring & Revising FSAR to Describe Full Core off-load Condition as Normal Evolution.Proprietary Rev 2 to HI-971843,encl.Proprietary Info Withheld +
- B17623, Application for Amend to License DPR-65,changing TS 3.6.1.2, Containment Sys - Containment Leakage +
- B17590, Application for Amend to License DPR-65,removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys, from Plant TS +
- B17631, Submits Response to NRC RAI Re non-certified Operator Position Which Is Identified in License Amend Request Table 6.2-1, Min Shift Crew Composition +
- CY-99-002, Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl +
- JAFP-99-0012, Documents Util Position Re Methodology for LPRM Calibr During Reactor Operation Using Traversing In-core Probe Sys +
- PY-CEI-NRR-2359, Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld +
- ML20199J563 +
- ML20204H917 +
- 05000348/LER-1998-008-01, :on 981223,reactor Vessel Support Concrete Design Bases Temperature Exceeded Due to Closed Cooling Damper.Caused by Personnel Error.Damper Opened & Secured in Position.With +
- 05000443/LER-1998-014-01, :on 981222,on Automatic Reactor Trip Occurred While at 100 Percent Power.Caused by Auxiliary Switch Linkage Pin in Breaker 163,fell Out Preventing Linkage from Actuating Auxiliary Contact.Breaker 163 Switch Reinstalled +
- 05000306/LER-1998-006-01, :on 981219,unplanned Actuation of ESF Equipment During Performance of Sp.Caused by Personnel Error.Control Room Took Prompt Action & Returned Plant to Proper Status & Second pre-job Briefing for SP-2126 Was Conducted +
- 05000482/LER-1986-073-01, Forwards LER 86-073-01,re Event in Which Wolf Creek TSs Were Not Met.Commitments Made by Util,Encl +
- ML20202G302 +
- ML20202D733 +
- ML20136B593 +
- 05000311/LER-1998-016, :on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With +
- 05000315/LER-1998-052-01, Forwards LER 98-052-01,re Potential Failure Mode for Air Operated Components Not Considered in Original Design. Interim LER Has Been Updated to Include Two Addl Instances of Same Failure Mode +
- ML20136B816 +
- 05000255/LER-1998-011, :on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Were Noted.Caused by Inadequate Design Change Process.Exemption from 10CFR50,App R Was Pursued +
- 05000482/LER-1986-073, :on 860102,leak Rate Testing of Containment H Purge Sys Was Not Performed IAW All Requirements of TS 3.6.1.7.Cause Identified as Mindset.Revised Procedure & SAR Changes +
- ML20199G534 +