- 05000302/LER-1983-052-03, /03L-0:on 831107,containment Monitoring Isolation Valve WSV-6 Failed Closed.Caused by Blown Fuse Due to Defective Light Bulb.Circuit Reenergized + (December 16, 1983)
- 05000336/LER-1983-030-01, /01T-0:on 831205,fuel Movement Took Place in Spent Fuel Pool,While Credit Taken for Facility Encl Bldg B Filtration Sys (Ebfs).Ebfs Inoperable Due to Installation of Temporary Wall Not Seismically Qualified + (December 16, 1983)
- 05000346/LER-1983-065-03, /03L-0:on 831117,Channel 1 Essential Conduit 38609A-1-1/2 Inch Inadequately Supported for Approx 30 Ft. Caused by Original Const Installation Error.Addl Supports Installed by 830909 + (December 16, 1983)
- 05000339/LER-1983-077-03, /03L-0:on 831120,fire Damper in Safeguards Ventilation Sys Found Failed in Closed Position.Caused by Failed Fire Damper Fusible Link.Link Replaced & Fire Damper Restored to Operable Status + (December 16, 1983)
- 05000362/LER-1983-105-03, /03L-0:on 831119 & 29,mini-purge Exhaust Containment Isolation Valve 3HV9825 Failed to Close within Max Isolation Time.Caused by Imbalance Between Opening Air Supply Pressure & Closing Spring Tension + (December 16, 1983)
- 05000366/LER-1983-138-03, /03L-0:on 831206,diesel Generator 2C(2R43-S001C) Could Not Be Shut Down W/Local or Control Room Stop Switch. Caused by Loose Governor Shutdown Solenoid Due to Engine Vibration.Solenoid Repositioned + (December 16, 1983)
- 05000366/LER-1983-131-03, /03L-0:on 831119,false Low Pressure Alarm Received in Main Control Room for Control Rod Scram Accumulator Hydraulic Unit 2C11-18-27.Caused by Setpoint Drift.Pressure Switch Recalibr + (December 16, 1983)
- 05000369/LER-1983-111-03, /03L-0:on 831117,detector Voltage Removed from Source Range Detectors for Channels N-31 & N-32,rendering Channels Inoperable.Caused by Personnel Error & Unclear Procedure.Detector Voltage Restored + (December 16, 1983)
- 05000373/LER-1983-148-03, /03L-0:on 831118,bus 142Y Deenergized & Switchgear 136X Equipment Failed to Loadshed.Caused by Main Sensing Contact Welding Closed.Contact Separated & Burnished + (December 16, 1983)
- 05000389/LER-1983-072-03, /03L-0:on 831116,during Full Power Operation, Personnel Airlock Failed Leak Test Surveillance.Airlock Equalizing Valve Flange Bolts Found Loose.Cause Unidentified.Bolts Tightened within 1 H + (December 16, 1983)
- 05000389/LER-1983-073-03, /03L-0:on 831114,while in Mode 1,outer Door on Escape Airlock Opened.Caused by Personnel Misunderstanding. Personnel Involved Counseled as to Importance of Adhering to Tech Spec Requirements + (December 16, 1983)
- 05000395/LER-1983-131-03, /03L-0:on 831124,pressurizer Pressure Trip Bistable PB-455D Began Alternately Tripping & Resetting. Caused by Electronic Component Failure.Defective Circuit Board Replaced & Channel Returned to Svc + (December 16, 1983)
- ML20133B832 + (December 16, 1983)
- ML20127M141 + (December 16, 1983)
- ML20059D609 + (December 16, 1983)
- ML18045A002 + (December 16, 1983)
- ML18026A826 + (December 16, 1983)
- L-83-591, Requests Relief from Tech Spec 4.2.1 Inservice Insp Requirements & Specific ASME Code Edition to Perform Visual Exam (VT2) in Lieu of Volumetric & Surface Exam Requirements + (December 16, 1983)
- L-83-590, Informs That Results of Detailed Analysis of Data from Natural Circulation Cooldown/Boron Mixing Test Expected by End of 1983.Meeting W/Southern California Edison Re Commercial Aspects of Using Data Scheduled for Wk of 840101 + (December 16, 1983)
- ML17320A896 + (December 16, 1983)
- L-81-012, Forwards NEDC-30291, Alternate Shutdown Sys for Monticello Nuclear Generating Plant,Northern States Power Co, in Response to Generic Ltr 81-12 & NRC . Detailed Design Efforts in Progress + (December 16, 1983)
- ML13310B121 + (December 16, 1983)
- ML17345B384 + (December 16, 1983)
- ML052990387 + (December 16, 1983)
- ML19270B537 + (December 16, 1983)
- ML20079F511 + (December 16, 1983)
- ML13310B120 + (December 16, 1983)
- ML20127M742 + (December 16, 1983)
- ML20087B628 + (December 17, 1983)
- ML20083B506 + (December 17, 1983)
- L-83-593, Forwards Addl Info Requested by Re Operational Limits Tech Spec Amend + (December 17, 1983)
- ML17324A227 + (December 17, 1983)
- ML17324A160 + (December 17, 1983)
- ML17324A157 + (December 17, 1983)
- ML20207A369 + (December 17, 1983)
- ML20087H031 + (December 18, 1983)
- Information Notice 1983-83, Use of Portable Radio Transmitters Inside Nuclear Power Plants + (December 19, 1983)
- NRC Generic Letter 1983-43 + (December 19, 1983)
- NRC Generic Letter 1983-42 + (December 19, 1983)
- ML17255A567 + (December 19, 1983)
- ML18089A480 + (December 19, 1983)
- ML18089A472 + (December 19, 1983)
- ML18141A277 + (December 19, 1983)
- NRC Generic Letter 83-43, Reporting Requirements of 10 CFR 50, Sections 50.72 and 50.73, and Standard Technical Specifications + (December 19, 1983)
- NRC Generic Letter 83-42, Clarification to GL 81-07 Regarding Response to NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants" + (December 19, 1983)
- ML20086J762 + (December 19, 1983)
- ML20086J755 + (December 19, 1983)
- ML20086J601 + (December 19, 1983)
- ML20086G774 + (December 19, 1983)
- ML20086G686 + (December 19, 1983)
- ML20086G502 + (December 19, 1983)
- ML20083J299 + (December 19, 1983)
- ML20083J286 + (December 19, 1983)
- ML20083H766 + (December 19, 1983)
- ML20083G860 + (December 19, 1983)
- ML20083G856 + (December 19, 1983)